| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.2 LAccepted-AOC | ₹12.2 L | L1 | Accepted-AOC AWARD OF CONTRACT IS GIVEN TO THE CONTRACTOR |
| 2 | L2₹12.7 LRejected-Finance | ₹12.7 L | L2 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among two. |
| Sl No | Description | Qty | Unit | AKHILESH KUMAR GANGWAR L2 | M/S SUDHIR CHANDRA CONSTRUCTION AND SUPPLIER L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in wet soil including lift up to 1.50 m and lead up to 30 m and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into | 158.77 | cum | 132 ₹20,958.17 | 88 ₹13,972.11 |
| 2.00 | Centering and shuttering (steel shuttering) for C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | 27.07 | sqm | 500 ₹13,533.50 | 499 ₹13,506.43 |
| 3.00 | Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 25.17 | cum | 5,665.5 ₹1.4 L | 5,664 ₹1.4 L |
| 4.00 | Laying R.C.C. 1:1.5:3 Mix (M-20) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | 23.87 | cum | 6,907.3 ₹1.6 L | 6,907 ₹1.6 L |
| 5.00 | Brick work in 1:4 cement mortar in Abutment, Wing wall & Parapet etc.up to 3 m lift and 60 M lead including cost of all material, labour and T&P required for proper completion of work. | 51.19 | cum | 5,230.6 ₹2.7 L | 5,225 ₹2.7 L |
| 6.00 | Cement pointing in 1:2 cement mortar (struck deep) on brick masonary including cost of all material, labour and T&P etc. required for proper completion of work. | 63.21 | sqm | 115.9 ₹7,326.50 | 115 ₹7,269.61 |
| 7.00 | Centering and shuttering (steel shuttering) for R.C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | 43.57 | sqm | 822 ₹35,814.54 | 822 ₹35,814.54 |
| 8.00 | Reinforcement including cutting, bending & binding in position including cost of bindingwire and also including all cost of labour, material and T&P etc. required for proper completion of work. | 3.11 | M.T | 65,140.6 ₹2.0 L | 65,000 ₹2.0 L |
| 9.00 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit in wearing coat including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. | 4.57 | cum | 7,736.5 ₹35,379.01 | 7,736 ₹35,376.73 |
| 10.00 | Providing and fixing Drainage Spouts (100 mm dia) complete including cost of all material, labour and T&P etc. required for proper completion of work. | 1.98 | R.M | 171.3 ₹339.17 | 171 ₹338.58 |
Tender Value
₹12.8 L
EMD Value
₹1.3 L
Closing Date
6 Apr 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
O/O EXECUTIVE ENGINEER, MADHYA GANGA CANAL CONSTRUCTIO DIVISION-9, SABHAL
CONSTRUCTION OF V.R.B AT KM 12.920 OF KAILY DY.
2026_UPIDC_1128908_1
01/EE/2025-26
Open Tender
Civil Works - Canal
90 days
KAILY
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹766
₹1.3 L
SAMBHAL
19 May 2026
23 Mar 2026
6 Apr 2026
23 Mar 2026
6 Apr 2026
23 Mar 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in wet soil including lift up to 1.50 m and lead up to 30 m and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into | 0.6 | cum | - | - |
| 2Centering and shuttering (steel shuttering) for C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | |||||
| 3Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | |||||
| 4Laying R.C.C. 1:1.5:3 Mix (M-20) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | |||||
| 5 | Brick work in 1:4 cement mortar in Abutment, Wing wall & Parapet etc.up to 3 m lift and 60 M lead including cost of all material, labour and T&P required for proper completion of work. | 1 | cum | - | - |
| 6 | Cement pointing in 1:2 cement mortar (struck deep) on brick masonary including cost of all material, labour and T&P etc. required for proper completion of work. | 0.6 | sqm | - | - |
| 7Centering and shuttering (steel shuttering) for R.C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | |||||
| 8 | Reinforcement including cutting, bending & binding in position including cost of bindingwire and also including all cost of labour, material and T&P etc. required for proper completion of work. | 0.18 | M.T | - | - |
| 9 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit in wearing coat including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. | 1 | cum | - | - |
| 10Providing and fixing Drainage Spouts (100 mm dia) complete including cost of all material, labour and T&P etc. required for proper completion of work. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.69 MB
Tendernotice_2.pdf
PDF • 3.86 MB
BOQ_2105649.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid