Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹25.9 LAccepted-AOC | ₹25.9 L | 1 | Accepted-AOC Accepted |
| 2 | 2₹25.9 LRejected-Finance | ₹25.9 L | 2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | R R Construction L2 | Rajachidambaram L1 |
|---|---|---|---|---|---|
| 1.00Part.1 Construction of First Floor Two Classroom Building over the existing Ground Floor Two Classroom Building (PUES) at Pattukudi In Govindanattuchery Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per specification etc.,complete for foundation. | 0.29 | Cu.m | 265 ₹76.85 | 263 ₹76.27 |
| 3.00 | Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications., etc complete | 0.14 | Cu.m | 2,260 ₹316.40 | 2,255 ₹315.70 |
| 4.00 | Cement concrete 1:4:8 mix (one cement four sand and eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication. | 0.14 | Cu.m | 6,060 ₹848.40 | 6,050 ₹847 |
| 5.00 | Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. | 27.27 | Cu.m | 10,200 ₹2.8 L | 10,200 ₹2.8 L |
| 6.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete.(Below Basement) | 36.37 | Cu.m | 6,500 ₹2.4 L | 6,490 ₹2.4 L |
| 7.00 | Supplying and erecting centering for sides and soffits of RCC slabs of plane surface like lintels, beams etc., including strutting 3m high using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.S angles of size 25mm x 25mm x '3mm laid over silver Oak (C.W) joists of size 10cm x 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification. (Below Basement) | 47.27 | Sq.m | 1,205 ₹56,960.35 | 1,204 ₹56,913.08 |
| 8.00 | Supplying and erecting centering for sides and soffits of RCC slabs of plane surface like lintels, beams etc., including strutting 3m high using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.S angles of size 25mm x 25mm x '3mm laid over silver Oak (C.W) joists of size 10cm x 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification. (Above Basement) | 19.93 | Sq.m | 1,205 ₹24,015.65 | 1,204 ₹23,995.72 |
| 9.00 | Supplying and erecting centering for sides and soffits of RCC slabs of plane surface like lintels, beams etc., including strutting 3m high using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.S angles of size 25mm x 25mm x '3mm laid over silver Oak (C.W) joists of size 10cm x 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification. (Above Basement) | 170.28 | Sq.m | 1,095 ₹1.9 L | 1,095 ₹1.9 L |
| 10.00 | Suppling, fabricating and placing in position of MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors as per standard specification. | 3.45 | M.T | 91,900 ₹3.2 L | 91,895 ₹3.2 L |
Tender Value
₹26.1 L
EMD Value
₹26,120
Closing Date
20 Mar 2026, 3:00 pmClosed
Block Development Officer
Block Development Office, Papanasam,Thanjavur District
Construction of First Floor Two Classroom Building Over the existing Ground Floor Two Classroom Building (PUES) at Pattukudi in Govindanattuchery Panchayat in Thanjavur District under PUGF 2025-2026
2026_RDTN_674521_1
Rc.No.2668/2025/A2 dated 12.03.2026.
Open Tender
Civil Works - Buildings
180 days
Block Development Office, Papanasam, Thanjavur Dist
AsperTenderbiddocument
7 documents required · 7 mandatory
₹0
₹26,120
Yes
21 May 2026
13 Mar 2026
20 Mar 2026
13 Mar 2026
20 Mar 2026
13 Mar 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: BLOCK DEVELOPMENT OFFICER (B.P), PAPANASAM BLOCK IN THANJAVUR DISTRICT.
Name of Work: THANJAVUR DISTRICT - PUGF- 2025-2026. Part.1 Construction of First Floor Two Classroom Building over the existing Ground Floor Two Classroom Building (PUES) at Pattukudi In Govindanattuchery Panchayat
Papanasam Block.
Name of the Bidder/ Bidding Firm / Company :
1 Part.1 Construction of First Floor Two Classroom Building over the existing Ground Floor Two Classroom Building (PUES) at Pattukudi In Govindanattuchery Panchayat
2 Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per specification etc.,complete for foundation. 0.000 Cu.m Excess(+) Full Conversion INR
3 Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications., etc complete 0.000 Cu.m Excess(+) Full Conversion INR
4 Cement concrete 1:4:8 mix (one cement four sand and eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication. 0.000 Cu.m Excess(+) Full Conversion INR
5 Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. 0.999 Cu.m Excess(+) Full Conversion INR
6 Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete.(Below Basement) 0.999 Cu.m Excess(+) Full Conversion INR
7 Supplying and erecting centering for sides and soffits of RCC slabs of plane surface like lintels, beams etc., including strutting 3m high using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.S angles of size 25mm x 25mm x '3mm laid over silver Oak (C.W) joists of size 10cm x 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification. (Below Basement) 0.000 Sq.m Excess(+) Full Conversion INR
8 Supplying and erecting centering for sides and soffits of RCC slabs of plane surface like lintels, beams etc., including strutting 3m high using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.S angles of size 25mm x 25mm x '3mm laid over silver Oak (C.W) joists of size 10cm x 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification. (Above Basement) 0.999 Sq.m Excess(+) Full Conversion INR
9 Supplying and erecting centering for sides and soffits of RCC slabs of plane surface like lintels, beams etc., including strutting 3m high using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.S angles of size 25mm x 25mm x '3mm laid over silver Oak (C.W) joists of size 10cm x 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification. (Above Basement) 0.000 Sq.m Excess(+) Full Conversion INR
10 Suppling, fabricating and placing in position of MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors as per standard specification. 0.000 M.T Excess(+) Full Conversion INR
11 Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. 0.000 Sq.m Excess(+) Full Conversion INR
12 Plastering with cm 1:5 mix (one cement and five sand) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications. 0.000 Sq.m Excess(+) Full Conversion INR
13 Weathering course concrete using best quality broken brick jelly of size 20mm in pure slacked lime over the RCC roof slab in th proportion of brick jelly to lime being32:12.5 by the volume and laid over a single layer and consolidated to the required size 0.000 Sq.m Excess(+) Full Conversion INR
14 Finishing the top of the roof with one course of Machine PressedTiles of size 23x23x2 cm of approved quality laid in CEMENT MORTAR 1:3(One cement and three sand) 12 mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar,red oxide, etc., complete complying with standard specification 0.000 Sq.m Excess(+) Full Conversion INR
15 Floor finishing with Kota Stones of size 60cmx60cm including cost and conveyance of all materials to site and all labour charges etc complete 0.000 Sq.m Excess(+) Full Conversion INR
16 Floor finishing with Special Type of Flooring tiles (Cement Based hydraullically pressed anti skirt tiles CM 1.3 , 20 Thick including cost and conveyance of all materials to site and all labour charges etc complete 0.000 Sq.m Excess(+) Full Conversion INR
17 Supplying and fixing of steel doors, ventilators and windows including cost of steel plates, angles , labour charges etc complete 0.000 Nos. Excess(+) Full Conversion INR
18 Supplying and fixing of steel doors, ventilators and windows including cost of steel plates, angles , labour charges etc complete 0.000 Nos. Excess(+) Full Conversion INR
19 Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distember, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). For INNER WALL and Ceiling. 0.999 Sq.m Excess(+) Full Conversion INR
20 Painting two coats of newly plastered wall surface with ready mixed Plastic Emulsion Paint of First quality of approved colour over a Priming Coat including thorough scrapping, clean removal of dirt and including necessary plaster of paris putty wherever required etc, complete complying with standard specification (including primer).For OUTER WALL Surface. 0.000 Sq.m Excess(+) Full Conversion INR
21 Painting two coats of black board paint including cost and conveyance of paint and all labour charges etc complete 0.999 Sq.m Excess(+) Full Conversion INR
22 Painting two coats over new iron works using ready mixed enamel paint inculding cost and conveyance of materials and all labour charges etc.,complete 0.000 Sq.m Excess(+) Full Conversion INR
23 Wiring with 2 x 1.5 sq.mm. (22/0.3) PVC insulated SC unsheathed copper conductor of 1100V grade insuitable PVC rigid pipe on wall and ceiling with PVC accessories and with TW switch box and 5A FT switch with painting of suitable colour for open PVC light point / fan point (for electronic regulator) (5 points per coil) (SD 18) 0.000 Nos. Excess(+) Full Conversion INR
24 Wiring with 2 x 1.5 sq.mm. (22/0.3) PVC insulated SC unsheathed copper conductor of 1100V grade insuitable PVC rigid pipe on wall and ceiling with PVC accessories and with TW switch box and 5A FT switch with painting of suitable colour for open PVC light point / fan point (for electronic regulator) (5 points per coil) (SD 18) 0.000 Nos. Excess(+) Full Conversion INR
25 Supply and fixing of 1200 mm ( 48") AC ceiling fan complete with stepped electronic 300 W regulator with 300 mm down rod on the existing clamp. (SD 110) 0.000 Nos. Excess(+) Full Conversion INR
26 LED Tube Light 0.000 Nos. Excess(+) Full Conversion INR
27 Wiring with 2 x 1.5 sq.mm. (22/0.3) PVC insulated SC unsheathed copper conductor of 1100V grade insuitable PVC rigid pipe concealed in wall and ceiling with PVC accessories in flush with wall with 150mm x 100mm x 113mm TW switch box with 3mm thick hylem sheet cover for 5A 3pin non interlocking wall socket with 5A flush type switch with continuous earth wire connection of 14 SWG TC wire and making good of the concealed portion with suitable colour for concealed PVC plug point (SD 38) 0.000 Rm Excess(+) Full Conversion INR
28 Service Wire 0.000 Nos. Excess(+) Full Conversion INR
29 16Amps Switch 0.000 Nos. Excess(+) Full Conversion INR
30 Providing and fixing of PVC rain water down fall pipe 110mm dia with necessary T W Clamps, Plug, Shoes, bend, Screws, nails etc., complete 0.000 Rm Excess(+) Full Conversion INR
31 Supplying and fixing cuddapah slab for cupboard shelf 0.000 Sq.m Excess(+) Full Conversion INR
32 roviding Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on wor 0.999 Sq.m Excess(+) Full Conversion INR
33 Supplying and fixing Grill Works necessary shoes, bends,& clamps etc.,( GF and FF) 0.000 Sq.m Excess(+) Full Conversion INR
34 BaLA painting 0.000 Nos. Excess(+) Full Conversion INR
35 Magnetic Green fibre Board 0.000 Nos. Excess(+) Full Conversion INR
36 Display Notice board 0.000 Nos. Excess(+) Full Conversion INR
37 Shoe rack 0.000 Nos. Excess(+) Full Conversion INR
38 Green Fibre Board 0.000 Nos. Excess(+) Full Conversion INR
39 Windows Acrylic Sheet 6mm thick At Bottom portion of Steel window of size 300mmx 1200mm( 6 Nos) 0.000 Nos. Excess(+) Full Conversion INR
40 500Lit PVC Tank 0.000 Nos. Excess(+) Full Conversion INR
41 Rainwater Harvesting Structure 0.000 Nos. Excess(+) Full Conversion INR
42 Provision for Water Purifier 0.000 Nos. Excess(+) Full Conversion INR
43 Provision for name board charges 0.000 Nos. Excess(+) Full Conversion INR
44 GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} 0.000 GST Amount (in Rupees) Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
GovindanattucheryTB.pdf
Tender Documents • 0.70 MB
GovindanattucheryPB.pdf
Tender Documents • 0.48 MB
BOQ_810725.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid