Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.3 LAccepted-AOC 1 234 8 | ALIGARH | UTTAR PRADESH | 202001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹15.1 L+₹80,173.53 (5.61%)Rejected-Finance 0 WARD NO 9 PIPERTAR KATHAN KHAMARIA POLICE CHOWKI SANT RAVIDAS NAGAR UTTAR PRADESH 221306 | BHADOHI | UTTAR PRADESH | 221306 | L2 | Rejected-Finance L2 | |
| 3 | L3₹15.3 L+₹95,803.59 (6.70%)Rejected-Finance ALIGARH | UTTAR PRADESH | 202001 | L3 | Rejected-Finance L3 | |
| 4 | L4₹15.7 L+₹1.4 L (9.82%)Rejected-Finance ALIGARH UTTAR PRADESH | ALIGARH | UTTAR PRADESH | 202001 | L4 | Rejected-Finance L4 | |
| 5 | L5₹16.2 L+₹1.9 L (13.4%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S Harish Kumar Contractor L1 | SHRI BALAJI CONSTRUCTION L2 | SURESH CHANDRA CONTRACTOR L6 | M/S PRADEEP ASSOCIATES L10 | S R CONTRACTORS L8 | S F INFRA PROJECTS L4 | MAHIPAL SINGH THEKEDAR L9 | M/S SANTOSH KUMAR YADAV L3 | SHREE RAMESHWAR SINGH L5 | M/s Balaji Construction & Suppliyer L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | EARTH WORK IN FOUNDTION IN DRY SOIL INCLUDING LEFT UP TO 1.50 AND LEAD UP TO 30M INCLUDING BACK FILLING WATERING AND RAMING OF EXCVATED EARTH IN TO THE STRUCTURE AND THE SIDES OF FOUNDATION TRENCHES OR INTO THE PLINGTH WITH REMOVAL AND DISPOSAL OF SURPLUS EARTH AS DIRECTED BY ENGINEER IN CHARGE UP TO 30 METER LEAD FROM THE FOUNDATION | 37.32 | CUM | 67.57 ₹2,521.71 | 71.39 ₹2,664.27 | 50 ₹1,866 | 80 ₹2,985.6 | 80 ₹2,985.6 | 40 ₹1,492.8 | 39 ₹1,455.48 Lowest | 50 ₹1,866 | 40 ₹1,492.8 | 61 ₹2,276.52 |
| 2.00 | UPROOTTING JHUNDS AND MOONJ DISPOSAL AWAY FROM SITE | 2,942 | SQM | 23.65 ₹69,578.3 | 24.98 ₹73,491.16 | 20 ₹58,840 | 20 ₹58,840 | 17 ₹50,014 | 5 ₹14,710 | 9 ₹26,478 | 11 ₹32,362 | 3 ₹8,826 Lowest | 27 ₹79,434 |
| 3.00 | CLEANING THIKS BUSHES AND THORNY JUNGLE WITHOUT UPROOTING | 5,884 | SQM | 2.97 ₹17,475.48 | 3.14 ₹18,475.76 | 2 ₹11,768 | 3 ₹17,652 | 2 ₹11,768 | 1 ₹5,884 Lowest | 9 ₹52,956 | 1.5 ₹8,826 | 3 ₹17,652 | 3.1 ₹18,240.4 |
| 4.00 | PROVIDING AND LAYING C C 1 3 6 IN FOUNDATION AND FLOOR INLUDING COST OF MATERIAL LABOUR T AND P ETC | 0.6 | CUM | 4,662.33 ₹2,797.4 | 4,640.4 ₹2,784.24 | 5,000 ₹3,000 | 4,000 ₹2,400 | 4,500 ₹2,700 | 5,000 ₹3,000 | 3,900 ₹2,340 | 4,850 ₹2,910 | 500 ₹300 Lowest | 4,550 ₹2,730 |
| 5.00 | RCC PRECAST BOUNDARY COMPOUND WALL SUB PRESTRESSED PRECAST BOUNDARY WALL INDTALLATION M 25 GRADE CONCRETE COMPOND WALL PILLAR SIZE 150MM X 150MM WITH 7 NOS 3MM HTC WIRE AND M 25 GRADE CONCRETE PANEL SIZE 300mm X 45mm X 2100 mm WITH 4 Nos 3mm HTC WIRE AND 2 SIDE SAME FINISHING M 25 GRADE CONCRET INCLUDING ALL MATERIAL LABOUR TRANSPORTTION ETC | 1,422.4 | SQM | 777.06 ₹11,05,290.14 Lowest | 821 ₹11,67,790.4 | 910 ₹12,94,384 | 1,000 ₹14,22,400 | 950 ₹13,51,280 | 900 ₹12,80,160 | 999 ₹14,20,977.6 | 870 ₹12,37,488 | 950 ₹13,51,280 | 910 ₹12,94,384 |
| 6.00 | CENTERING AND SHUTTERING FOR R C C WORKWORK INCLUDING ALL COST OF MATERIAL LABOUR AND T AND P | 19.79 | SQM | 543.94 ₹10,764.57 | 574.69 ₹11,373.12 | 300 ₹5,937 | 500 ₹9,895 | 590 ₹11,676.1 | 500 ₹9,895 | 49 ₹969.71 Lowest | 400 ₹7,916 | 500 ₹9,895 | 599 ₹11,854.21 |
| 7.00 | STEEL REINFOCEMENT INCLUDING BENDING BINDING CUTTING PLACEING OF REINFORCEMENT MATERIAL LABOUR T AND P | 0.29 | MT | 55,237.12 ₹16,018.76 | 58,360 ₹16,924.4 | 75,000 ₹21,750 | 65,000 ₹18,850 | 70,000 ₹20,300 | 65,000 ₹18,850 | 60,000 ₹17,400 | 6,400 ₹1,856 Lowest | 76,000 ₹22,040 | 66,500 ₹19,285 |
| 8.00 | RCC 1 1.5 3 IN SALB AND ABUTMENT INCLUGDING ALL MATERIAL LABOUR AND T AND P ETC COMPLETE | 2.43 | CUM | 5,130.52 ₹12,467.16 | 5,420 ₹13,170.6 | 6,000 ₹14,580 | 6,000 ₹14,580 | 6,500 ₹15,795 | 7,000 ₹17,010 | 5,900 ₹14,337 | 6,400 ₹15,552 | 6,000 ₹14,580 | 5,100 ₹12,393 Lowest |
| 9.00 | FINISHING WALLS TWO COATS WITH WATER PROOFING CEMENT PAINT OF APPROVED MAKE AND QALITY ON NEW WOOD WITH TWO COAT TO GIVE AN EVEN SHADE INCLUDING SUPPLY OF ALL MATERIAL LABOUR TOOLS AND PLANTS ETC REUIRED FOR PROPER COMPLETION OF THE WORK | 2,570 | SQM | 48.91 ₹1,25,698.7 | 51.4 ₹1,32,098 | 50 ₹1,28,500 | 55 ₹1,41,350 | 50 ₹1,28,500 | 60 ₹1,54,200 | 49 ₹1,25,930 | 55 ₹1,41,350 | 70 ₹1,79,900 | 47 ₹1,20,790 Lowest |
| 10.00 | SUPPLYING AND FIXING MAIN STEEL GATE OF 4.00 X 2.00 AND SLIDE GATE OF 1.50 X 2.00 ON RECTANGULAR HOLLOW SEWCTION PIPE WITH ONE COAT OF RED OXIDE PRIMER AND PAINTING WITH SYNTHETIC ENAMEL PAINT OF APPROVED BRAND AND MANUFACTURE TO GIVE AN EVEN SHADE IB=NCLUDING COST OF ALL MATERIAL LABOUFR AND T AND P ETC | 1 | NO | 63,831.69 ₹63,831.69 | 67,439.99 ₹67,439.99 | 85,000 ₹85,000 | 80,000 ₹80,000 | 40,000 ₹40,000 | 60,000 ₹60,000 | 6,000 ₹6,000 Lowest | 73,000 ₹73,000 | 10,000 ₹10,000 | 74,629 ₹74,629 |
Tender Value
₹21.2 L
EMD Value
₹42,320
Closing Date
10 Sept 2025, 2:00 pmClosed
EE ADGC ALIGARH
EE ADGC ALIGARH
CONSTRUCTION OF BOUNDRY WALL THE SECURITY OF SIHANI FAREEDPUR INPECTION HOUSE SITUATED ON ANUPSHAHR BRANCH
2025_UPIDC_1070366_9
3542 dt 23.08.2025
Open Tender
Civil Works
Item Rate
90 days
ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹42,320
19 Nov 2025
4 Sept 2025
10 Sept 2025
4 Sept 2025
10 Sept 2025
4 Sept 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .