| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹54.0 LAccepted-AOC | L-1 | Accepted-AOC ACCEPTED AS l-1 | |
| 2 | L-2₹46.6 L+₹83,510.57 (1.83%)Rejected-Finance CAMP VILLAGE DEVGAI POST KUDRI SHADOL MP PIN 484110 | SHAHDOL | MADHYA PRADESH | 484110 | L-2 | Rejected-Finance Rejected as L-2 | |
| 3 | L-3₹53.1 L+₹7.3 L (16.0%)Rejected-Finance GURHI MINUS NEAR BUS STAND POST PALACHOURAI TAHSIL JUNNARDEO DISTT CHHINDWARA 480449 MP | CHHINDWARA | MADHYA PRADESH | 480449 | L-3 | Rejected-Finance Rejected as L-3 |
Tender Value
₹78.8 L
EMD Value
₹98,600
Closing Date
12 Jun 2023, 5:00 pmClosed
Staff Officer (Mining)
Staff Officer (Mining), SECL Sohagpur Area, PO- Dhanpuri, Distt- Shahdol (MP), Mobile No.-9425533459
Transportation, installation and commissioning of main belt (1000mm) with drive head accessories in B4, B3, 14R, B37, B36,B35, B34, B33, B32, B31CM panel at Seam VIB of Khairaha UG Mine of Sohagpur Area
2023_SECL_280080_1
SECL/SGP/ET/23-24/615 dt25/05/2023
Open Tender
Civil Works - Others
Item Rate
365 days
khairaha UG Mine
As per NIT
10 documents required · 10 mandatory
₹98,600
24 Jul 2023
25 May 2023
14 Jun 2023
25 May 2023
12 Jun 2023
26 May 2023
25 May 2023 - 6 Jun 2023
Amount
Item Description/ Heading Part (A) labour Cost
Dismantling of belt structure along with PVC belt (800mm/1000mm) including cleaning stacking the same within a distance of 50m
Transportation of steel structures materials from surface to underground through haulages with tramming & pushing, coupling/uncoupling etc for a distance every 1.0 Km or part thereof including loading/unloading & stacking the same at destination. (calculation sheet enclosed).
Installation/erection of complete belt conveyor structure (1000mm/1200mm) in u/g including cleaning of site, laying & fitting stool, strangers, brackets, bottom rollers, top rollers, pull card switches etc complete.
Transportation of PVC belt (1000/1200mm) from surface to u/g or one section to other section in u/g through haulages with tramming, pushing, coupling/uncoupling etc for a distance every 1.0 Km or part thereof including loading, unloading & stacking the same at destination.(3600 x 02 = 7200 mtr.).
Placing of PVC belt (1000/1200mm) on conveyor structures in u/g including jointing of belt and aligning of belt conveyor. (3200 x 02 = 6400 mtr.)
Installation of tail end drum of belt conveyor (800/1000mm) with drum base tail end safety guard, side plates/loading bracket (chute), decking plates etc in u/g (1st time) including dismantling & carrying/transporting from other section through haulages/pushing manually
Shifting of tail end drum of belt conveyor (800/1000mm with drum base tail end safety guard, side plates/loading bracket (chute), decking plates etc in u/g (1st time) including dismantling, carrying , from one place to other place in same section/district within a lead of 50m. 5100 – (51 x 3) = 4947/ 51 = 97 Say 60 Shifting
General cleaning/house keeping not exceeding 5cm in depth including disposal of cleaned muck/debris to be stacked up to 50 m. or to be levelled and neatly dressed at site of drive head installations. 15.00x6.00x 08 nos. = 720 m2
Cutting in soft stone by chisel & hammer for digging of pits of foundation work- a) for drive head- (4.00x0.50x1) x 02 nos. = 4.00 m3 x 08 Set = 32.00m3 b) for discharge - (0.40x0.40x1) x 04 nos. = 0.64 m3 x 08 Set = 5.12 m3 c) for Loop Take up- (0.40x0.40x1) x 04 nos. = 0.64 m3 x 08 Set = 5.12 m3 Total = 42.24 m3
Cement concrete/PCC (1:2:4) in foundation/plinth/ flooring/wall (any thickness) in u/g (Excluding centring, shuttering and cost of CC materials) a) for drive head- (4.00x0.50x1) x 02 nos. = 4.00 m3 x 08 Set = 32.00m3 b) for discharge - (0.40x0.40x1) x 04 nos. = 0.64 m3 x 08 Set = 5.12 m3 c) for Loop Take up- (0.40x0.40x1) x 04 nos. = 0.64 m3 x 08 Set = 5.12 m3 Total = 42.24 m3
Loading of all kind of building materials in to tubs at incline/Pit mouth on surface with lead of 50m.
Transportation of all kind of building material from surface to u/g through haulages with tramming and pushing, coupling /uncoupling etc for a distance every 1.0 Km or part there of and bringing the empty tubs to surface. (calculation sheet enclosed
Unloading of all kind of building materials from tubs at destination in u/g and stacking the same
Dismantling and transporting of 1000mm drive head (Double drive drum) with loop take up and all accessories (like as motor, gearbox, drive drum, girders, frame, chute & side plates etc) with lead of 100m/ up to track end.
Installation of 1000 mm drive head (double drive drum) with loop take-up & all accessories (like as motor, gearbox, drive drum, girders, frame, chute& side plates etc) including carrying manually from end of track in u/g and assembling the same as per instruction of Exe. In-charge
Part-B Material Cost (As per market Analysis Rate) Supply & stacking of materials at Bangwar UG Mine. Cement-
Stone Chips
Total impact of GST for the purpose of CTC
RAVI KUMAR JAISWAL
B AND B GROUP
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .