| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC | L1 | Accepted-AOC lower bid value | |
| 2 | L2₹4.3 L+₹33,942.50 (8.56%)Rejected-Finance BIMAGUR RAIGANJ UTTAR DINAJPUR | RAIGANJ | UTTAR DINAJPUR | WEST BENGAL | L2 | Rejected-Finance higher bid value | |
| 3 | L3₹4.9 L+₹98,061.63 (24.7%)Rejected-Finance BANDAR SHYAMAPALLY P O RAIGANJ DIST UTTAR DINAJPUR PIN 733134 WEST BENGAL | RAIGANJ | UTTAR DINAJPUR | WEST BENGAL | 733134 | L3 | Rejected-Finance higher bid value | |
| 4 | L4₹5.0 L+₹1.0 L (26.2%)Rejected-Finance | L4 | Rejected-Finance higher bid value | |
| 5 | L5₹5.1 L+₹1.1 L (28.1%)Rejected-Finance MALGAON GRAM PANCHAYAT PO RAGHUNATHPUR DT U D WEST BENGAL | KOLKATA | WEST BENGAL | 700001 | L5 | Rejected-Finance higher bid value |
Tender Value
₹5.0 L
EMD Value
₹9,910
Closing Date
14 Sept 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASSISTANT ENGINEER RAIGANJ HIGHWAY SUB DIVISION
OFFICE OF THE EXECUTIVE ENGINEER RAIGANJ HIGHWAY SUB DIVISION RAIGANJ 733134
Instaltion of rainwater Harvesting Pits between 6.50 km to 7.15 km alongside Churaman itahar Kushmandi Road in view of Road side water accumulation during monsoon and cleaning of roadside garbage and siltation and alied works from 4.35 km to 7.15 km
2026_WBPWD_5022192_4
AE/RHSD/WB/PWRD/NIT14_2026_27
Open Tender
CIVIL WORKS
Percentage
15 days
RAIGANJ
Please refer Tender documents.
4 documents required · 4 mandatory
₹9,910
Yes
8 Oct 2026
7 Sept 2026
16 Sept 2026
7 Sept 2026
14 Sept 2026
7 Sept 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 12,376 | Sqm | 17.6 | ₹2,17,817.6 |
| 2 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 7,140 | Sqm | 8.95 | ₹63,903 |
| 3 | Making soak pit 2.5 m diameter 3.0 metre deep with 45 x 45 cm dry brick honey comb shaft with bricks and S.W. drain pipe 100 mm diameter, 1.8 m long complete as per standard design.With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 | 5 | Each | 26,861.9 | ₹1,34,309.5 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kind of Soil. | 0.9 | Cum | 177.5 | ₹159.75 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.54 | Cum | 7,878.5 | ₹4,254.39 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete. | 1.2 | Sqm | 392.15 | ₹470.58 |
| 7 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 38.4 | Kg | 107.85 | ₹4,141.44 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.32 | Cum | 9,045.75 | ₹2,894.64 |
| 9 | Add Modified Estimated Cost after using Correction factor on DSR 2023 on account of GST @ 0.973 as per O.M. issued by DG, CPWD vide No. 158/SE(TAS)/GST/ 2024/02-E Dated: 08/08/2024 | - | Each | 0.97 | - |
| 10 | Add GST @ 18% | - | % | 19 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_5102565.xls
BOQ • 0.33 MB
2911NEW.pdf
Tender Documents • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .