| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC LAXMI MARKET P O JAYANT SINGRAULI MP | L1 | Accepted-AOC As per TCR | |
| 2 | L2₹2.5 L+₹49,205.60 (24.1%)Rejected-Finance CINAMA ROAD ANPARA P O ANPARA SONEBHADRA 231220 UTTAR PRADESH INDIA | SONBHADRA | UTTAR PRADESH | 231220 | L2 | Rejected-Finance As per NIT |
Tender Value
₹3.2 L
EMD Value
₹4,000
Closing Date
15 Mar 2025, 10:00 amClosed
M K Pandey
O/o AGM, Bina Area, NCL, District Sonebhadra (UP), Pincode 231220
Dismantling of crowd cushion, shipper shaft, both side swing gear box assembly, dipper handle and hoist boom pulley with shaft and suspension rope and Other Mis-cellaneous spares from Surveyed-off / grounded BE-4 Shovel (BE-195) Shovel at Jayant Proj
2025_NCL_330474_1
Bina/SO(Excv)/Tender/24-25/79 dt 27.02.2025
Open Tender
Excavation Department Work
Item Rate
22 days
Bina Project, NCL
As per NIT
5 documents required · 5 mandatory
₹4,000
29 Jul 2025
27 Feb 2025
17 Mar 2025
28 Feb 2025
15 Mar 2025
28 Feb 2025
28 Feb 2025 - 7 Mar 2025
Amount
Dismantling of crowd cushion, shipper shaft, both side swing gear box assembly, dipper handle and hoist boom pulley with shaft and suspension rope and Other Miscellaneous spares from Surveyed-off / grounded BE-4 Shovel (BE-195) Shovel at Jayant Project and loading & transport of same to Shovel shed, Bina project
Labour charges including contractors profit for cleaning of working area (Labour consists of 01 no. supervisor for a period of 4 shiftdays i.e. 2 shift X 2 days and 03 no. semi-skilled for a period of 4 shiftdays i.e. 2 shift X 2 days).
Labour charges including contractors profit for Dismantling of crowd cushion, shipper shaft, dipper handle and hoist boom pulley with shaft and suspension rope, both side swing gearbox assembly (Labour consists of 01 no. supervisor for a period of 36 shiftdays i.e. 2 shift X 18 days, 02 nos. skilled fitter for a period of 36 shiftdays i.e. 2 shift X 18 days, 01 no. skilled welder for a period of 36 shiftdays i.e. 2 shift X 18 days and 03 no. semi-skilled for a period of 36 shiftdays i.e. 2 shift X 18 days).
Labour charges including contractors profit for jacking fixure and stand, supporting counter weight, locking swing system by round billets, rods etc. (Labour consists of 01 no. supervisor for a period of 8 shiftdays i.e. 2 shift X 4 days, 02 nos. skilled fitter for a period of 8 shiftdays i.e. 2 shift X 4 days, 01 no. skilled welder for a period of 8 shiftdays i.e. 2 shift X 4 days and 03 no. semi-skilled for a period of 8 shiftdays i.e. 2 shift X 4 days).
Hiring charges of 1 no. welding machine and 1 set of welding accessories and cutting set for a period of 22 days
Total impact of GST for the purpose of CTC
MANISH ENTERPRISES (BID ID -1134905)
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_342556.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .