Tender Value
Refer Docs
EMD Value
₹10.2 L
Closing Date
12 Aug 2026, 11:00 am3d left
DGM
North East Gas Distribution Company Limited 5th Floor, Central Mall, GS Road, Christian Basti, Kamrup, Assam 781005, India
COMPOSITE WORK FOR CONSTRUCTION OF MOTHER STATION AT ASTC MANGALDOI
2026_ICD_53105_1
NEGDCL/MS-MANGALDOI/2026-27/09
Open Tender
Composite Works
Works
North Bank Assam
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹10.2 L
Yes
Online
12 Aug 2026
16 Jul 2026
12 Aug 2026
16 Jul 2026
12 Aug 2026
27 Jul 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | HSN/SAC |
|---|---|---|---|---|---|---|
| 2 | GA 11.03 ASSAM (MANGALDOI) | - | - | - | - | - |
| 3 | SECTION-A : WORKS FOR Mother Station | - | - | - | - | - |
| 4 | FABRICATION, ERECTION, INSTALLATION AND TESTING OF PIPING | - | - | - | - | - |
| 5 | Receiving and taking over of all Owner supplied materials 2" and above valves from Owner's designated place(s) of issue, transportation including loading, unloading, handling from Owner's designated place(s) of issue to Contractor's own stock yard(s) / work site(s) / work shop(s) including arranging all necessary intermediate storage area(s) thereof, as required; supply of all materials (except those specified subsequently in SOR), equipment, consumables as defined in Contractor's scope of supply and their transportation to the work site(s); performing all above ground/buried piping fabrication works including cutting, edge preparation (inclusive of grinding the edges of pipes, fittings, flanges etc. to match with the matching edges of uneven / different thickness wherever required), fit up, bending, pre-heating wherever required, welding, threading etc.; erection of pipes of all types and thickness over sleepers, overhead on racks and at all elevations; hook-up with equipment nozzles; all types of inline and online instruments such as pressure / thermal safety valves (other than those covered separately), fittings of all sizes i.e., elbows, reducers, tees, 'o' lets, flanges, blind flanges, spectacle blinds, tapping's for pressure gauges, thermowells, hoses and hose couplings of all sizes, if applicable, vents and drains required for process and hydrotesting purposes etc. including fixing of all types of gaskets (including gaskets for RTJ flanges), bolts, studs and nuts of all sizes; carrying out non-destructive testing (excluding radiography covered subsequently in SOR) such as magnetic particle/ liquid penetration etc. as required; hook-up with existing piping / pipeline installed by others as per drawings wherever required; cleaning and flushing by water / compressed air, carrying out hydrostatic test, pneumatic test, valve functional test and any other type of testing as specified, de-pressurising, dewatering, drying by compressed air if applicable; cutting / rebeveling (as required), pre-commissioning and providing commissioning assistance to Commissioning Contractor / Agency for process piping and commissioning of non-process piping if applicable; clean-up and restoration of site, preparation of as built drawings, documents and project records; transportation of surplus free issue materials to Owner's designated place(s); completing all works in all respects as per the AFC drawings, specifications, standards and other provisions of Contract and instruction of Engineer-in-Charge.
Note :-
a) Installation of equipment shall be done by bidder as per directions, supervision and guidance of equipment manufacturer Engineer. Bidder shall inform at least 15 days before to owner for mobilizing of Vendor Engineer to site. Commissioning shall be done in presence & guidance of equipment manufacturer Engineer.
b) All butt welded fittings end shall generally match with connecting pipe wall thickness. However, in case of misalignment, contractor shall have to do end preparation accordingly without any extra cost.
c) All couplings, nipples, plugs for nipple etc. as required shall be supplied by contractor without any extra cost.
d) All Gaskets & Nut-Bolts of adequate quantity shall be supplied and installed without any extra cost.
e) All items fittings, flanges, valves, pipes below 2" shall be supplied & installed by the contractor under this item, Contractor to quote accordingly.
f). 2" and above (fittings & flanges etc ), material supply is also in the contractor scope. It shall be be paid separately under relevant SOR item on actual basis.
g) Any branch connection taken from mainline shall be considered under this SOR item only.
No extra cost shall be paid for the above items. | - | - | - | - | - |
| 6 | Installation of above ground Carbon Steel Process Piping as per details given below: | - | - | - | - | - |
| 7 | Size-4 Inch, 300# Thk/Sch-XS, Material-ASTM A106 Gr B (CHARPY), BE, Seamless,Dimension Std.-B 36.10 | 75 | M | 4,000 | ₹3,00,000 | 0 |
| 8 | Size-2 Inch, 300# Thk/Sch-XS, Material-ASTM A106 Gr B (CHARPY), BE, Seamless,Dimension Std.-B 36.10 | 50 | M | 2,600 | ₹1,30,000 | 0 |
| 9 | Size-2 Inch, 150# Thk/Sch-XS, Material-ASTM A333 Gr 6, BE, Seamless,Dimension Std.-B 36.10 | 10 | M | 2,600 | ₹26,000 | 0 |
| 10 | INSTALLATION OF VALVES | - | - | - | - | - |
| 11 | Receiving and taking over of all Owner supplied materials, equipment's 2" and above valves from Owner's designated place(s) of issue, loading , unloading, handling from Owner's designated place(s) of issue to Contractor's own stock yard(s)/ work site(s)/ work shop(s) including arranging all necessary intermediate storage area(s) thereof, as required; supply of all materials, equipment, consumables as defined in Contractor's scope of supply and its transportation to the work site(s);installation of valves, flow meters, strainers, equipment's including fixing of gaskets, bolts, studs, nuts wherever required, levelling, aligning, installation and assembly of accessories including accessories for actuators including making electrical connections for such actuators, if any, by bolting/ threading or welding of pipes at all elevations, testing, completing all works in all respects as per drawings, specification, other provisions of Contract and directions of the Engineer-in-Charge.
Note:
a.) All items fittings, flanges, valves, pipes below 2" shall be supplied & installed by the contractor under this item, Contractor to quote accordingly.
b.) All bolts, nuts, gaskets of all size shall be supplied & installed by the contractor under this item, Contractor to quote accordingly.
c.) Contractor works includes all work including tie in with exisitng terminal inside Station and with pipeline | - | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
CommercialVolume.pdf
Tender Documents • 3.36 MB
TechnicalVolume.pdf
Additional Documents • 17.42 MB
BOQ_83675.xls
BOQ • 0.62 MB
Corrigendum01.pdf
PDF • 0.10 MB
RTBQ.pdf
PDF • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].