Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.6 LAccepted-Finance | ₹3.6 L | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹3.9 LRejected-Finance | ₹3.9 L | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹4.0 LRejected-Finance | ₹4.0 L | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹4.3 LRejected-Finance | ₹4.3 L | L-4 | Rejected-Finance L-4 |
| 5 | L-5₹4.3 LRejected-Finance | ₹4.3 L | L-5 | Rejected-Finance L-5 |
| Sl No | Description | Qty | Unit | DHARAM VEER SINGH CONTRACTOR L3 | ASHISH CHOUHAN L7 | M/S Harendri Devi L1 | M/S AJAB SINGH CONTRACTOR L2 | HARVIR CHAUHAN L6 | M/S RINKU CONTRACTOR L4 | SON VIR L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Silt clearance including lift upto 1.50 mt. and lead upto 6 mt by JCB. Including cost of driver/assistant driver, POL , maintenance of machine, contractor profit, taxes etc including leveling & dressing . | 6,450 | Cum | 33.3 ₹2.1 L | 53 ₹3.4 L | 30 ₹1.9 L | 30 ₹1.9 L | 50 ₹3.2 L | 40 ₹2.6 L | 40 ₹2.6 L |
| 2.00 | Silt clearance with slush, lehal including lift upto 1.50 mt. and lead upto 6 mt. by JCB. Including cost of driver/assistant driver, POL , maintenance of machine, contractor profit, taxes etc including leveling & dressing . | 3,005 | Cum | 61 ₹1.8 L | 86 ₹2.6 L | 55 ₹1.7 L | 65 ₹2.0 L | 78 ₹2.3 L | 56 ₹1.7 L | 58 ₹1.7 L |
Updated dates
Tender Value
₹5.7 L
EMD Value
₹11,400
Closing Date
10 Feb 2026, 1:00 pmClosed
EE BDGC BSR
EE BDGC BSR
Clearance of internal section of Bajhera Drain from km. 0.000 to km. 7.240
2026_UPIDC_1110086_12
15/EE/2025-26
Open Tender
Civil Works
30 days
Bulandshahr
Please refer Tender documents.
2 documents required · 2 mandatory
₹266
₹11,400
Yes
18 Apr 2026
28 Jan 2026
10 Feb 2026
28 Jan 2026
10 Feb 2026
28 Jan 2026
Silt clearance including lift upto 1.50 mt. and lead upto 6 mt by JCB. Including cost of driver/assistant driver, POL , maintenance of machine, contractor profit, taxes etc including leveling & dressing .
Silt clearance with slush, lehal including lift upto 1.50 mt. and lead upto 6 mt. by JCB. Including cost of driver/assistant driver, POL , maintenance of machine, contractor profit, taxes etc including leveling & dressing .
stage.html
html • 0.05 MB
techsummary_2050265.pdf
finance_2050265.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.27 MB
BOQ_2050265.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid