| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.1 LAccepted-AOC | L1 | Accepted-AOC ACCEPT | |
| 2 | L2₹12.4 L+₹24,738 (2.04%)Rejected-AOC | L2 | Rejected-AOC REJECT |
| Sl No | Description | Qty | Unit | GOVINDAN ARUL KUMARAN L1 | M. DHANDAPANI L2 |
|---|---|---|---|---|---|
| 1.00 | 1. Cut open BT road Cuting as per the direction of departmental officers etc. completed. | 14 | m3 | 750 ₹10,500 Lowest | 750 ₹10,500 Lowest |
| 2.00 | 2. Dismantling the old damaged cement concrete in cement mortar as per the direction of departmental officers etc. completed. | 3 | m3 | 534 ₹1,602 Lowest | 534 ₹1,602 Lowest |
| 3.00 | 3. Desilting the Existing Chamber etc. complete as per direction of departmental officers etc. completed. | 31 | m3 | 103 ₹3,193 Lowest | 103 ₹3,193 Lowest |
| 4.00 | 4. Earth work excavation in all soils with initial lead & lift etc. complete as per direction of departmental officers etc. completed. | 110 | m3 | 135 ₹14,850 Lowest | 135 ₹14,850 Lowest |
| 5.00 | 5.Supply and laying of 250mm dia stoneware pipe of ISI make etc | 10 | Rm | 1,122 ₹11,220 Lowest | 1,122 ₹11,220 Lowest |
| 6.00 | 6.Replacement of Underground Utilities (PVC Pipe) damaged during earthwork excavation for pipe laying works including cost of additional earthwork excavation in all soil strata, including BT/CC road cutting, removal of slushy soil and replacing the pipeline with sound pipe, including supply and delivery of PVC pipes, couplers, jointing materials and required specials, cutting, conveying , laying, jointing and cost of refilling for the additional earthwork etc complete and as directed by the TWAD board officers. | 50 | Rm | 1,638 ₹81,900 Lowest | 1,638 ₹81,900 Lowest |
| 7.00 | 7. Plain cement Concrete in1:4:8 mix (one cement, four sand,eight metal) using 40mm size Hard Broken stone as per the direction of departmental officers etc., complete Pg no 22 of Si no 3 | 6 | m3 | 5,590 ₹33,540 Lowest | 5,590 ₹33,540 Lowest |
| 8.00 | 8. Centering with steel shutters including studding with sides and support etc., for drain as per the direction of departmental officers etc., complete | 70 | m2 | 489 ₹34,230 Lowest | 489 ₹34,230 Lowest |
| 9.00 | 9.Plain cement Concrete in1:2:4 mix (one cement, two sand, four metal) using 20mm size Hard Broken stone as per the direction of departmental officers etc. completed. | 63 | m3 | 6,963 ₹4,38,669 Lowest | 6,963 ₹4,38,669 Lowest |
| 10.00 | 10. Plain cement Concrete in1:3:6 mix (one cement, three sand, six metal) using 20mm size Hard Broken stone as per the direction of departmental officers etc. completed. | 2 | m3 | 6,319 ₹12,625.36 Lowest | 6,319 ₹12,625.36 Lowest |
Tender Value
₹14.5 L
EMD Value
₹14,500
Closing Date
18 Sept 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Raising the Existing UGD Chamber at PM Samy Colony Street 1 to 7, Indhira Nagar, Nalvar Layout, Vinayagar Kovil Street , GPM Nagar Main Road, Street 1,2,3,4 and Ward Areas in ward no . 47, Central zone
2025_MAWS_602889_33
e44/2025
Open Tender
Civil Works
Works
150 days
Coimbatore corporation
As per tender Document
5 documents required · 5 mandatory
₹0
₹14,500
7 Nov 2025
12 Sept 2025
19 Sept 2025
12 Sept 2025
18 Sept 2025
12 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .