Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹6.9 LAccepted-AOC | ₹6.9 L | L-1 | Accepted-AOC L-1 Bidder |
| 2 | Rejected-Technical | - | - | Rejected-Technical Concluded from BOQ as L-3 Bidder |
| 3 | Rejected-Technical WARD NO 02 NEAR CARMEL ACADEMY SUGAT NAGAR TUKUM CHANDRAPUR 442401 | CHANDRAPUR | MAHARASHTRA | 442401 | - | - | Rejected-Technical Concluded from BOQ as L-5 Bidder |
| 4 | Rejected-Technical NEAR SAI MANDIR OM NAGAR BHIWAPUR WARD CHANDRAPUR CHANDRAPUR 442401 | CHANDRAPUR | CHANDRAPUR | MAHARASHTRA | 442401 | - | - | Rejected-Technical Concluded from BOQ as L-4 Bidder |
| 5 | Rejected-Technical EKTA CHOWK WARD NO 2 DURGAPUR NEAR QURESHI MASJID CHANDRAPUR MAHARASHTRA 442404 | CHANDRAPUR | CHANDRAPUR | MAHARASHTRA | 442404 | - | - | Rejected-Technical Concluded from BOQ as L-2 Bidder |
Tender Value
₹11.3 L
EMD Value
₹14,200
Closing Date
24 Apr 2026, 5:00 pmClosed
Staff Officer (Civil), Chandrapur Area
Office of AGM, CHA
Provision of shed at DOC Manager Office and other misc. works under DSA of Chandrapur Area.
2026_WCL_358230_1
WCL_CHA_civil_2026-27_eT-007
Open Tender
Civil Works - Others
Percentage
90 days
DSA, Chandrapur Area
As per NIT
3 documents required · 3 mandatory
₹14,200
19 Jun 2026
13 Apr 2026
25 Apr 2026
13 Apr 2026
24 Apr 2026
14 Apr 2026
13 Apr 2026 - 17 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.999 | Surface dressing of the ground including removing vegetation and in- equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil | - | sqm | - | - |
| 0.999 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | Cum | - | - |
| 0.999 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | - | - |
| 0.000 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete | - | Cum | - | - |
| 0.999 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources). | - | cum | - | - |
| 0.000 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal
size derived from natural sources). | - | Cum | - | - |
| 0.999 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | kg | - | - |
| 0.000 | Constructing soak pit 1.20x1.20x1.70 m filled with brickbats including S.W. drain pipe 100 mm diameter and 1.20 m long complete as per standard design. | - | each | - | - |
| 0.999 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. | - | kg | - | - |
| 0.000 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work | - | sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_371107.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.94 MB
BOQ_371107.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .