Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-Finance 4 9 2 ETTAYAPURAM ROAD NEAR A P C MAHALAKSHMI COLLEGE TUTICORIN 2 | L1 | Accepted-Finance BQR Conditions Satisfied | |
| 2 | L2₹2.9 L+₹27,240 (10.4%)Accepted-Finance LOCATION TAMIL NADU TN | L2 | Accepted-Finance BQR Conditions Satisfied |
Tender Value
₹2.5 L
EMD Value
₹2,500
Closing Date
11 Jun 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer Operation,TTPS
Office of the SE/Operation/TTPS
TTPS Operation Circle CAD CWPH I Unit III Overhauling of internal and external assembly and Reconditioning of CWP Internal spares 3A 3C of Unit III
2020_EB_165127_2
SE/O/TTPS/Spec.No.101/20-21
Open Tender
Miscellaneous Works
Item Rate
15 days
TTPS
As per BQR Conditions said in NIT
5 documents required · 5 mandatory
₹0
₹2,500
15 Jun 2020
3 Jun 2020
12 Jun 2020
3 Jun 2020
11 Jun 2020
3 Jun 2020
90 days
Charges for overhauling of 2 Nos. internal assembly of cooling water pump 3A & 3C. Dismantling the seal water connection top bearing cooling water suction and return line etc. decoupling the pump from motor, dismantling the internal assembly constituent parts, cleaning and through inspection of parts, renewal of worn out parts, reassembling all the pipe lines, trial running and commissioning of the pump.
Charges for overhauling of 2 Nos. external assembly 3A & 3C. Dismantling of external assembly parts one by one from the cooling water pump from which the internal assembly had already been removed through cleaning & inspection of the external assembly parts, renewing the worn out parts, and re-erection of the external assembly parts. (Spares required for the work will be supplied by TANGEDCO)
Charges for scrapping, cleaning and painting 2 coats of enamel paint or the internal assembly parts of cooling water pumps, including the cost of consumables and paint.
Charges for scrapping the mud, marine growth etc. cleaning the parts with diluted acid and painting 2 coats of enamel block paint on external assembly of C.W.Pump including the cost of paint & consumables.
Charges for reconditioning of thread portion in muff coupling assembly in C.W.P 3A . This work involves, transporting the muff coupling assembly work to repair yard fixing the muff coupling of pieces two numbers in working table with special type of fixtures, cleaning the muff coupling bolt seating thread in muff coupling with suitable tap set joining the two halves of muff coupling assembly and checking redial and axial alignment in heavy duty lathe.
Charges for removing the worn out stud bolt 8 Nos from the top shaft enclosing tube flange and removing the burs from the internal threads of shaft enclosing tube by means of tapset and checking the face out, including T&P hire charges and consumables etc.,
Charges for loading the rubber bearing holders in the lathe, removal of eccentricity or burrs forms in the inner bore of bearing holder by polishing the bore and checking the trueness of the flange faces and machining the bore if necessary, unloading the bearing holder from the lathe.
Charges towards renewal of Impeller shaft sleeves 2 Nos. by dismantling and removal of Impeller from Impeller shaft assembly by specially made jig on the Impeller. Loading the Impeller shaft along with jig in the hydraulic press. Simultaneously heating up of Impeller hub cooling Impeller shaft using dry ice, applying load by hydraulic press inch by inch, releasing the Impeller shaft continuously and separating the Impeller shaft and Impeller. Cutting and removing the worn out shaft sleeve 2 Nos. and fixing new shaft sleeve 2 Nos. on the Impeller shaft by suitably heating up the sleeves and polishing the Impeller bore and fixing the Impeller shaft, including cost of consumables like gas, dry ice, hire charges for hydraulic press and special jig etc.,
Material on Contractor’s Scope : Supply of 100 mm Rubber Bearing for Cooling Water Pump 3A & 3C.
Material on Contractor’s Scope : Supply of 85 mm Rubber Bearing for Cooling Water Pump 3A & 3C.
Material on Contractor’s Scope : Supply Muff coupling allen bolts with 1.5 mm pitch (Size : M 16 x 40 mm)
Material on Contractor’s Scope : Supply of Shaft enclosing tube S.S Bolt and Nut of size M 22 x 100 mm (Full Thread) with two washer (Thick–2 mm).
SRI VINAYAKA ENTERPRISES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .