| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.6 LAccepted-AOC | L1 | Accepted-AOC Lowest rate Quated | |
| 2 | L2₹15.5 L+₹96,426.10 (6.61%)Rejected-Finance | L2 | Rejected-Finance Highest Rate Quated | |
| 3 | L3₹15.8 L+₹1.2 L (8.03%)Rejected-Finance | L3 | Rejected-Finance Highest Rate Quated | |
| 4 | L4₹17.7 L+₹3.1 L (21.5%)Rejected-Finance 6 14 ADAIKALAPURAM VANNIKONENTHAL MANUR TALUK TIRUNELVELI DISTRICT | TIRUNELVELI | TAMIL NADU | 627001 | L4 | Rejected-Finance Highest Rate Quated | |
| 5 | L5₹18.7 L+₹4.1 L (28.2%)Rejected-Finance | L5 | Rejected-Finance Highest Rate Quated |
| Sl No | Description | Qty | Unit | V SELVAM L2 | PALRAJ CONTRACTOR L4 | P MURUGAN CONTRACTOR L3 | MR.A.MADASAMY, CONTRACTOR L1 | MS.SUVETHA CONSTRUCTIONS L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Construction of Retaining wall at Devarkulam to Kannadikulam Road near Madai in Devarkulam Panchayat | ||||||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per Ss 20B | 124.8 | Cum | 208.39 ₹26,007.07 | 237.4 ₹29,627.52 | 211.16 ₹26,352.77 | 200 ₹24,960 Lowest | 250.59 ₹31,273.63 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete | 31.2 | Cum | 4,193.07 ₹1,30,823.78 | 4,776.91 ₹1,49,039.59 | 4,248.8 ₹1,32,562.56 | 4,000 ₹1,24,800 Lowest | 5,042.3 ₹1,57,319.76 |
| 4.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC colum footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc., using mild steel sheets of size 90 x 60 cm and 10 guage including conceyance of all materials to site and proper centering etc., complete. | 429 | Sqm | 432.53 ₹1,85,555.37 | 492.75 ₹2,11,389.75 | 438.27 ₹1,88,017.83 | 365 ₹1,56,585 Lowest | 520.13 ₹2,23,135.77 |
| 5.00 | Cement concrete 1:3:6mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete. | 221.33 | Cum | 4,406.37 ₹9,75,261.87 | 5,019.91 ₹11,11,056.68 | 4,464.93 ₹9,88,222.96 | 4,200 ₹9,29,586 Lowest | 5,298.8 ₹11,72,783.4 |
| 6.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 2,37,177 ₹2,37,177 | 2,70,200 ₹2,70,200 | 2,40,328 ₹2,40,328 | 2,22,468 ₹2,22,468 Lowest | 2,85,212 ₹2,85,212 |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
15 Oct 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO (B.Pt.)
Panchayat Union, Manur.
Retaining wall
2026_RDTN_706228_1
A3/3823/2026 Dist.Pt.
Open Tender
Civil Works - Others
Item Rate
180 days
Manur
Refer tender document
3 documents required · 3 mandatory
₹0
₹20,000
12 Nov 2026
21 Sept 2026
16 Oct 2026
21 Sept 2026
15 Oct 2026
21 Sept 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Retaining wall at Devarkulam to Kannadikulam Road near Madai in Devarkulam Panchayat | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per Ss 20B | 124.8 | Cum | - | - |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete | 31.2 | Cum | - | - |
| 4 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC colum footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc., using mild steel sheets of size 90 x 60 cm and 10 guage including conceyance of all materials to site and proper centering etc., complete. | 429 | Sqm | - | - |
| 5 | Cement concrete 1:3:6mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete. | 221.33 | Cum | - | - |
| 6 | GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
Tendernotice_2.pdf
PDF • 1.16 MB
BOQ_848836.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .