Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹10.7 L+₹12,041.98 (1.13%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹10.9 L+₹29,165.90 (2.75%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹11.0 L
EMD Value
₹22,095
Closing Date
27 Nov 2025, 5:00 pmClosed
CEO TEMPLE BOARD NATHDWARA
CEO TEMPLE BOARD NATHDWARA
Repair and renovation of Moti Mahal Gate at Jatipura ,Mathura (U.P.)
2025_NATB_513607_7
5732/NV/2025 DT. 15/11/2025
Open Tender
Civil Works
Percentage
90 days
JATIPURA Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
NATHDWARA TEMPLE BOARD/MDRISL JAIPUR
₹22,095
2 Dec 2025
18 Nov 2025
29 Nov 2025
18 Nov 2025
27 Nov 2025
18 Nov 2025
Dismantling steel work in single sections including dismembering and stacking within 50 meters lead in: Channels, angles, tees & flats.
Refebrication work with existing steel work including cutting, welding & refebrication as per requirement with fixing at site complete as per direction of Engineer In charge
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soils
Carriage of following material including loading unloading and stacking if required complete in all respect.Earth, Sand, Lime, Moorum, manure or sludge, Building Rubbish, Stone Metal (Girt and ballast etc), Stone for Masonry work & Soling and Excavated rock etc. 5km
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in : cement mortar 1:4 (1 cement : 4 coarse sand)
CEMENT PLASTER (IN FINE SAND) 20 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand)
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.
Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : 13.48.1 Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr/10 sqm
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes
Neat cement punning.
stage.html
html • 0.03 MB
technical_916066.pdf
techsummary_916066.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
AgreementConditions.pdf
Tender Documents • 2.50 MB
BOQ_916066.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .