Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.7 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹48.6 L+₹1.1 L (2.28%)Rejected-Finance HO MALLAGURI NORTH P O CHAMPASARI PS PRADHAN NAGAR VILL PRADHAN NAGAR DISTT DARJEELING W B PIN 734003 | DARJEELING | WEST BENGAL | 734003 | L2 | Rejected-Finance Not Lowest | |
| 3 | L3₹50.0 L+₹2.4 L (5.09%)Rejected-Finance | L3 | Rejected-Finance Not Lowest | |
| 4 | L4₹51.6 L+₹4.0 L (8.43%)Rejected-Finance | L4 | Rejected-Finance Not Lowest | |
| 5 | L5₹53.2 L+₹5.7 L (11.9%)Rejected-Finance SREE COLONY BAGDOGRA PO BAGDOGRA DIST DARJEELING WB | L5 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | M/S ASOKE KUMAR MAJUMDER L1 | SRI SURAJIT SENGUPTA L4 | M/S S.B. CONSTRUCTION L5 | SURESH JHA L3 | Raj Enterprise L6 | M/S STANDARD CONSTRUCTION CO L2 | M/S L N CHOWDHURY L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning of AC/CI pipes vertical or horizontal sewage line of any bore (from first floor to ground floor/ground floor to inspection chamber) by rodding thoroughly and removal of blockage by opening inspection chamber and flushing with water after cleaning complete as specified and as directed.(Cleaning of inspection chamber shall be measured and paid separately). | 2,000 | RM | 12 ₹24,000 | 14 ₹28,000 | 15 ₹30,000 | 13 ₹26,000 | 16 ₹32,000 | 10 ₹20,000 Lowest | 17 ₹34,000 |
| 2.00 | De-sludging, Cleaning and dewatering of sludge(liquid) from septic tank through pumping set or other mechanical means including cleaning of sludge/grass/bushes and disposing off sludge in the excavated pit as directed by Engineer-in-Charge including spreading bleaching powder and filling of pit by earth complete as specified and as directed by Engineer-in-Charge.
Note :- (i) Earth to be filled over the pit shall be filled after sufficient absorption of liquid and size of pit shall be made accordingly.
(ii) To avoid any health hazard or spreading of any foul gas, bleaching powder shall be spread as directed by the Engineer-in-charge. Cost of spreading bleaching powder and excavating the earth pit and filling of earth etc shall be deemed to be included in the rate quoted under this item but supply of bleaching powder shall be measured and paid separately. | 600 | CUM | 198 ₹1,18,800 Lowest | 215 ₹1,29,000 | 222 ₹1,33,200 | 210 ₹1,26,000 | 232 ₹1,39,200 | 200 ₹1,20,000 | 240 ₹1,44,000 |
| 3.00 | De-sludging/cleaning completely of solid sludge by pumping and or manually from inside the septic tank and removal of sludge to a distance as directed by Engineer-in-Charge and depositing the sludge in a excavated pit of appropriate size as directed duly filled up with earth in layers of 30 cm thick including spreading bleaching powder and taking out RCC manhole cover slab for cleaning and resetting in CM 1:6 after cleaning complete as specified and as directed. Note :- (i) Earth to be filled over the pit shall be filled after sufficient absorption of liquid and size of pit shall be made accordingly.
(ii) To avoid any health hazard or spreading of any foul gas, bleaching powder shall be spread as directed by the Engineer-in-charge. Cost of spreading bleaching powder and excavating the earth pit and filling of earth etc shall be deemed to be included in the rate quoted under this item but supply of bleaching powder shall be measured and paid separately. | 800 | CUM | 225 ₹1,80,000 Lowest | 245 ₹1,96,000 | 253 ₹2,02,400 | 240 ₹1,92,000 | 264 ₹2,11,200 | 230 ₹1,84,000 | 260 ₹2,08,000 |
| 4.00 | Cleaning of sewage drain pipe of stone ware pipe, RCC Hume pipe , cast iron pipe of 75 mm bore by rodding with sectional sewer rod/flexible sewer rod/bucket etc thoroughly from inspection chamber to man hole or from one manhole to another manhole of any depth and size and well flushing with water after cleaning including removal of sludge and other materials obtained from cleaning the drain pipe and manhole garbage to a pit made for this purpose and filling up the earth complete as specified and as directed. Note :-(i) Cleaning of sewage line to be started from down stream side in this operation for which some pipe line gets cleaned automatically which needs to be cleaned by rodding only and hence the same shall not be measured (ii) The unit rate of the items shall be deemed to be included for the cost of removal of sludge/waste and water accumulated in manhole/inspection chamber due to cleaning of drain by rodding etc. (iii) The sludge obtained shall be deposited in an excavated pit and filled up with earth in layers of 30cm thick as directed by Engineer-in-Charge. Cost of spreading bleaching powder and excavating the earth pit and filling of earth etc. shall be included in the rate quoted under this item but supplying of bleaching powder shall be measured and paid separately. (iv) To avoid any health hazard or spreading of any foul gas bleaching powder shall be spread over each earth layers as directed by Engr-in-Charge. | 1,800 | RM | 30 ₹54,000 Lowest | 33 ₹59,400 | 34 ₹61,200 | 32 ₹57,600 | 36 ₹64,800 | 31 ₹55,800 | 37 ₹66,600 |
| 5.00 | All as per item No. 4 above but bore of pipe 100mm | 2,200 | RM | 42 ₹92,400 Lowest | 45 ₹99,000 | 47 ₹1,03,400 | 44 ₹96,800 | 49 ₹1,07,800 | 43 ₹94,600 | 51 ₹1,12,200 |
| 6.00 | All as per item No 4 above but bore of pipe 150mm | 3,600 | RM | 43 ₹1,54,800 Lowest | 46 ₹1,65,600 | 48 ₹1,72,800 | 45 ₹1,62,000 | 50 ₹1,80,000 | 44 ₹1,58,400 | 52 ₹1,87,200 |
| 7.00 | All as per item No. 4 above but bore of pipe 200mm | 4,000 | RM | 58 ₹2,32,000 Lowest | 63 ₹2,52,000 | 65 ₹2,60,000 | 61 ₹2,44,000 | 68 ₹2,72,000 | 59 ₹2,36,000 | 70 ₹2,80,000 |
| 8.00 | Cleaning of inspection chamber/gully trap including flushing with water or pumping air all as directed. | 1,200 | EACH | 80 ₹96,000 Lowest | 87 ₹1,04,400 | 90 ₹1,08,000 | 85 ₹1,02,000 | 95 ₹1,14,000 | 82 ₹98,400 | 98 ₹1,17,600 |
| 9.00 | Cleaning of manhole any size and any depth complete including flushing water or pumping air complete as specified and as directed. | 900 | EACH | 200 ₹1,80,000 Lowest | 215 ₹1,93,500 | 220 ₹1,98,000 | 205 ₹1,84,500 | 230 ₹2,07,000 | 204 ₹1,83,600 | 225 ₹2,02,500 |
| 10.00 | Excavation in trenches n.exc 1.5 m wide and n.exc 1.5m depth for pipes, manholes, etc not exceeding 10 sqm on plain and not exceeding 1.5 meter in depth and getting out in soft/loose soil complete as specified and as directed. | 47.4 | CUM | 272 ₹12,892.8 Lowest | 295 ₹13,983 | 300 ₹14,220 | 280 ₹13,272 | 315 ₹14,931 | 278 ₹13,177.2 | 325 ₹15,405 |
Tender Value
₹47 L
EMD Value
₹94,000
Closing Date
27 Sept 2025, 6:00 pmClosed
GE SEVOKE ROAD
GE Sevoke Road Post Salugara Dist Jalpaiguri PIN 734008
CLEANING, REPAIR AND MAINT OF SEWAGE LINES, MANHOLES, SEPTIC TANK, SOAKAGE PIT AND MISC WKS AT ZONE B AREA OF SEVOKE MIL STN UNDER GE SEVOKE ROAD
2025_MES_728408_1
8519/SEV OF 2025-26
Open Tender
Civil Works
Item Rate
180 days
GE SEVOKE ROAD
AS PER TENDER DOCUS
8 documents required · 8 mandatory
₹500
GE SEVOKE ROAD
₹94,000
28 Nov 2025
29 Aug 2025
29 Sept 2025
29 Aug 2025
27 Sept 2025
13 Sept 2025
30 Aug 2025 - 9 Sept 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .