Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical PO SORBHOG PS SORBHOG BARPETA PIN 781317 | BARPETA | ASSAM | 781317 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹33.9 L
EMD Value
₹79,989
Closing Date
1 Jul 2026, 2:00 pmClosed
Chief General Manager (PPandD)
Bijulee Bhawan, Paltanbazar
Construction of Boundary Wall works at 132/33 kV Hajo GSS, AEGCL
2026_AEGCL_52696_1
AEGCL/DGM(Civil)/2026-27/01
Open Tender
Civil Works
Works
120 days
132/33 kV GSS, AEGCL, Hajo
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹79,989
2 Jul 2026
10 Jun 2026
2 Jul 2026
10 Jun 2026
1 Jul 2026
17 Jun 2026
10 Jun 2026 - 16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Works | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/
manual means over areas (exceeding 30 cm in depth, 1.5 m in width as
well as 10 sqm on plan) including getting out and disposal of excavated
earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
All kinds of soil | 507.9 | cum | - | - |
| 1.02 | Dry brick on edge flooring in required pattern with bricks of class
designation 7.5 on a bed of 12 mm mud mortar, including filling joints
with local sand, with common burnt clay non modular bricks. | 121.52 | sqm | - | - |
| 1.03 | Providing and laying in position cement concrete of specified grade
excluding the cost of centering and shuttering - All work up to plinth level :- 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 12.15 | cum | - | - |
| 1.04 | Steel reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more. | 7,884.93 | kg | - | - |
| 1.05 | Centering and shuttering including strutting, propping etc. and removal
of form for Foundations, footings, bases of columns, etc. for mass
concrete | 805.58 | sqm | - | - |
| 1.06 | Providing and laying in position specified grade of reinforced cement
concrete, excluding the cost of centering, shuttering, finishing and
reinforcement - All work up to plinth level :- 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 78.18 | cum | - | - |
| 1.07 | Brick work with common burnt clay modular bricks of class designation
7.5 in foundation and plinth in:- Cement mortar 1:4 (1 cement : 4 coarse sand) | 43.75 | cum | - | - |
| 1.08 | Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm) | 700 | sqm | - | - |
| 1.09 | Structural steel work in single section, fixed with or without connecting
plate, including cutting, hoisting, fixing in position and applying a priming
coat of approved steel primer all complete. | 6,262.2 | kg | - | - |
stage.html
html • 0.04 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BidDocumentHajo.pdf
Tender Documents • 1.08 MB
BOQ_83185.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .