Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
8 Aug 2022, 4:30 pmClosed
EX Engineer IFCD Kupwara
Executive Engineer IFCD Kupwara
Renovation/ up-gradation of Buta sar at Walkul block Sogam.
2022_IFC_181888_4
Fresh e-Nit No 15 of 2022-23
Open Tender
Civil Works
Item Rate
15 days
Ex Engineer IFCD Kupwara
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Yes
Ex Engineer IFCD Kupwara
₹10,000
Yes
9 Aug 2022
30 Jul 2022
9 Aug 2022
30 Jul 2022
8 Aug 2022
30 Jul 2022
Amount
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge, all kinds of soil.
Providing and laying of dry stone soling.
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc.
Carriage of Materials from source up to road side of site of work by Mechanical Transport including loading, unloading and stacking
Sand from an avg. 45 Kms
20mm stone aggregrate fro an avg. 15 Kms
Cement from an avg. 10 Kms
Extra carriage of materials from road side up to site of work by manual labour/ ponnies incl. loading, un-loading and stacking for avg. 50 Mtrs.
20 mm stone agg.
Cement
ABDUL GANI DOBI
M/S REYAZ AHMAD MIR
GHULAM RUBANI GAIJI
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .