Loading…
Loading…
Tender Value
₹45.1 L
EMD Value
₹90,100
Closing Date
9 Mar 2026, 12:00 pmClosed
Carrying out POH schedule related works of various equipments of Mark III/Mark IV Tower Wagon as per scope of work at EMU Workshop, Mahalaxmi.
EL90-MX-2025-26-15~WR
EL90-MX-2025-26-15
Open
Works - General
18 Months
Mumbai, Maharashtra
₹0
₹90,100
9 Mar 2026
16 Feb 2026
23 Feb 2026
1-Carrying out IOH schedule related works of various equipments of 4
2-Dismantling, Repairs, Overhauling, Commissioning and Testing of
Complete Stripping, Dismantling, Repairs, Overhauling, Commissioning and Testing with replacement of worn out spare parts of Hydraulic gear pump assembly ( YUKEN Model PVR-50- F-13-R-3180).
Complete Stripping, Dismantling, Repairs, Overhauling, Commissioning and Testing with replacement of worn out spare parts of Hydraulic Hand pump assembly.
Complete Stripping, Dismantling, Repairs, Overhauling, Commissioning and Testing with replacement of worn out spare parts of solenoid operated direction control valve assembly (YUKEN Model DSG-04-3C.60220V AC)
Complete Stripping, Dismantling, Repairs, Overhauling, Commissioning and Testing with replacement of worn out spare parts of pressure relief valve assembly (YUKEN Model BG-03-32)
Complete Stripping, Dismantling, Repairs, Overhauling, Commissioning and Testing with replacement of worn out spare parts of pilot operated check valve assembly
Complete Stripping, Dismantling, Repairs, Overhauling, Commissioning and Testing with replacement of worn out spare parts of pressure reducing valve assembly
Complete Stripping, Dismantling, Repairs, Overhauling, Commissioning and Testing with replacement of worn out spare parts of Check valve assembly
Replacement of breather cup oil filter
3-Carrying out overhauling of various equipments of 4-wheeler Tower
Labour charge for Axle Drive Gear Box (ADGB)
Labour charge for LIFTING AND SWIVELING PLATFORM
Supply suction strainer for ADGB
Supply of EP -90 oil for ADGB 45 litre/ tower wagon.
4-Carrying out overhauling of 7.5 KVA DG set , Lifting Platform and
5-Supply and fitment of items as per Annexure G for Phooltas Tower
Pneumatic Hoses
Air Dyer Type LD-4
gear box (ADGB), Cummins engine NTA 855R/NT743L, Radiator assembly, Transmission CRT 5633,
Swiveling platform, Hydraulic system, overhauling and testing of engine starter, alternator as per
Item- 1 Labour charges for overhauling
WR-EMU-WS-MX-ELECTRICAL/WESTERN RLY
S No. Item Description of Item Unit Qty Rate Amount
6 6 Engine Starter and Auxilary Alternator Numbers 1.00 16117.50 16117.50
7 7 Lifting and swivelling platform Numbers 1.00 28355.65 28355.65
Item- 2 Supply of spares required for replacement
S No. Item Description of Item Unit Qty Rate Amount
1 1 Filters for Engine (01 Set consist of 2 nos. Oil Set 1.00 10476.30 10476.30
filters, 2 nos. Fuel filters, 1 no. Air filter alongwith
4 4 Suction stainer for Axle Drive Gear Box ADGB Numbers 1.00 1853.51 1853.51
Schedule 4-Carrying out overhauling of 7.5 KVA DG set , Lifting Platform and ADGB of Phooltas
Tower wagon Mark-IV
Item- 1 Overhauling of Hydraulic Lifting platform of Phooltas make, Tower Wagon Mark-IV.
S No. Item Description of Item Unit Qty Rate Amount
1 1 Labour Charges for Complete repair including Numbers 4.00 193379.92 773519.68
dismantling cleaning, inspection, testing
assembling, commissioning and successful trial of
Hydraulic Lifting platform of 4 wheeler Phooltas
tower wagon Mark-IV.
2 2 Mandatory spares required for repairing of Numbers 4.00 48333.78 193335.12
hydraulic lifting platform as per Annexure B
3 3 Optional spares to be provided during repair as Numbers 4.00 150000.00 600000.00
per annexure C ( lump sum provision of 1.5 lakh
is kept for each Tower wagon to replace any
defective optional spare found during joint
Item- 2 Overhauling of Axle Drive Gear Box Assembly of Phooltas make, Tower wagon
S No. Item Description of Item Unit Qty Rate Amount
1 1 Labour Charges for Complete repair including Numbers 4.00 149310.00 597240.00
dismantling cleaning, inspection, testing
assembling, commissioning and successful trial of
Axle Drive Gear Box of Phooltas tower wagon
2 2 Mandatory spares required for repairing of Axle Numbers 4.00 33281.19 133124.76
Drive Gear Box as per Annexure D
3 3 Supply of EP -90 oil for ADGB 45 litre/ tower Litre 150.00 181.20 27180.00
4 4 Optional spares to be provided during repair as Numbers 4.00 200000.00 800000.00
per annexure E ( lump sum provision of 2 lakh is
kept for each Tower wagon to replace any
defective optional spare found during joint
Item- 3 Overhauling of DG set 7.5KVA of Phooltas make, Tower wagon
S No. Item Description of Item Unit Qty Rate Amount
WR-EMU-WS-MX-ELECTRICAL/WESTERN RLY
1 1 Labour Charges for Complete repair including Numbers 4.00 35828.76 143315.04
dismantling cleaning, inspection, testing
assembling, commissioning and successful trial of
DG Set 7.5 KVA of Phooltas tower wagon Mark-IV.
2 2 Mandatory Spares to be replaced during Numbers 4.00 70867.19 283468.76
Overhauling of DG Set (7.5 KVA)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Annexure-VSignedCopy.pdf
ATTACHMENT
GCCApril2022withCS.pdf
ATTACHMENT
TenderDocument.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].