Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.1 LAccepted-AOC NOT AVAILABLE | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹33.4 L+₹29,212.55 (0.88%)Rejected-Finance B 13 ROOM NO 2 2 SHIVA PALM BEACH SOCIETY SECTOR4 NERUL WEST NAVI MUMBAI 400 706 | THANE | MAHARASHTRA | 400706 | L2 | Rejected-Finance Being not lowest | |
| 3 | L3₹35.2 L+₹2.1 L (6.40%)Rejected-Finance | L3 | Rejected-Finance Being not lowest | |
| 4 | L4₹36.1 L+₹3.0 L (9.05%)Rejected-Finance B 134 GANESH MURTHI NAGAR PART III COLABA MUMBAI 400 005 | MUMBAI | MAHARASHTRA | 400005 | L4 | Rejected-Finance Being not lowest | |
| 5 | L5₹38.5 L+₹5.4 L (16.4%)Rejected-Finance ROOM NO D 297 PART III GANESH MURTI NAGAR CUFF PARADE ROAD COLABA MUMBAI 400005 | MUMBAI | MAHARASHTRA | 400005 | L5 | Rejected-Finance Being not lowest |
| Sl No | Description | Qty | Unit | SHRI SAI ENTERPRISES L4 | Shetty Construction Co L3 | Anil Industrial Corporation L2 | SHREE SHIV SHANKER ENTERPRISE L7 | N.S.ENTERPRISES L8 | vikas construction & co L6 | SAHU AND SAHU CO. L1 | GANGAJAL L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete in floors, pavings, plinth protection and sunken portion and removing debries out side MOD land, complete all as specified and directed. | 17 | Cum | 500 ₹8,500 | 300 ₹5,100 | 345 ₹5,865 | 250 ₹4,250 | 400 ₹6,800 | 200 ₹3,400 Lowest | 200 ₹3,400 Lowest | 888 ₹15,096 |
| 2.00 | Material and labour for PCC 1:4:8, type D-2 (using 40 mm graded stone aggregate) as in foundation filling, mass concrete and sunken floor treatments, complete all as specified and directed. | 3.6 | Cum | 4,500 ₹16,200 | 4,000 ₹14,400 | 3,333 ₹11,998.8 | 4,500 ₹16,200 | 3,000 ₹10,800 Lowest | 3,000 ₹10,800 Lowest | 4,000 ₹14,400 | 3,700 ₹13,320 |
| 3.00 | M & L for Water proofing treatment to sunken slab /floors/walls etc and shall be carried out as specified below and as directed.
(a) Cleaning the sunken portion of Toilet/bath/WC/Kitchen throughly to remove the laitance, dirt etc and thrown out side the MD land. (b) Form angle fillet of size 50 mm x 50 mm along the junction of wall and floor using polymer modified mortar, Apply one coat of polymer coating on all angle fillets by brush and cover it with 100 mm open glass fibre/geotextile fibre mesh when it is still wet. Apply second coat of the same coating on the angle fillet and allow it to dry completely. Make:- PIDILITE (Dr fixit Pidicrete URP)/ ASIAN (smarcare repair polymer) /FOROC/BASF/SIKA. (c) Sanitary pipe entering through walls and floor shall be sealed with bitumin based seal tape / epoxy bonding agent and gaps to be grouted with non shrink cementitious grout . Nahani traps etc to be fitted securely and gaps around it to be grouted in the same manner. Make:- PIDILITE (Dr fixit epoxy bonding agent or bathseal tape )/ AISAN (Smartcare apcorap epoxy bonding agent). | 24 | Sqm | 600 ₹14,400 | 1,000 ₹24,000 | 678 ₹16,272 | 1,150 ₹27,600 | 550 ₹13,200 | 400 ₹9,600 | 300 ₹7,200 Lowest | 1,247 ₹29,928 |
| 3.01(d) In the remaining area in dry substrate condition brush apply first coat of the acrylic cementitious coating and further apply second coat in perpendicular direcion after 6-8 hours when first coat is dry, and sprinkling quartz sand for shearkey purpose on secon coat in wet condition and allow to dry it completely, Extend the coating up to 1.2 mm above the FFL. Coverage of cementitiou coating to be maintained of min 1.8 kg per sqm for two coats. Make : PIDILITE(Dr fixit fastflex)/ASIAN (ultrablock 2K)/BASF/FOSROCK/SIKA. (e) Sunken portion to be tested for 72 hours for water tightness after only flooring work can be started. Cost for the same shall be deemed to be included in quoted rate. (f) After 2 to 3 days sunken portion must be overlaid with a 50 mm thick concrete screed 1:3:6 type B0 mixed with integral WPC liquid laid to slope 1:60 towards outer face of wall. Provide 40 mm OD CPVC pipe at the lowest point with 600 mm projection beyond the outer face of the wall, then filled up the sunken portion with lean concrete 1:4:8 type D-2. Note : (i) lean concrete 1:4:8 paid saperatly. Note : (ii) All the material involved in sunken treatment shall be deemed to be included in quoted rate and only floor area will be measured for the payment purpose. | |||||||||||
| 4.00 | Material and labour for rendering 10 mm thick in CM (1:4) on fair faces of brickwork or concrete surfaces, with using liquid water proofing compound @ 200 ml per 50 kg bag of cement or as per manufracture's instructions, finished even and smooth without using extra cement, complete all as specified and as directed. Note: WPC shall be measured and paid for seperately under relevant item. | 24 | Sqm | 200 ₹4,800 | 200 ₹4,800 | 189 ₹4,536 | 150 ₹3,600 | 2,350 ₹56,400 | 100 ₹2,400 Lowest | 200 ₹4,800 | 210 ₹5,040 |
| 5.00 | Material and labour for Cement concrete 1:5:10 type E-2 using 40mm graded stone aggregate in foundations, filling and mass concrete including sub base of floors, complete all as specified and as directed. | 4.8 | Cum | 3,500 ₹16,800 | 4,000 ₹19,200 | 1,999 ₹9,595.2 Lowest | 4,500 ₹21,600 | 3,000 ₹14,400 | 2,200 ₹10,560 | 3,000 ₹14,400 | 2,700 ₹12,960 |
| 6.00 | Supply only integral water proofing compound, complete all as specified and as directed. | 10 | Ltr | 150 ₹1,500 | 50 ₹500 Lowest | 199 ₹1,990 | 220 ₹2,200 | 250 ₹2,500 | 50 ₹500 Lowest | 60 ₹600 | 325 ₹3,250 |
| 7.00 | Taking up or down steel tubing and connection including cleaning for refixing or removal to store for 15 mm bore, complete all as specified and as directed. | 165 | RM | 10 ₹1,650 | 10 ₹1,650 | 12 ₹1,980 | 10 ₹1,650 | 12 ₹1,980 | 5 ₹825 Lowest | 20 ₹3,300 | 10 ₹1,650 |
| 8.00 | Taking up or down steel tubing and connection including cleaning for refixing or removal to store for 20 mm bore, complete all as specified and as directed. | 165 | RM | 15 ₹2,475 | 10 ₹1,650 | 12 ₹1,980 | 10 ₹1,650 | 12 ₹1,980 | 7 ₹1,155 Lowest | 20 ₹3,300 | 12 ₹1,980 |
| 9.00 | Supply & fixing UPVC pipes out side dia 16 mm of pressure rating 10 Kgf/Sqcm, fixed to walls, ceilings or in floors etc, complete all as specified and as directed. | 100 | RM | 100 ₹10,000 Lowest | 160 ₹16,000 | 156 ₹15,600 | 150 ₹15,000 | 120 ₹12,000 | 195 ₹19,500 | 150 ₹15,000 | 141 ₹14,100 |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
15 May 2026, 6:00 pmClosed
Kameshwar Prasad, IDSE, EE
GE (W) Colaba, Mumbai - 400 005
REPAIRS TO SUNKEN PORTION, SANITARY/PLUMBING FITTINGS, LOFT TANK AND CERTAIN B/R WORKS AT AREA-II UNDER AGE B/R (CENTRAL) OF GE (WEST) COLABA, MUMBAI
2026_MES_761896_1
8206/E8
Open Tender
Civil Works
Item Rate
270 days
GE(West), Colaba
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE (W) Colaba, Mumbai
₹1 L
Yes
27 Jul 2026
24 Apr 2026
18 May 2026
24 Apr 2026
15 May 2026
8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Demolition of cement concrete in floors, pavings, plinth protection and sunken portion and removing debries out side MOD land, complete all as specified and directed. | - | Cum | - | - |
| - | Material and labour for PCC 1:4:8, type D-2 (using 40 mm graded stone aggregate) as in foundation filling, mass concrete and sunken floor treatments, complete all as specified and directed. | - | Cum | - | - |
| - | M & L for Water proofing treatment to sunken slab /floors/walls etc and shall be carried out as specified below and as directed.
(a) Cleaning the sunken portion of Toilet/bath/WC/Kitchen throughly to remove the laitance, dirt etc and thrown out side the MD land. (b) Form angle fillet of size 50 mm x 50 mm along the junction of wall and floor using polymer modified mortar, Apply one coat of polymer coating on all angle fillets by brush and cover it with 100 mm open glass fibre/geotextile fibre mesh when it is still wet. Apply second coat of the same coating on the angle fillet and allow it to dry completely. Make:- PIDILITE (Dr fixit Pidicrete URP)/ ASIAN (smarcare repair polymer) /FOROC/BASF/SIKA. (c) Sanitary pipe entering through walls and floor shall be sealed with bitumin based seal tape / epoxy bonding agent and gaps to be grouted with non shrink cementitious grout . Nahani traps etc to be fitted securely and gaps around it to be grouted in the same manner. Make:- PIDILITE (Dr fixit epoxy bonding agent or bathseal tape )/ AISAN (Smartcare apcorap epoxy bonding agent). | - | Sqm | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
8206TenderPages.pdf
Tender Documents • 1.41 MB
BOQ_853429.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .