| Sl No | Description | Qty | Unit | M/S YASHVARDHAN ENGINEERING WORKS L2 | MANAS ELECTRICALS L1 |
|---|---|---|---|---|---|
| 1.00Following works are to be carried out at 220 KV S/S Barabanki for the construction of new 33 KV New Palhari AIS Bay along with associated works including all cost of men, misc, consumables, T&P, Crane etc. to complete the Job satisfactorily | |||||
| 2.00PART- A : - WORK | |||||
| 3.00Carriage Work | |||||
| 4.00 | Carriage of Sub-Station Structure, if required, from EFU, Naini, or from equivalent distance; including sorting, Loading, Unloading and Transportation with applicable preventive safety precautions for the equipment to complete the Bay work in the given time frame, if applicable | 1 | Job | 18,000 ₹18,000 Lowest | 20,000 ₹20,000 |
| 5.00Safe carriage of the following equipments/materials including loading and unloading on trucks duely arranged by the Contractor from Stores of any different sub-stations under ETC -I Lucknow or equivalent distance any other substations as per requirement to 220 KV S/S Barabanki | |||||
| 6.00 | Carriage of 33KV CT (3) / PT (3) / Isolator (3) | 9 | Job | 1,900 ₹17,100 | 500 ₹4,500 Lowest |
| 7.00 | Carriage of 33KV VCB | 1 | Job | 6,000 ₹6,000 | 5,000 ₹5,000 Lowest |
| 8.00 | Carriage of various size Control Cable 3 drums | 3 | Job | 1,500 ₹4,500 | 1,000 ₹3,000 Lowest |
| 9.00 | Erection of following equipments on their structures; including shifting of material from store to site; including proper fixing and tightening with the structure / Anchor Bolt; Earthing of the Structures and Equipments along with other relevent jobs to complete the work in proper way up to satisfaction level and as per instruction of JE /SDO as per UPPTCL Norms: -YMM-2 No.,YPM-2 No, ALP-9 No., ABL-3 No. etc | 2.46 | MT | 1,800 ₹4,426.2 Lowest | 3,500 ₹8,606.5 |
| 10.00Erection of following Equipments as per instruction manual and technical specifications including shifting of materials from Central Stores/ Site Store to Erection Site including all associated works. | |||||
Tender Value
₹9.8 L
EMD Value
₹10,000
Closing Date
29 Jun 2026, 4:00 pmClosed
S.E, ETC-I, Lucknow
Pareshan Bhawan, Gomti Nagar, Lucknow
work
2026_UPTCL_1155620_1
E-Tender No.-14/ETC-I(L)/2026-27
Open Tender
Electrical Works
Piece-work
30 days
Pareshan Bhawan, Gomti Nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
A/c No 2408002190005438, IFS PUNB0691100, PNB, Lko
₹10,000
13 Jul 2026
30 May 2026
30 Jun 2026
30 May 2026
29 Jun 2026
30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Following works are to be carried out at 220 KV S/S Barabanki for the construction of new 33 KV New Palhari AIS Bay along with associated works including all cost of men, misc, consumables, T&P, Crane etc. to complete the Job satisfactorily | - | - | - | - |
| 2 | PART- A : - WORK | - | - | - | - |
| 3 | Carriage Work | - | - | - | - |
| 4 | Carriage of Sub-Station Structure, if required, from EFU, Naini, or from equivalent distance; including sorting, Loading, Unloading and Transportation with applicable preventive safety precautions for the equipment to complete the Bay work in the given time frame, if applicable | 1 | Job | - | - |
| 5 | Safe carriage of the following equipments/materials including loading and unloading on trucks duely arranged by the Contractor from Stores of any different sub-stations under ETC -I Lucknow or equivalent distance any other substations as per requirement to 220 KV S/S Barabanki | - | - | - | - |
| 6 | Carriage of 33KV CT (3) / PT (3) / Isolator (3) | 9 | Job | - | - |
| 7 | Carriage of 33KV VCB | 1 | Job | - | - |
| 8 | Carriage of various size Control Cable 3 drums | 3 | Job | - | - |
| 9 | Erection of following equipments on their structures; including shifting of material from store to site; including proper fixing and tightening with the structure / Anchor Bolt; Earthing of the Structures and Equipments along with other relevent jobs to complete the work in proper way up to satisfaction level and as per instruction of JE /SDO as per UPPTCL Norms: -YMM-2 No.,YPM-2 No, ALP-9 No., ABL-3 No. etc | 2.46 | MT | - | - |
| 10 | Erection of following Equipments as per instruction manual and technical specifications including shifting of materials from Central Stores/ Site Store to Erection Site including all associated works. | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
td.pdf
Tender Documents • 1.44 MB
BOQ_2164909.xls
BOQ • 0.31 MB
ext.pdf
PDF • 0.36 MB
ext.pdf
PDF • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].