| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | -12.60% | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 Cr+₹18.5 L (12.0%)Admitted-Finance 0 SUBHASH NAGAR SIFHPURA SIDHPURA ETAH UTTAR PRADESH 207246 | KASGANJ | UTTAR PRADESH | 207246 | -2.10% | ₹1.7 Cr+₹18.5 L (12.0%) | L2 | Admitted-Finance |
| 3 | L3₹1.7 Cr+₹19.0 L (12.4%)Admitted-Finance | -1.80% | ₹1.7 Cr+₹19.0 L (12.4%) | L3 | Admitted-Finance |
Tender Value
₹2.1 Cr
EMD Value
₹20.8 L
Closing Date
27 Jun 2026, 3:00 pmClosed
EO NP GAWAN
OFFICE NP GAWAN SAMBHAL
1-NP GAWAN ME BABRALA CHAURAHE KE PAS OTARI KE MAKAN SE HARIBABA INTERCOLLEGE TAK CC ROAD V NALI MARAMMAT KA KARYA.
2026_DOLBU_1162181_1
1633/NPG/2026-27 DT 17/06/2026 T2
Open Tender
Civil Works
Percentage
60 days
GAWAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹27,003
EO NAGAR PANCHAYAT GAWAN
₹20.8 L
Yes
1 Aug 2026
19 Jun 2026
29 Jun 2026
19 Jun 2026
27 Jun 2026
19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M-150 brick work in 1 part of cement and four part of coarse sand mortar. (1:4) in foundation and plinth complete. (SI No. 307) | 202.4 | Cum | 5,150 | ₹10,42,360 |
| 2 | 12mm thik plaster with Cement & C.sand mortar in 1:3 etc. required for proper completion of the work.(SI 583) | 2,300 | Sqm | 200 | ₹4,60,000 |
| 3 | Cement Concrete with 2cm. guage app. stone Grit, coarse sand and cement in proportion of 4:2:1 includingall labour, ,labour cess,taxes etc.supply of all meterials and T&P etc. required for proper completion of work. (SI No. 279a) | 65.8 | Cum | 6,700 | ₹4,40,860 |
| 4 | Construction of granular sub- base by providing well graded material spreading in uniform layers with mother grader on prepared surface mixing by mix in place method with rootavator at OMC and compacting with smooth wheeled roller to achieve the desined density complete as pr technical specifications Clauses 401 | 680.8 | Cum | 3,824.2 | ₹26,03,515.36 |
| 5 | Cement concrete with 2 cm guage approved stone grit, coarse sand &cement in proportion of 3:1½:1 in pavement as per design thick for CC Road in concrete mixture not less then 0.2 cum capicity using 125 micron thick polythene film, wedges steel plates including levelling the form work including Making Expansion/ contraction joints &filling approved filler materials in joints also including cloth for curring of concrete pavements for not less then 14 days and water finishing to lines &grade including supply orf all material, labour,all taxes , royalty ,T &P ets. requried for proper complation of work as per direction of Engineer in charge.( As per Pwd SOR Chapter-20,New Item-3) | 1,757.05 | Cum | 7,350 | ₹1,29,14,317.5 |
| 6 | R.C.C. Work with cement approved coarse sand and 2cm. gauge approved stone grit in proportion of 1:1.5:3 in beams, columns etc. excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply of all meterials, labour and T&P etc. required for proper completion of work. (SI 289) | 7.68 | Cum | 8,650 | ₹66,432 |
| 7 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work including bending for proper completion of the work and including supply of all steel and binding wire etc. (SI 504) | 7.23 | Qtls. | 8,200 | ₹59,286 |
| 8 | Providing wall putty on new surface with approved quality material of Berger /J.K./Birla or similar make 2coats with complete on side work chapter 15 in New Item no 12. | 300 | sqm | 57 | ₹17,100 |
| 9 | Finishing wall with on coat of water proof cement paint /anaval paints /weather coat of approved quality on previously new surface with this paint to give an even shade including supply of all material labour, tools & paints required for proper completion of the work chapter 15 in new item no 08 etc. | 300 | sqm | 85 | ₹25,500 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.87 MB
BOQ_2178378.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .