Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.2 LAccepted-Finance | L1 | Accepted-Finance Qualified | |
| 2 | L2₹38.2 L+₹1,386.10 (0.04%)Accepted-Finance | L2 | Accepted-Finance Qualified |
Tender Value
₹40 L
EMD Value
₹40,000
Closing Date
16 May 2022, 3:00 pmClosed
Block development officer kollidam
Block development office kollidam
Construction of Minor bridge Across buckingam canal in Thirumullaivasal Panchayat Kollidam Block in Mayiladuthurai District
2022_RDTN_231711_1
3517/A2/2021
Open Tender
Civil Works - Bridges
Item Rate
120 days
Block development office kollidam
refer tender documents
7 documents required · 7 mandatory
₹0
₹40,000
Yes
Block development office kollidam
20 May 2022
10 May 2022
16 May 2022
10 May 2022
16 May 2022
11 May 2022
10 May 2022 - 10 May 2022
11 May 2022
Amount
Nature of Work : Construction of Minor bridge Across buckingam canal in Thirumullaivasal Panchayat Kollidam Block in Mayiladuthurai District
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank as per SS20B with allleads and lifts and all other incidental charges such as bailingout water shoring strutting, walling & forming protective bundswherever necessary etc complete as per relevent standardspecification for DRESSING THE BED UPTO SILL LEVEL AND FLEXIBLE APRON.
Earth work excavation in all classes of soils except hard rockrequiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as providing and maintaining necessarycofferdams, sheeting, shoring, bracing and their subsequentremoval, removal of all logs, stumps and other deleterious matterand obstructions, trimming bottom of excavation backfilling, andclearing the site and disposal of all surplus materials etc., complete as per relevent standard specification for FOUNDATION OF RAFT AND CUT OFF WALLS
Vibrated Cement Concrete of grade M25 (Design mix ) using graded HBG metal including cost and conveyance of all materialsto site and cement at site including cost of formwork, soft water,labour charges for mixing, transporting, laying and curing concreteworking at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, struttingetc., complete as per relevent standard specification for FOUNDATION OF RAFT AND CUT OFF WALL(below sill level)
Filling inside the raft with clean good coarse sand including cost and conveyance of sand to work site, laying, handling charges andfilling in layers , tamping under optimum moisture content to get the maximum density including watering,with all leads of water andall other incidental charges etc. complete
Vibrated Cement Concrete of grade M25 (Design mix ) using graded HBG metal including cost and conveyance of all materialsto site and cement at site including cost of formwork, soft water,labour charges for mixing, transporting, laying and curing concreteworking at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, struttingetc., complete as per relevent standard specification for SUBSTRUCTRE OF ABUTMENT , WING AND PIER(Above sill level)
Providing and fixing seepage pipes of 110mm PVC pipes ofrequired lengths for abutments and wings including cost andconveyance of all materials to worksite, cost and labour for900mm dia semi-spherical backfill arrangements with 100mm sizebroken granite chips at the periphery and labour charges for fixing, etc., complete as per drain the backfill .
Reinforced cement concrete M30 design mix using ISS gradedhard granite crushed stone including cost and conveyance of allmaterials to site and cement at site excluding cost and fabrication of steel but including formwork and centering, softwater, labour charges for mixing, transporting and placing in position, vibrating and compacting, finishing and curing,working at heights, hire charges for tools and plants including all other incidental charges etc., complete as per specification for BEDBLOCK Cum DIRT WALL OVER ABUTMENTS .
Providing and fixing KRAFT paper for full width of seating of deck slab and including cost and conveyance to worksite, labour forfixing the same in correct position and all other incidentalcharges etc., complete
Vibrated reinforced cement concrete M30 (Design mix) using ISS graded hard granite broken metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including formwork and centering soft water labour charges for mixing, transporting, placing in, position vibrating and compacting finishing and curing concrete,working at heights, hire charges for tools and plants, including all other incidental charges etc complete as per Specification for RCC DECK SLAB
Providing and fixing 20mm thick PVC EXPANSION JOINT inbetween deck slabs over abutment and pier as shown in the drawingincluding cost and conveyance of expansion joints including shalimar pad and joint sealent etc., complete.
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST's ( Roads Wing) specifications for Roads and Bridges " Fourth Revision Cl. 309-3-2-13 and 305-4-4 etc., complete
Filling behind Abutments and wings with clean gritty gravel to including cost and conveyance of gravel to worksite, laying,handling,charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other charges etc complete FOR FILLING BEHIND ABUTMENT AND WINGS
Supply and fabrication of Fe-500 and Fe-240 steel required for all RCC items of works involved in the schedule including cost of steel at site including cost of fabrication, labour charges for cleaning the rods strengthening, cutting bending,tying grills, including overlaping to the required length wherever necessary and placing the the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars cover blocks and all other incidental charges etc complete, including suitable HCRSteel bars.
Supply and fabrication of Fe-500 and Fe-240 steel required for all RCC items of works involved in the schedule including cost of steel at site including cost of fabrication, labour charges for cleaning the rods strengthening, cutting bending,tying grills, including overlaping to the required length wherever necessary and placing the the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars cover blocks and all other incidental charges etc complete, including suitable HCRSteel bars.
Vibrated Cement Concrete of grade M25 (Design mix )using graded ISS hard granite broken metal including cost and conveyance of all materials to site and cement at site including cost of formwork, lead for soft water, labour charges for mixing, transporting, laying and curing concrete working in heights and Hire charges for Tools and Plants and all other incidental chargesetc., complete as per relevent standard specification for BASE COURSE BELOW APPROACH SLAB
Vibrated reinforced cement concrete M30 (Design mix) using ISS graded hard granite crushed stone including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including formwork and centering soft water labour charges for mixing transporting, placing in,positionvibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all otherincidental charges etc complete as per standard specification for APPROACH SLAB
Vibrated Cement Concrete of grade M30design mix using ISSsize graded HBG metal including cost and conveyance of all materials to site and cement at site including all labour charges for mixing concrete laying,vibrating Hire charges forTools and Plants, compacting, curing with all leads of soft water,including and all other incidental charges form work cost of premoulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over deck slab and approach slab
Vibrated reinforced cement concrete M40 (Design mix) using ISS graded hard granite crushed stone including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including formwork and centering,soft water labour charges for mixing transporting, placing in position vibrating and compacting finishing and curing, working at heights, hire charges for tools and plants, including all other incidental charges etc complete as per standard specification for Crash Barrier over Deck Slab
Vibrated Cement Concrete of grade M20 (nominal mix 1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of allmaterials to site and cement at site including cost of formwork, lead for soft water, labour charges for mixing, transporting laying and curing concrete working at depths Tools and plants Tools and Plants and all other incidental charges etc. completeas per standard specification for Crash Barrier type Parapet
Providing and fixing of cast iron drainage spouts 100mm dia as per MOST drawings SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them inposition etc., complete
Granite rough stone dry packing for flexible apron
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
V.Jothiprakash
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .