Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.4 LAccepted-AOC OPP KIRYAPA PARK NATIONAL HIGHWAY ROAD BARAMULLA J K 193101 | NA | NA | 193101 | L1 | Accepted-AOC Awarded being lowest bidder as per NIT | |
| 2 | L2₹17.0 L+₹1.5 L (9.93%)Rejected-Finance | L2 | Rejected-Finance Rejected being L2 bidder | |
| 3 | L3₹25.4 L+₹9.9 L (64.3%)Rejected-Finance INDEX NO E 174 HQ 133 WE R O NEW COLONY VIZER WAGOORA BARAMULLA KASHMIR J K 193103 | BARAMULLA | JAMMU AND KASHMIR | 193103 | L3 | Rejected-Finance Rejected being L3 bidder |
| Sl No | Description | Qty | Unit | M/S MUSHTAQ AHMAD BHAT L3 | M/S GHULAM RASOOL LONE L1 | M/S Noor Mohammad Shalla L2 |
|---|---|---|---|---|---|---|
| 1.00 | Painting of transformers/ stabilisers/ AVRs/ VCB panel set/ OCB Panel Set of any capacity after cleaning the body surface of transformer by rubbing with emery Paper and acetone to remove oil stains, dust etc and applying one coat of synthetic enamel paint (colour to be decided by MES) by spray painting including writing SM No/MES No, capacity of transformer, OCB panel all as directed by Engineer-in-Charge. | 60 | Each Job | 1,100 ₹66,000 | 1,500 ₹90,000 | 900 ₹54,000 Lowest |
| 2.00 | Repair/maintenance and servicing of step down transformer 11 KV/433 Volt of capacities 100 to 250 KVA, of any make, Installed at different locations of AOR comprising following work services :-
(a) Disconnecting carefully of cable end termination of HT & LT side.
(b) Opening of top cover by removing nuts, bolts and all mounting accessories and conservator tanks.
(c) Draining out transformer oil and keeping aside in barrel for re-use and then again pouring back after necessary filtration and dehydration including top up with new transformer oil to make up the reduced quantity.
(d) Renewal of top gaskets.
(e) Servicing of tap changing gears by cleaning and polishing tapping contact points.
(f) Labour only for cleaning of bush and stud both HT/LT side and refixing the same with new cock sheet as required.
(g) Renewing unserviceable stud and bush as required as directed by engineer-in-Charge.
(h) Reconnecting of all cable terminals HV & LV sides and refixing the top cover after renewal of gaskets, conservator tank in position. | 10 | Each Job | 12,000 ₹1,20,000 | 5,000 ₹50,000 Lowest | 6,000 ₹60,000 |
| 2.01(j) Cleaning and heating of silica gel in breather and renewing with new silica gel to make up the reduced quantity. (k) Connecting HT & LT side with existing incoming and outgoing cables including reconnection of earth strip/lead. (l) Provision of a functional transformer of same or higher capacity while the transformer is taken for repair. (m) Any transportation of the transformer to and from the location of installation to the contractors workshop, including installation back as specified by engineer in charge. Note : (i) Spare parts not mentioned above (if required) will be measured and paid separately. (ii) New transformer oil (if required for topping up) will be measured and paid separately. (iii) De-hydration of existing transformer oil for refilling will be measured and paid separately. (iv) The transformers have to be taken for repair and a renewal transformer of same or higher capacity to be placed within 48 hrs from intimation in phone/ through whatsapp, irrespective of any weather issues. For this purpose, the contractor has to submit a dedicated Contact Number and whatsapp number shall be available 24X7. Any delay beyond this time will be fined at the rate of Rs. 1000 per day per transformer. | ||||||
| 3.00 | -Ditto- all as per item No 02 here-in -before but for auxiliary HT transformer & 11 KV/433 Volts transformer of capacities 40 to 160 KVA. | 5 | Each Job | 11,000 ₹55,000 | 5,000 ₹25,000 | 4,000 ₹20,000 Lowest |
| 4.00 | -Ditto- all as per item No 02 here-in -before but for HT transformer of capacities 1600 KVA (renewal transformer not required for up to 168 hours (7 days) All other description is same as in item No 02 Note No (iv) | 1 | Each Job | 55,000 ₹55,000 | 10,000 ₹10,000 Lowest | 15,000 ₹15,000 |
| 5.00 | Supply and fixing bushing and stud complete with porcelain insulators and gasket complete for LT side (as per existing size/Model) of Transformer complete all as specified and directed. | 80 | Each | 900 ₹72,000 | 700 ₹56,000 | 200 ₹16,000 Lowest |
| 6.00 | Supply and fixing bushing and stud complete with porcelain insulator and gasket complete for HT side (as per existing size/Model) of transformer complete all as specified and directed. | 50 | Each | 950 ₹47,500 | 500 ₹25,000 | 200 ₹10,000 Lowest |
| 7.00 | Renewal of burnt/unserviceable defective HT/ LT copper coil of transformers, AVRs and Servo Voltage Stabilisers with new one made out of suitable size/ gauge of copper super enamelled wire of high quality matching with the existing impendence and insulated all as specified and directed by engineer-in-Charge.
Note :- (a) The cost of coil shall be inclusive of cost of varnish, insulating paper and other insulating materials and no extra payment will be made for the same.
(b) The cost is inclusive of disconnecting of all electrical connections and transportation of transformer from site to reputed repair workshop and back including reinstalling & reconnecting electrical connection and no extra payment will be made for the same.
(c) Standby transformer/ stabiliser/ AVR will be arranged by contractor at his own cost to avoid failure of supply on site and the capacity of transformer should be matched with repaired transformer. This standby transformer will be brought within 48 hours of intimation (either by phone or by whatsapp) of unserviceability of the original transformer (for this purpose, the contractor has to provide a dedicated Contact Number and whatsapp number shall be available 24X7. | 1,050 | KG | 1,050 ₹11,02,500 | 600 ₹6,30,000 Lowest | 705 ₹7,40,250 |
| 8.00 | Taking out old unserviceable burn out core lamination from transformer S & F new core lamination as per IS complete all as specified and directed | 40 | Kg | 300 ₹12,000 | 100 ₹4,000 | 20 ₹800 Lowest |
| 9.00 | Taking out old unserviceable gasket of transformer and supply and fix rubber gasket of suitable size complete all as specified and directed. | 25 | Each Job | 900 ₹22,500 | 300 ₹7,500 | 100 ₹2,500 Lowest |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
22 Sept 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Col N S Kulkarni, CWE
HQ 133 WORKS ENGRS, C/O 56 APO, PIN- 914133
CWEK/TOKEN-48/874 EWS/2025-26- REPAIR/ MAINTENANCE OF TRANSFORMER, MRS and HT LINE AND ALLIED WKS AT VARIOUS LOCATIONS IN THE AOR OF AGE E/M UNDER GE 874 EWS, JOB NO- TPP 2025-26 SER NO 3 OF ANNEX-VI TO APPX A
2025_MES_726951_1
CWEK/TOKEN-48/874 EWS/2025-26
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
GE 874 EWS
Class D and above and category b ii
7 documents required · 7 mandatory
₹500
GE 874 EWS
₹60,000
HQ 133 WORKS ENGRS
11 Nov 2025
21 Aug 2025
30 Sept 2025
21 Aug 2025
22 Sept 2025
4 Sept 2025
21 Aug 2025 - 28 Aug 2025
30 Aug 2025
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .