| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC | ₹1.7 Cr | L1 | Accepted-AOC Lowest rates |
| 2 | L2₹1.8 CrRejected-AOC CHEEMA MAIN ROAD CHEEMA SANGRUR PUNJAB 148029 | SANGRUR | PUNJAB | 148029 | ₹1.8 Cr | L2 | Rejected-AOC High rates |
| 3 | L3₹1.8 CrRejected-Finance 01 ENTERPRISES | ₹1.8 Cr | L3 | Rejected-Finance High rates |
| 4 | L4₹1.9 CrRejected-Finance NEAR VILL TEPLA NANHERI TEHSIL GHANAUR DISTRICT PATIALA | ₹1.9 Cr | L4 | Rejected-Finance High rates |
| Sl No | Description | Qty | Unit | OM PARKASH CONTRACTOR L3 | SINGLA ENTERPRISES L4 | SUKHPAL BANSAL CONTRACTOR L2 | JSK ELECTRICALS L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in soil (any type) using hydraulic excavator CK 90 with hydraulic excavator of0.90 cum bucket capacity including cutting and loading in trolley, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections including all lifts and combined lead upto 30 m | 4,514.56 | cum | 40 ₹1.8 L | 41 ₹1.9 L | 35 ₹1.6 L | 33 ₹1.5 L |
| 2.00 | Rehandling of earth work | 3,980.39 | cum | 30 ₹1.2 L | 30.75 ₹1.2 L | 28 ₹1.1 L | 30 ₹1.2 L |
| 3.00 | Extra for laying earthwork as per specifications for compaction in 20 cm layer and dressing including cost of rolling and watering as perspecifications | 1,683.39 | cum | 100 ₹1.7 L | 102.5 ₹1.7 L | 99 ₹1.7 L | 85 ₹1.4 L |
| 4.00 | Dressing of Earthwork | 246.28 | sqm | 2 ₹492.56 | 2.05 ₹504.87 | 1 ₹246.28 | 1.3 ₹320.16 |
| 5.00 | Earth work in excavation of foundation of structures asper drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil B) mechanical means c) depth above 6 m | 1,250.27 | cum | 100 ₹1.3 L | 102.5 ₹1.3 L | 104 ₹1.3 L | 9.9 ₹12,377.67 |
| 6.00 | Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth | 22.98 | cum | 160 ₹3,676.80 | 164 ₹3,768.72 | 159 ₹3,653.82 | 155 ₹3,561.90 |
| 7.00 | Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing above1.5 mtr depth but upto 3.0 m | 22.98 | cum | 165 ₹3,791.70 | 169.13 ₹3,886.61 | 166 ₹3,814.68 | 166 ₹3,814.68 |
| 8.00 | Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing above 3.0 mtr depth but upto 4.50 m | 1.73 | cum | 182 ₹314.86 | 186.55 ₹322.73 | 182 ₹314.86 | 175 ₹302.75 |
| 9.00 | Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres. | 15.38 | cum | 190 ₹2,922.20 | 194.75 ₹2,995.26 | 191 ₹2,937.58 | 191.74 ₹2,948.96 |
| 10.00 | Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per pwd specification | 166.94 | sqm | 20 ₹3,338.80 | 20.5 ₹3,422.27 | 18 ₹3,004.92 | 18.49 ₹3,086.72 |
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
16 Feb 2026, 1:00 pmClosed
Executive Engineer Lehal Canal Division Patiala
Executive Engineer Lehal Canal Division WRD Punjab Patiala
Estimate for cross drainage structure at RD 140900 of 2nd Patiala Feeder.
2026_WR_159035_1
82 Dated 31.01.2026
Open Tender
Civil Works - Canal
60 days
Patiala
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Yes
₹3.6 L
Yes
Lehal Canal Division WRD Punjab Patiala
22 May 2026
31 Jan 2026
16 Feb 2026
31 Jan 2026
16 Feb 2026
31 Jan 2026
10 Feb 2026
Excavation in soil (any type) using hydraulic excavator CK 90 with hydraulic excavator of0.90 cum bucket capacity including cutting and loading in trolley, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections including all lifts and combined lead upto 30 m
Rehandling of earth work
Extra for laying earthwork as per specifications for compaction in 20 cm layer and dressing including cost of rolling and watering as perspecifications
Dressing of Earthwork
Earth work in excavation of foundation of structures asper drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil B) mechanical means c) depth above 6 m
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing above1.5 mtr depth but upto 3.0 m
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing above 3.0 mtr depth but upto 4.50 m
Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres.
Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per pwd specification
Dressing of Dowel
Laying cement water slurry 1:3, with cement @ 2.25 kg/sqms as on prepared side slopes before laying concrete on side slopes
Cement concrete lining75mm. thick or less laid manually for irrigation channels, usingcement concrete M15withcement content325kg/cum mixed inanautomatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII)
Providing and laying cement concrete for coping mechanical paver for irrigation channel using cement concrete M-15 mixed in automatic computerised batching and mixing plant and transported to site in transit mixer.
Providing and laying cement concrete for Sleeper for irrigation channel using cement concrete M-15 mixed in automatic computerised batching and mixing plant and transported to site in transit mixer
Providing and laying cement concrete for Toe Wall for irrigation channel using cement concrete M-15 mixed in automatic computerised batching and mixing plant and transported to site in transit mixer
Filling Contraction Joint with sealing compound complete in all respect
Applying Bitumen Primer coat on side of lining and top of sleeper for construction joint, Expansion Joint & Contraction Joint. Complete in all respect.
Providing & laying 250 mm wide LDPE Film 150 micron over sleepers
Making dewatering arrangement by pumping set 4‘‘ *4‘‘ (Tractor driven)
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.A) PCC grade M15
Plain/Reinforced cement concrete Grade M25 in foundation and plinth complete as per drawing and Technical Specifications F) Height 5 to 10m RCC grade M25 ii) with batching plant,TM and concrete pump
Cold twisted detormed (Ribbed/ Tor steel)Bars (Fe500grade as per IS 1786-2008) , for R.C.C works,where not including in the complete rate of RCC including bending and binding placing in position complete
Stone or Kankar block pitching a) horizontal
Stone or Kankar block pitching b) On slopes
Providing, lowering in trenches to correct gradient and alignment, jointing with tyton rubber joint and cutting of reinforced cement concrete spigot and socketed pipes and specials with rubber ring ISI marekd as per IS code IS458-2003 into trenches for all depths and layingout the same to correct alignment, gradients, levels etc. cutting of concrete beds and joints holes, supporting the pipes and specials in correct position in a suitable rigid manner while the same are being jointed and until the surrounding benchings, haunches and envelopes are completed.The pipes shall rest on the beds at all joints through their lengths and fixing of rubber ring, facing, testing the pipes for leakage and making good the same leakage and all defects to the entire satisfaction of the Engineer-in-charge including all cartage etc. D)RCC pipe NP-4 s) 2000mm i/d pipe
Providing, fitting and fixing mild steel railing complete as per drawing and Technical Specification
Dismantling brick work tile, masonry or tile lining b) in cement
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.56 MB
BOQ_322401.xls
BOQ • 0.55 MB
Download all tender documents and submit your bid