Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAccepted-AOC | ₹2.9 Cr | L1 | Accepted-AOC Accepted for being L1 amonst the bidder |
| 2 | L2₹2.9 Cr+₹69,698.78 (0.24%)Rejected-AOC | ₹2.9 Cr+₹69,698.78 (0.24%) | L2 | Rejected-AOC Rejected for being L2 |
Tender Value
₹2.9 Cr
EMD Value
₹2.9 L
Closing Date
7 Mar 2024, 3:30 pmClosed
Executive Engineer, Bomdila Division, PWD, AP
Executive Engineer, Bomdila Division, PWD, AP, Bomdila
Extension of Road from Sanchipam Village to Sanchipam Top
2024_PWDAP_1763_1
BDL/TandA-39/2023-24/200,dtd 01/03/2024
Open Tender
Civil Works – Roads
Item Rate
730 days
Sanchipam
Please refer Tender Document
7 documents required · 7 mandatory
₹2,000
EE, Bomdila Division, PWD, AP, Bomdila
₹2.9 L
O/o EE, Bomdila Division, PWD, AP, Bomdila
3 Apr 2025
2 Mar 2024
8 Mar 2024
2 Mar 2024
7 Mar 2024
2 Mar 2024
5 Mar 2024
Amount
(SH :- Jungle Clearance-4.116 Hect.)
Clearing and Grubbing Road Land . (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stackin of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.(i) By Manual Means: A) In area of thorny jungle
(SH:- Earth Work -2.940 KM)
Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres)
Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres )
Haulage of materials by tipper including the cost of loading and unloading [ lead = 9.90 Km]
(SH:- Unlined Surface Drain -2.940 KM)
Surface Drains in Soil (Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions to the requirement within a lead of 50 metres (average lead 25 meters) A) Mechanical means
M/s Eastern Construction
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1898.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .