Loading…
Loading…
Tender ID
Tender Value
Refer Docs
Closing Date
17 Apr 2026, 5:30 amClosed
NHIT Western Projects Private Limited
Unit 325, 3rd Floor, D21 Corporate Park, Sector 21, Dwarka, Dhulsiras, New Delhi-110077
Request for Proposal (“RFP”) issued by NHIT Western Projects Private Limited (NWPPL) for Engagement of Agency/Firm for Repair and Rectification of MCW Under R&R-Repair of Pavement on Agra Bypass Project under NWPPL in the state of Uttar Pradesh.
NWPPL/FY25-26/RFP/Agra Bypass/Pavement Rectification
NWPPL/FY25-26/RFP/Agra Bypass/Pavement Rectification
RFP
Uttar Pradesh
9 Apr 2026
9 Apr 2026
17 Apr 2026
Scarification /Milling This item covers the milling of bituminous surfaces up to a depth of 50mm, as per MoRTH Clause 111 and Clause 3004. The work shall be executed using a cold milling machine such as Wirtgen W100H or equivalent, having a minimum milling width of 1 meter and a capacity of at least 100 HP, capable of achieving the desired depth in a single pass. The milled surface shall be uniform, free from loose material, and prepared for subsequent works. Milled material shall be collected and loaded into suitable transport vehicles immediately to prevent site obstruction. The quoted rate shall include all costs necessary to complete the work but not limited to the cost of equipment mobilization, milling, collection, loading, fuel, tools, labor, and traffic safety arrangements. Approval of the Engineer-in-Charge for the machine and methodology is mandatory. Measurement: per sqm of milled area, inclusive of all operations, which shall adhere to relevant safety and environmental regulations.
The Bituminous Concrete (BC)- work involves the supply and laying of VG-40 bitumen mixed with aggregates to restore the road surface in areas requiring patchwork or pothole filling. The BC mix shall be prepared in an approved Hot Mix Plant (HMP), ensuring that the bitumen and aggregates are mixed in the correct proportions. The prepared BC will be transported to the site and laid using a manual paver or small vibratory rollers. The laid material will be compacted to the specified thickness and density using vibratory rollers or hand rollers. The bitumen consumption for BC is expected to be 5.5 to 6.0 kg per sqm for a 25 mm compacted thickness. The quoted rate shall include all costs necessary to complete the work, but not limited to the cost of VG-40 bitumen, aggregates, transportation from the HMP, laying, compaction equipment, labor for laying and compaction, and ensuring quality control. The contractor shall ensure that the work is completed in compliance with MoRTH Section 507 specifications for BC, including the required material properties, compaction, and surface finish.
Tack Coat-The work involves the application of a tack coat to prepare the surface for the next layer of bituminous material. The existing road surface shall be thoroughly cleaned to remove dust, debris, and loose material before the tack coat is applied. Bitumen (IS 73: 2013) shall be heated and sprayed evenly at a rate of 0.25 to 0.3 kg per sqm using a mechanical sprayer, in accordance with MoRTH Section 503. The contractor shall ensure that the tack coat is applied evenly and allowed to cure before the next layer is laid. The quoted rate shall include all costs necessary to complete the work, but not limited to the cost of bitumen, application equipment, labor for surface preparation and tack coat application, and any other resources necessary for the proper execution of the work. Quality checks shall be performed to ensure that the tack coat is applied at the specified rate and is uniformly spread. bitumen pressure sprayer equipped for spraying the material uniformly at specified rates and temperatures as per MORTH specification CI.503,112 ( Including cleaning of Road Surface )
Chainage of Distress
Width
Chainage of Distress
Width
Site End Chainage
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
metadata.json
RAW_JSON
RFP - Pavement Ractification Agra Bypass NWPPL 09.04.2026.pdf
TENDER_DOCUMENT • 6.51 MB
Annexure C3 BoQ Pavement Rectification ABRP NWPPL.xls
BOQ_DOCUMENT • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .