| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1 Tendere₹74.9 LAccepted-AOC | L1 Tendere | Accepted-AOC L1 Tenderer | |
| 2 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical EMD Not Furnished | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹81.7 L
EMD Value
₹82,000
Closing Date
12 Jul 2022, 3:00 pmClosed
The Project Director DRDA Chengalpattu
O/o The Project Director DRDA Chengalpattu
Improvements to 6 No.of Tank Ponds in Madurandhakam Block in Chengalpattu District Having Package No.03
2022_RDTN_238062_1
4683.2022.A10 Dt.24.06.2022
Open Tender
Civil Works
Item Rate
90 days
Madurandhakam Block
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹82,000
O/o The Project Director DRDA Chengalpattu
3 Nov 2022
30 Jun 2022
12 Jul 2022
30 Jun 2022
12 Jul 2022
30 Jun 2022
5 Jul 2022
Amount
PART I: Improvements to Ellammal Kuttai in Iyyanar Nagar @ Silavattam Panchayat. Estimate Amount : Rs.14.00 Lakhs
scrub jungle clearance with cost and conveyance including all other labuour charges etc complete
Earth work in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100m by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment developed and not exceeding 23cm thickness, benching of slopes prior to placement of earth fill including extra earth filling, breaking clods, watering to OMC and compaction of each layer to 95% of proctor density through deployment of appropriate compaction equipment 8 - 10 tonne power roller - vibratary power roller short width (+/- 0.90m m widht durm) power roller or vibratory roller ensuring compaction of designed bund section and also ensuring compaction of earth fill and side slopes thorugh the deployment of hydraulic excavaters with steel plate fixtures attached to their booms / heavy power roller capable of climbing 1:5 (Horizontal) :1.00 (vertical ) slope including side slopes as directed by the eninner in charge of works and as per technical specification.
Earth work deploying earth moving machinery for desilting channel and forming bund either sides and deposting the earth on banks including jungle clearance etc complete
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil etc complete.
Sand filling with good river M.sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Rough stone dry packing using rough stone with cost and conveyance including all other labour charges etc complete
Pointing in cm 1:3 mix with cost and conveyance including all other labour charges etc complete
PART II: Improvements to Somasundareswarar Kulam in Eruvakkam Village @ Kinar Panchayat. Estimate Amount : Rs.14.61 Lakhs
scrub jungle clearance with cost and conveyance including all other labuour charges etc complete
Earth work in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100m by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment developed and not exceeding 23cm thickness, benching of slopes prior to placement of earth fill including extra earth filling, breaking clods, watering to OMC and compaction of each layer to 95% of proctor density through deployment of appropriate compaction equipment 8 - 10 tonne power roller - vibratary power roller short width (+/- 0.90m m widht durm) power roller or vibratory roller ensuring compaction of designed bund section and also ensuring compaction of earth fill and side slopes thorugh the deployment of hydraulic excavaters with steel plate fixtures attached to their booms / heavy power roller capable of climbing 1:5 (Horizontal) :1.00 (vertical ) slope including side slopes as directed by the eninner in charge of works and as per technical specification.
Earth work deploying earth moving machinery for desilting channel and forming bund either sides and deposting the earth on banks including jungle clearance etc complete
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil etc complete.
Sand filling with good river M.sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
PART III: Improvements to Kavadur Colony Thangal @ Kavadur Panchayat. Estimate Amount : Rs.12.92 Lakhs
Clearing the Surub Jungle in Water Spread area with Uprooting and Disposing of the Same as Directed by the Engineer in charge of the Works as per technical Specificationomplete
Clearing the Light Jungle with Uprooting and Disposing of the Same as Directed by the Engineer in charge of the Works as per technical Specification
Earth work in all soils Expected hard rock Requring blastering and Conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching,formation ofbunds,breaking clods,sectioning etc.,complete.
Earth work excavation deploying earth moving machinery for desilting channel having a width of more than 10m and forming bund on either sides and depositing the eatrh on banks including jungle clearance.,etc.complete
Extra watering and consolidation by power roller including hire charges (Baased on L.S & C.S Proposed Quantity for tank Bund)
Construction of Sluice
Earth work excavation and depositing on bank with initial lead and lift in Hard gravelly soil.,etc
Earth work excavation and depositing on bank with initial lead and lift in Hard gravelly soil.,etc
Collection and Supply of Sand filling in tio the Basement with cated river sand .,etc
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyace , etc.
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete below GL
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete Above GL
Supply and Fabrication of steel for RCC Items including cost and Conveyance
RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyace
Supplying and Fixing cut stone roughly dressed to all faces and set in cm 1:3 including all chrges.,etc
Refilling with the Excavated earth other than sand only labour charges.,etc
Fabrication and supply of Country wood plug of size 40x40 and 45cm to60cm height the plug rod with 20mm dia mild steel rod of size 3.0m to 4.50m height,the plug topside,middle,centre and bottom side coverd iron strap 3 nos
Providing Granite stone for Hydraulic Particulars of sluice
PART IV: Improvements to Thattan Kulam in Vedavakkam Village @ Andavakkam Panchayat. Estimate Amount : Rs.11.99 Lakhs
scrub jungle clearance with cost and conveyance including all other labuour charges etc complete
Earth work in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100m by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment developed and not exceeding 23cm thickness, benching of slopes prior to placement of earth fill including extra earth filling, breaking clods, watering to OMC and compaction of each layer to 95% of proctor density through deployment of appropriate compaction equipment 8 - 10 tonne power roller - vibratary power roller short width (+/- 0.90m m widht durm) power roller or vibratory roller ensuring compaction of designed bund section and also ensuring compaction of earth fill and side slopes thorugh the deployment of hydraulic excavaters with steel plate fixtures attached to their booms / heavy power roller capable of climbing 1:5 (Horizontal) :1.00 (vertical ) slope including side slopes as directed by the eninner in charge of works and as per technical specification.
Earth work deploying earth moving machinery for desilting channel and forming bund either sides and deposting the earth on banks including jungle clearance etc complete
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil etc complete.
Sand filling with good river M.sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Rough stone dry packing using rough stone with cost and conveyance including all other labour charges etc complete
Pointing in cm 1:3 mix with cost and conveyance including all other labour charges etc complete
PART V: Improvements to Colony Kulam in Natarajapuram @ Bukkathurai Panchayat. Estimate Amount : Rs.17.00 Lakhs
scrub jungle clearance with cost and conveyance including all other labuour charges etc complete
Earth work in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100m by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment developed and not exceeding 23cm thickness, benching of slopes prior to placement of earth fill including extra earth filling, breaking clods, watering to OMC and compaction of each layer to 95% of proctor density through deployment of appropriate compaction equipment 8 - 10 tonne power roller - vibratary power roller short width (+/- 0.90m m widht durm) power roller or vibratory roller ensuring compaction of designed bund section and also ensuring compaction of earth fill and side slopes thorugh the deployment of hydraulic excavaters with steel plate fixtures attached to their booms / heavy power roller capable of climbing 1:5 (Horizontal) :1.00 (vertical ) slope including side slopes as directed by the eninner in charge of works and as per technical specification.
Earth work deploying earth moving machinery for desilting channel and forming bund either sides and deposting the earth on banks including jungle clearance etc complete
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil etc complete.
Sand filling with good river M.sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Rough stone dry packing using rough stone with cost and conveyance including all other labour charges etc complete
Pointing in cm 1:3 mix with cost and conveyance including all other labour charges etc complete
PART VI: Improvements to Mamandur Thenpathy Thangal @ Mamandur Panchayat. Estimate Amount : Rs.11.22 Lakhs
Clearing the Surub Jungle in Water Spread area with Uprooting and Disposing of the Same as Directed by the Engineer in charge of the Works as per technical Specificationomplete
Clearing the Light Jungle with Uprooting and Disposing of the Same as Directed by the Engineer in charge of the Works as per technical Specification
Earth work in all soils Expected hard rock Requring blastering and Conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching,formation ofbunds,breaking clods,sectioning etc.,complete.
Earth work excavation deploying earth moving machinery for desilting channel having a width of more than 10m and forming bund on either sides and depositing the eatrh on banks including jungle clearance.,etc.complete
Extra watering and consolidation by power roller including hire charges (Baased on L.S & C.S Proposed Quantity for tank Bund)
Construction of Sluice
Earth work excavation and depositing on bank with initial lead and lift in Hard gravelly soil.,etc
Earth work excavation and depositing on bank with initial lead and lift in Hard gravelly soil.,etc
Collection and Supply of Sand filling in tio the Basement with cated river sand .,etc
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyace , etc.
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete below GL
Supply and Fabrication of steel for RCC Items including cost and Conveyance
RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyace
Supplying and Fixing cut stone roughly dressed to all faces and set in cm 1:3 including all chrges.,etc
Refilling with the Excavated earth other than sand only labour charges.,etc
Fabrication and supply of Country wood plug of size 40x40 and 45cm to60cm height the plug rod with 20mm dia mild steel rod of size 3.0m to 4.50m height,the plug topside,middle,centre and bottom side coverd iron strap 3 nos
Providing Granite stone for Hydraulic Particulars of sluice
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .