Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.1 LAccepted-AOC 521 UBI ROAD SINGRAULI SINGRAULI SINGRAULI MADHYA PRADESH 486889 | SINGRAULI | MADHYA PRADESH | 486889 | L-1 | Accepted-AOC As per NIT | |
| 2 | Rejected-Technical 7 1 3RD AND 4TH FLOOR MAGADI MAIN ROAD NEAR MAGADI ROAD METRO STATION NEAR MAGADI ROAD METRO STATION BANGALORE KARNATAKA 560023 | BENGALURU URBAN | KARNATAKA | 560023 | - | Rejected-Technical Not, evaluated as not L-1 | |
| 3 | Rejected-Technical | - | Rejected-Technical Not, evaluated as not L-1 |
Tender Value
₹6.7 L
EMD Value
₹8,400
Closing Date
26 Jun 2023, 12:00 pmClosed
Staff Officer (EnM)
Office of the General Manager Khadia Area Sonbhadra 231222 (UP)
Testing and calibration of protective relays along with the testing of CTs, PTs, and transformers installed at Coal and OB substation of Khadia Project
2023_NCL_281525_1
KHD/EM/E-Tender/23-24/140 DT 14.06.2023
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
GM Office Khadia
Please refer NIT
4 documents required · 4 mandatory
₹8,400
5 Dec 2023
15 Jun 2023
27 Jun 2023
15 Jun 2023
26 Jun 2023
16 Jun 2023
15 Jun 2023 - 22 Jun 2023
Amount
Testing and calibrating of all relays like 3 Phase IDMT Overcurrent Relay, Earth fault relay, Earth leakage relay, differential relay, MPR etc. of electric panels installed at OB and Coal Sub-station of Khadia Project including submission of test certificate (the work shall be executed at the site). Note: - Contractor should possess all the standard equipment for testing of relays including following: - a) 3- phase secondary injection kit with ranges 1-500 Ampere or above b) Primary injection kit with range of 1 – 2500 A or above c) HT pressure test set 33 kV and above. And other necessary equipment as per requirement of work Calibration to be done in respect of standard equipment tested at Govt. Laboratories and should possess test certificate for all testing equipment at the time of test. (As per Scope of work)
Testing of CTs, CBCTs and PTs
Testing of transformers
Total impact of GST for the purpose of CTC
ARK POWER SOLUTIONS PRIVATE LIMITED
SUNNY ELECTRIC & REFRIGERATION ENGINEERING
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .