Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹23 LAccepted-AOC | 1 | Accepted-AOC ok | |
| 2 | 2₹30.1 L+₹5.6 L (22.8%)Rejected-Finance V P O BALANA TEHSIL AND DISTT AMBALA 134003 | AMBALA | AMBALA | HARYANA | 134003 | 2 | Rejected-Finance not | |
| 3 | 3₹35.4 L+₹10.9 L (44.4%)Rejected-Finance | 3 | Rejected-Finance not |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
26 Oct 2022, 6:00 pmClosed
CEO, KDB
Kurukshetra Development Board, Kurukshetra
Providing temporary Electrification during International Gita Mahotsav 2022
2022_HBC_243967_1
KDB/IGM-Temporary Electrification
Open Tender
Civil Works
Works
15 days
Kurukshetra
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
₹2 L
Yes
11 Nov 2022
19 Oct 2022
27 Oct 2022
19 Oct 2022
26 Oct 2022
19 Oct 2022
Amount
Providing & temporary installation of electric items for Craft Mela, State Exhibition, Religious Institutions & Purushotampura Bagh (19.11.2022 to 06.12.2022 )
Providing of Indian LED 9W Bulb
Providing of Indian LED 18W Bulb
Indian LED Flood Light 90W
Electric connection for food Courts/Shops, State Exhibition and Religious Institutions etc.
Arrangement of switch Board with series test lamp board Change over switch and wiring for generator for connection of 50 kw each
LED Flood Light 300W (Green Colour) for lighting under the trees in Purushotampura Bagh.
LED Light 300W (white Colour) Lighting for Sangmeshwar Mahadev temple at Brahamsarovar.
LED Colourful & Woam Light 54x3W (Sangmeshwar Mandir, Ladies Ghat & Aarti Sthal) Ladies Ghat-other sides of centre road Brahamsarovar
Reflector lights 9 watt led for frame work
Reflector LED footlights 45 watt for frame work
Genset supply alongwith operator without fuel with Proper earthing of each Genset will be done by the contractor as per norms and specification of the Chief Electrical Inspector and ensure the continuous supply during the entire Mahotsav. ( 19.11.2022 to 06.12.2022 ) :
Gen set (silent) 63 KVA at Aarti Sthal
Gen Set (silent) 125 KVA at stage Purushotampura Bagh
Gen Set Silent 63 KV at Theme Park
Gen Set Silent 125 KV at Theme Park
Gent Set 63 KVA nearby electric connection of UHBVN
Colorful Indian Lari for Lighting at various sites (19.11.2022 to 06.12.2022 ) : Colorful Lari (10 mtr. each) on various sites such as inside & outside of Brahamsarovar, Sannehit Sarovar, Jyotisar tirath, Srikirishna Museum, Gita Dwar, Surya Dwar, Dyalpur tirath, Amin tirath, Narkatari tirath, 10 nos. city chowk
Providing & temporary installation electric items at Jyotisar tirath from 19.11.2022 to 06.12.2022 :
LED Colourful & Woam Light 54x3W
LED Bulb 9W lari
LED Flood Light 300W (Green Colour) for lighting under the trees
LED Light 300W (white Colour) Lighting for façade
Providing & temporary installation electric items for State Pavilions/Exhibitions & International Craft Pavilion from 19.11.2022 to 06.12.2022 :
LED Light 300W (white Colour)
LED Light 90W (white Colour)
LED Colourful & Woam Light 54x3W
Electric connection
Providing & temporary installation electric items for SKM & Sannehit Sarovar from 19.11.2022 to 06.12.2022:
LED Colourful & Woam Light 54x3W
LED Light 90W (white Colour) main building facade of SKM
Lighting for Parking area of south side of Brahamsarovar, Mela ground & Theme park. LED Bulb Lari from Bazigar Dharamshala to University side to Arjun Chowk to Multi Art Culture Centre Chowk to Bazigar Dharamshala & Multi Art Culture Centre to B.R. International Chowk( As per actual road dimension/length) from 19.11.2022 to 06.12.2022: with all arrangements
LED 90W (Street Light)
LED Bulb 9W Lari with Holder and wire
Temporary arrangement of fire extinguisher from 19.11.2022 to 06.12.2022
ABC/Co2 type of 9 kg weight with fitting equipments
ABC/Co2 type of 4.5 kg weight with fitting equipments
Proper Electrification and illumination inside and outside of the main entry of Brahamsarovar (LED colourfull and woam light 54x3W) from 19.11.2022 to 06.12.2022
Proper Electrification and illumination of “Shikhars“ at Brahamsarovar (LED colourfull and woam light 54x3W) from 19.11.2022 to 06.12.2022
Gulshan Kumar
YADAV ELECTRICS WORKS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .