| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.3 Cr+₹2.9 L (2.29%)Rejected-Finance 135 CHAKRANA TIWARI CHAKA NAINI PRAYAGRAJ 211008 UTTAR PRADESH | PRAYAGRAJ | UTTAR PRADESH | 211008 | ₹1.3 Cr+₹2.9 L (2.29%) | L2 | Rejected-Finance Not being lowest |
| 3 | L3₹1.3 Cr+₹4.2 L (3.34%)Rejected-Finance 6 RAILWAY STATION ROAD ONKAR INDUSTRIES GULAMALI PURA BAHRAICH UTTAR PRADESH 271801 | BAHRAICH | UTTAR PRADESH | 271801 | ₹1.3 Cr+₹4.2 L (3.34%) | L3 | Rejected-Finance Not being lowest |
| 4 | L4₹1.3 Cr+₹4.8 L (3.83%)Rejected-Finance B 56 LANE NO 4A SECTOR 7 VASHNAVI ENCLAVE CHANNI HIMAT JAMMU 180015 | JAMMU | JAMMU AND KASHMIR | 180015 | ₹1.3 Cr+₹4.8 L (3.83%) | L4 | Rejected-Finance Not being lowest |
| 5 | L5₹1.3 Cr+₹6.0 L (4.77%)Rejected-Finance 29 MODEL TOWN BEHIND GURUDWARA PATHANKOT | PATHANKOT | PATHANKOT | PUNJAB | 145001 | ₹1.3 Cr+₹6.0 L (4.77%) | L5 | Rejected-Finance Not being lowest |
| Sl No | Description | Qty | Unit | vijay builders L2 | M/S Inderjit Sharma and Co. L8 | MOHAN LAL AND SONS L3 | kailu construction co L5 | PROACH ASSOCIATES BUILDERS & ENGINEERS L7 | ANIKET TRADERS L4 | M/S MARSHAL TRADERS L1 | jaima electricals L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking out unserviceable PCC/RCC poles HT and LT any type and size all as directed. | 20 | Each | 1,000 ₹20,000 | 500 ₹10,000 | 1 ₹20 Lowest | 500 ₹10,000 | 200 ₹4,000 | 100 ₹2,000 | 700 ₹14,000 | 500 ₹10,000 |
| 2.00 | Taking out unserviceable steel poles HT and LT any type and size all as directed. | 6 | Each | 600 ₹3,600 | 800 ₹4,800 | 1 ₹6 Lowest | 500 ₹3,000 | 290 ₹1,740 | 100 ₹600 | 800 ₹4,800 | 300 ₹1,800 |
| 3.00 | Taking out unserviceable saty assembly complete any type and size all as directed. | 6 | Each | 200 ₹1,200 | 200 ₹1,200 | 1 ₹6 Lowest | 200 ₹1,200 | 100 ₹600 | 100 ₹600 | 200 ₹1,200 | 300 ₹1,800 |
| 4.00 | Taking out unserviceable insulator any type and size all as directed. | 18 | Each | 100 ₹1,800 | 5 ₹90 | 1 ₹18 Lowest | 50 ₹900 | 10 ₹180 | 10 ₹180 | 20 ₹360 | 50 ₹900 |
| 5.00 | Taking out unserviceable Cross arms any type and size all as directed. | 3 | Quintal | 100 ₹300 | 400 ₹1,200 | 1 ₹3 Lowest | 500 ₹1,500 | 100 ₹300 | 100 ₹300 | 3,000 ₹9,000 | 50 ₹150 |
| 6.00 | Taking out unserviceable ACSR conductor HT and LT any type and size all as directed.Note : (i) Unsv materials retrieved from site should be deposited in MES store by the contractor.
(ii) Cost of transportation of unserviceable materials from the site to MES store deemed to be included in the quoted rates. | 5.2 | Quintal | 600 ₹3,120 | 1,000 ₹5,200 | 1 ₹5.2 Lowest | 500 ₹2,600 | 100 ₹520 | 100 ₹520 | 8,600 ₹44,720 | 100 ₹520 |
| 7.00 | Excavating in trenches, not exc 1.5 m wide and not exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, and for laying of cable or pipes etc. not exc 10 sqm on plan and not exc 1.5 m in depth and getting out in any type of soil, complete all as specified and as directed. | 644.63 | Cubic metre | 250 ₹1,61,157.5 | 180 ₹1,16,033.4 | 70 ₹45,124.1 Lowest | 200 ₹1,28,926 | 120 ₹77,355.6 | 140 ₹90,248.2 | 300 ₹1,93,389 | 200 ₹1,28,926 |
| 8.00 | Returning, filling in (soil) including spreading, levelling, watering and well ramming in layers not exceeding 25cm thick in any type of soil, complete all as specified and as directed. | 558.58 | Cubic metre | 150 ₹83,787 | 50 ₹27,929 | 2 ₹1,117.16 Lowest | 50 ₹27,929 | 20 ₹11,171.6 | 40 ₹22,343.2 | 130 ₹72,615.4 | 150 ₹83,787 |
| 9.00 | Removing excavated material not exc. 50m and depositing where directed at a level not exc. 1.5 m above the starting point, complete all as specified and as directed. | 86.05 | Cubic metre | 150 ₹12,907.5 | 50 ₹4,302.5 | 2 ₹172.1 Lowest | 50 ₹4,302.5 | 20 ₹1,721 | 40 ₹3,442 | 150 ₹12,907.5 | 60 ₹5,163 |
| 10.00 | M & L for providing earthing with GI earth plate electrode 600 X 600 X 6mm buried directly in ground (earth pit not less than 2.25M deep below ground level ) with top edge of the earth plate not less than 1.5M below ground level connected to GI strip 32 x 6mm thick for earthing lead fixed by means of nuts,bolt,washers etc connected to earth test point complete all as specified in electrical plate NO 3 of SSR 1996 part 1 ,including necessary excavation and earth work in any strata of soil,comman salt, charcoal dust, 40 mm dia light grade GI pipe for protection to earth lead, GI water pipe 20mm dia with funnel &wire mesh , PCC pit with CI cover and frame etc all as specified and directed by Engineer-in-charge. Note:- All the joints shall be made with welding to get proper conductivity. | 18 | Each | 5,000 ₹90,000 | 6,000 ₹1,08,000 | 1,700 ₹30,600 Lowest | 6,500 ₹1,17,000 | 3,400 ₹61,200 | 5,000 ₹90,000 | 6,000 ₹1,08,000 | 4,200 ₹75,600 |
Tender Value
₹1.4 Cr
EMD Value
₹2.2 L
Closing Date
15 Jan 2026, 6:00 pmClosed
Col Neelima CWE
HQ CWE Udhampur
SPL REPAIR / REPLACEMENT OF 2 POLE / 4POLE STRUCTURES INTO RING MAIN UNITS AND OH TO UG CABLES AT 1 FOD, MAP ACCN, 87 BDE AND OTHER LOCATIONS UNDER GE (UTILITIES) UDHAMPUR
2025_MES_745135_1
CWE/U(U)-80/2025-26
Open Tender
Civil Works
Item Rate
180 days
UDHAMPUR
As per NIT
7 documents required · 7 mandatory
₹1,000
Yes
GE (UTILITIES) UDHAMPUR
₹2.2 L
20 Feb 2026
18 Dec 2025
17 Jan 2026
18 Dec 2025
15 Jan 2026
8 Jan 2026
Taking out unserviceable PCC/RCC poles HT and LT any type and size all as directed.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
BOQ_834356.xls
BOQ • 0.39 MB
Tender.pdf
Tender Documents • 1.83 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .