Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-Finance | ₹3.2 L | L1 | Accepted-Finance Lowest Quoted Amount |
| 2 | L2₹3.3 L+₹14,929.78 (4.68%)Rejected-Finance | ₹3.3 L+₹14,929.78 (4.68%) | L2 | Rejected-Finance Higher quoted Amount |
| 3 | L3₹3.4 L+₹18,562.33 (5.81%)Rejected-Finance | ₹3.4 L+₹18,562.33 (5.81%) | L3 | Rejected-Finance Higher quoted Amount |
| 4 | L4₹3.5 L+₹25,827.43 (8.09%)Rejected-Finance FIRST FLOOR NH 701 KUPWARA BYEPASS KUPWARA JAMMU KASHMIR 193222 | KUPWARA | JAMMU AND KASHMIR | 193222 | ₹3.5 L+₹25,827.43 (8.09%) | L4 | Rejected-Finance Higher quoted Amount |
| 5 | L5₹3.5 L+₹31,058.31 (9.73%)Rejected-Finance | ₹3.5 L+₹31,058.31 (9.73%) | L5 | Rejected-Finance Higher quoted Amount |
Tender Value
₹3.6 L
EMD Value
₹7,265
Closing Date
12 Aug 2026, 2:00 pmClosed
DFO Kehmil
Kralpora
Construction and Installation of in-situ Boundary Pillars at Dodiniyal Forest keran Range Kehmil Forest Division
2026_FD_318383_2
NIT No 02 of 2026 Dated 29-07-2026
Open Tender
Agricultural or Forestry
Percentage
60 days
Kehmil
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
0406-Forest
₹7,265
Yes
19 Aug 2026
6 Aug 2026
13 Aug 2026
6 Aug 2026
12 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in excavation in foundation trenches or drains (not exceeding 1.5 mts in width as well as 10 sqmts on plan) including dressing of sides & ramming of bottoms, lift up to 1.5mts & lead of 50 mts including getting out the excavated soil and disposal of surplus excavated soil as directed.No. of Pillars =52 Pillar :L=3+2.5 /2 =2.75 ; B=2.75+1.75 /2 =2.25 | 27.34 | CUM | 479.3 | ₹13,104.06 |
| 2 | Providing & laying dry stone solling including ramming, dressing etc complete in foundations and under floors,including carriage & head load complete Job. Pillar, Back Filling | 7.71 | CUM | 1,000 | ₹7,710 |
| 3 | Providing & laying in position cement concrete (1cement:4coarse sand:8 graded stone agg 40mm nominal size) mix of specificied grade excl cost of centering and shuttering. Crushed agg. All work upto plinth level. Pillar | 2.73 | CUM | 5,202.9 | ₹14,203.92 |
| 4 | Providing & laying cement concrete 1:3:6 mix using 1 cement : 3 coarse sand : 6 graded stone aggregate 20 nominal size of specificied grade excl cost of centering and shuttering. All works up to plinth Level. Pillar plug/coping | 4.01 | CUM | 5,733.6 | ₹22,991.74 |
| 5 | Reinforced cement concrete work in walls (any thickness ) including attached pilasters,buttresses,plinth and string courses,fillets,columns,pillars,piers,abutments,posts and struts upto floor five level , in 1:1 1/2:3 upto five level including curing but excluding the cost of centring, shuttering,finishing and reinforcement. Raft , Pillar | 9.2 | CUM | 9,395.7 | ₹86,440.44 |
| 6 | Centering and shuttering including strutting, propping etc and removal of form work for. Raft ,Pillar Complete Job | 100.55 | SM | 286.35 | ₹28,792.49 |
| 7 | Reinforcement for RCC work incl. Straightening , bending and placing in position and binding all complete ending and placing in position and binding all complete including all carriages complete Job | 776.85 | KG | 123.2 | ₹95,707.92 |
| 8 | 12 mm thick cement plaster in 1: 4 cement mortar Pillar, Plug | 73.67 | SM | 353.1 | ₹26,012.88 |
| 9 | Finishing walls with textured exterior paint of required shade on new work (two or more coats applied @3.28 litre/10sqm over and including base coat of water proofing cement paint @2.20 kg/10sqm .including making of Prescribed Departmental LOGO on all Boundary Pillars with writing of Geo-locations (Exterior finishing) Sand av. lead 80 Kms | 54.35 | SM | 265.95 | ₹14,454.38 |
| 10 | Carriage of material by Mechanical Transport from Source upto dumping site of workb) a Sand av lead 80 km | 7.01 | CUM | 1,072.34 | ₹7,517.1 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_1059819.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .