Tender Value
₹31 L
EMD Value
₹3.1 L
Closing Date
10 Sept 2026, 12:00 pm
EE CD2 MIRZAPUR
EE CD2 MIRZAPUR
PANTOON WORK
2026_CEMRZ_1174365_1
2051/2A dt 17-06-2026
Open Tender
Civil Works
Fixed-rate
365 days
MIRZAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹950
Yes
₹3.1 L
Yes
EE CD2 MIRZAPUR
10 Sept 2026
3 Aug 2026
10 Sept 2026
3 Aug 2026
10 Sept 2026
3 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Carrying of pontoon pair from the place of anchoring (down stream side of bridge) to the alignment of bridge in water and fixing the same with other pontoon pair and prefixing the same in bridge alignment. | 52 | Pair | 1,035 | ₹53,820 |
| 2 | Additional Haulage of Pantoon in River (Per Km.) | 52 | Pair | 948.5 | ₹49,322 |
| 3 | During carrying the pontoon pair from place of anchoring (D/S side of bridge) in Per pair water and then to cross the dry bed / shallow water on the way up to the the alignment | 25 | Pair | 3,990 | ₹99,750 |
| 4 | Sinking of pontoons to obtain the proper gradient as lald in dry bed shallow water in the alignment of pontoon bridge as per direction of Engineer In charge | 20 | Nos | 1,167 | ₹23,340 |
| 5 | Supply of Wooden ancher (2.4x1.80x3.1) with 10 & 15 Cm Equaliptus Balli | 150 | Nos | 1,897.5 | ₹2,84,625 |
| 6 | Laying of wooden anchors in the river on the up stream/ Down stream side of the pontoon bridge site including their weaving packing the sand filled bags (av 90 bags) properly before laying and fixing to pontoon with coir ropel sisall rope excluding cost of all | 150 | Nos | 787.5 | ₹1,18,125 |
| 7 | Cartage and Laying Chequered plate including cost of cartage, loading, unloading. T&P etc. Complete | 950 | Nos | 63.5 | ₹60,325 |
| 8 | Fixing of railing post in position including making 16 mm dia 25 cm deep hole with the help of generator and drill machine over sleeper and all sal edging before fixing the railing post with help of 300x16 mm size nut and bolts | 430 | Nos | 37.5 | ₹16,125 |
| 9 | (I) Carriage and laying of sal sleeper including loading unloding] cost of carriage from central store and decking on the bridge as per direction of Engineer
incharge | 2,200 | Nos | 33 | ₹72,600 |
| 10 | (II) Same as item above but sal edging | 300 | Nos | 16 | ₹4,800 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.78 MB
BOQ_2206437.xls
BOQ • 0.38 MB
004.pdf
PDF • 0.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].