Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 LAdmitted-Finance | ₹10.8 L | L1 | Admitted-Finance |
| 2 | L2₹11.4 LAdmitted-Finance VILLAGE HARRO P O ROURI TEHSIL DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹11.4 L | L2 | Admitted-Finance |
| 3 | L3₹11.7 LAdmitted-Finance | ₹11.7 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Parmod Kumar Sharma L2 | Bilal Ahmed L3 | VEENESH THAKUR L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Hard Roack blasting prohibited and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site, according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at approved dumping site Bharyal. including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required).All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation the usefull stones as per the direction of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 36.3 | P.Cum | 300 ₹10,890 | 650 ₹23,595 | 345 ₹12,523.50 |
| 2.00 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 143 | P.sqm | 400 ₹57,200 | 700 ₹1.0 L | 450 ₹64,350 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 1.39 | P.cum | 4,200 ₹5,838 | 6,300 ₹8,757 | 4,825 ₹6,706.75 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size)including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 138.27 | P.Cum | 7,200 ₹10.0 L | 6,800 ₹9.4 L | 6,650 ₹9.2 L |
| 5.00 | Stone filling behind retaining walls & B/wall including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 35.9 | P.Cum | 1,900 ₹68,210 | 2,600 ₹93,340 | 2,120 ₹76,108 |
| 6.00 | P/L 100 mm dia PVC pipe for weep holes including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 14.93 | P Rmt | 180 ₹2,687.40 | 300 ₹4,479 | 170 ₹2,538.10 |
Tender Value
₹10.6 L
EMD Value
₹21,100
Closing Date
19 May 2026, 5:00 pmClosed
Executive Engineer RB MC Shimla
Executive Engineer RB MC Shimla
Restoration of rain damages SH C O Protection Wall at Panjari KH No 556 Ward No 10 Tutikandi
2026_MC_135323_21
1055dated07052026
Open Tender
Civil Works
90 days
SHIMLA
Please refer to tender documents
7 documents required · 7 mandatory
₹590
Executive Engineer R B MC Shimla
₹21,100
5 Jun 2026
13 May 2026
20 May 2026
13 May 2026
19 May 2026
13 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Hard Roack blasting prohibited and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site, according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at approved dumping site Bharyal. including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required).All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation the usefull stones as per the direction of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 36.3 | P.Cum | 100 | ₹3,630 |
| 2 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 143 | P.sqm | 101 | ₹14,443 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 1.39 | P.cum | 102 | ₹141.78 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size)including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 138.27 | P.Cum | 103 | ₹14,241.81 |
| 5 | Stone filling behind retaining walls & B/wall including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 35.9 | P.Cum | 104 | ₹3,733.6 |
| 6 | P/L 100 mm dia PVC pipe for weep holes including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 14.93 | P Rmt | 105 | ₹1,567.65 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.22 MB
Tendernotice_2.pdf
PDF • 0.70 MB
Tendernotice_3.pdf
PDF • 0.35 MB
BOQ_200475.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid