Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | SINGLE₹7.7 LAccepted-AOC 11TH FLOOR BIRLA BUILDING 9 1 R N MUKHERJEE ROAD B B D BAG KOLKATA WEST BENGAL 700001 | KOLKATA | WEST BENGAL | 700001 | SINGLE | Accepted-AOC AWARD OF WORK TO SINGLE BIDDER |
Tender Value
₹7.7 L
EMD Value
₹9,700
Closing Date
21 Apr 2023, 11:00 amClosed
GENERAL MANAGER EXCAVATION
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U.P.
Annual Maintenance Contract for OEM fitted Air conditioning system in 33/72 Model Somnath Dragline of NCL Khadia project for a period of 365 Days
2023_NCL_277036_1
KHD/G.M. (Excv)/E-Tender/23-24/10
Open Tender
Excavation Department Work
Item Rate
365 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
4 documents required · 4 mandatory
₹9,700
5 Jul 2023
6 Apr 2023
22 Apr 2023
6 Apr 2023
21 Apr 2023
7 Apr 2023
6 Apr 2023 - 10 Apr 2023
Amount
Scope of Work:- 1. Periodical/Scheduled Inspection and Maintenance : (i). To carry out periodic / scheduled inspection and maintenance of entire system as per the check sheet and OEM recommendation. (ii). Attend and rectify major breakdown / repair if any within 24 hours of complaint. 2. Details of Work :- (i). Periodic/Scheduled Inspection and Maintenance. Thorough inspection of AC system performance by team consisting of one system specialist with one helper in line with the check sheet and OEM recommendations. (ii). Refrigerant filling : This includes: (a) Leakage test with nitrogen at every joint by means of applying soap solution. (b) Vacuum formation in the system by means of vacuum pump. (c ) Refrigerant charging (R-134a) with the adjustment of high and low pressure cut-offs. (d) Ensuring proper cooling within operator cabin. (e) Technical Description of Air Conditioner System. (f ) In addition to this, refrigerant top up will be taken care for proper cooling of the operator cabin.
Charges for Annual Maintenance Contract for OEM fitted Air conditioning system in operator cabin, PCR & rest room of 33/72 model Somnath Dragline of Khadia Project including Periodical / Scheduled Inspection and Maintenance for the period of 365 days.
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_286800.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .