| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹26.0 CrAccepted-AOC 1077 SECTOR 16 AND 17 125001 | HISAR | HISAR | HARYANA | 125001 | ₹26.0 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹27.5 CrRejected-AOC 1391 SECTOR 57 PART II 122003 | GURUGRAM | HARYANA | 122003 | ₹27.5 Cr | 2 | Rejected-AOC L2 |
| 3 | 3₹27.7 CrRejected-AOC 1506 SECTOR 16 17 HISAR SECTOR 16 17 HISAR 125001 | HISAR | HISAR | HARYANA | 125001 | ₹27.7 Cr | 3 | Rejected-AOC L3 |
| 4 | 4₹29.3 CrRejected-AOC | ₹29.3 Cr | 4 | Rejected-AOC L4 |
| 5 | 5₹30.3 CrRejected-AOC | ₹30.3 Cr | 5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | R K JAIN INFRA PROJECTS PRIVATE LIMITED L6 | M/s Hisar Construction Company L1 | SHIVA BUILD TECH PRIVATE LIMITED L4 | Sarvodya Infracon Ptd. Ltd. L10 | kartarsinghcontractor L7 | MAHENDER SINGH CONTRACTOR L3 | M/s K.K. Construction Company L5 | M/s Suraj Construction Company L12 | S S BUILDERS L8 | Narender Singh Contractor L11 | JS SYNERGIES PRIVATE LIMITED L2 | M/S SKS NIRMAN VAANIJAY PVT LTD L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 1,281.9 | cum | 1,392 ₹17.8 L | 1,000 ₹12.8 L | 1,360 ₹17.4 L | 1,700 ₹21.8 L | 1,250 ₹16.0 L | 1,200 ₹15.4 L | 1,430 ₹18.3 L | 1,714 ₹22.0 L | 1,537 ₹19.7 L | 1,600 ₹20.5 L | 1,261 ₹16.2 L | 1,564 ₹20.0 L |
| 2.00 | [10.30.2]Providing and laying of chequered precast cement concrete tiles 22 mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). 2. Medium shade pigment using 50% white cement 50% Grey cement [Through Rate] | 111.3 | Sqm | 563 ₹62,661.90 | 650 ₹72,345 | 550 ₹61,215 | 750 ₹83,475 | 690 ₹76,797 | 500 ₹55,650 | 579 ₹64,442.70 | 694 ₹77,242.20 | 622 ₹69,228.60 | 650 ₹72,345 | 500 ₹55,650 | 700 ₹77,910 |
| 3.00 | [10.30.4]Providing and laying of chequered precast cement concrete tiles 22 mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). 4. Ordinary cement without any pigment [Through Rate] | 2,400 | Sqm | 395 ₹9.5 L | 500 ₹12 L | 386 ₹9.3 L | 530 ₹12.7 L | 490 ₹11.8 L | 380 ₹9.1 L | 406 ₹9.7 L | 487 ₹11.7 L | 436 ₹10.5 L | 500 ₹12 L | 358 ₹8.6 L | 490 ₹11.8 L |
| 4.00 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | 24.3 | Sqm | 63 ₹1,530.90 | 100 ₹2,430 | 61 ₹1,482.30 | 85 ₹2,065.50 | 82 ₹1,992.60 | 65 ₹1,579.50 | 64 ₹1,555.20 | 77 ₹1,871.10 | 69 ₹1,676.70 | 80 ₹1,944 | 50 ₹1,215 | 80 ₹1,944 |
| 5.00 | [11.67.1]Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : 1. Water thinnable cement primer [Through Rate] | 1,800 | Sqm | 16 ₹28,800 | 20 ₹36,000 | 16 ₹28,800 | 20 ₹36,000 | 15 ₹27,000 | 16 ₹28,800 | 17 ₹30,600 | 20 ₹36,000 | 18 ₹32,400 | 20 ₹36,000 | 10 ₹18,000 | 22 ₹39,600 |
| 6.00 | [11.94.1]Finishing walls with textured exterior paint of required shade : 1. New work (Two or more coats applied @ 3.28 litre/10 sqm) over and including priming coat of exterior primer applied @ 2.20kg/10 sqm [Through Rate] | 1,800 | Sqm | 102 ₹1.8 L | 130 ₹2.3 L | 100 ₹1.8 L | 135 ₹2.4 L | 120 ₹2.2 L | 95 ₹1.7 L | 104 ₹1.9 L | 125 ₹2.3 L | 112 ₹2.0 L | 120 ₹2.2 L | 89 ₹1.6 L | 110 ₹2.0 L |
| 7.00 | [13.1.1]Providing and fixing T-iron frames for doors, windows and ventilators of mild steel Tee-sections, joints mitred and welded, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer. 1. Fixing with 15x3 mm lugs 10 cm long embedded in cement concrete block 15x10x10 cm of C.C. 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). [Through Rate] | 1,55,376 | Kg. | 59 ₹91.7 L | 60 ₹93.2 L | 58 ₹90.1 L | 79 ₹1.2 Cr | 81 ₹1.3 Cr | 56 ₹87.0 L | 61 ₹94.8 L | 73 ₹1.1 Cr | 65 ₹1.0 Cr | 75 ₹1.2 Cr | 51 ₹79.2 L | 65 ₹1.0 Cr |
| 8.00 | [13.42.3]Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. 3. G.I. pipes [Through Rate] | 1,301.43 | Kg. | 78 ₹1.0 L | 100 ₹1.3 L | 77 ₹1.0 L | 105 ₹1.4 L | 99 ₹1.3 L | 75 ₹97,607.25 | 81 ₹1.1 L | 97 ₹1.3 L | 67 ₹87,195.81 | 100 ₹1.3 L | 60 ₹78,085.80 | 110 ₹1.4 L |
| 9.00 | [15.1.2.1]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications
Ordinary soil 2.1. Mechanical Means
Depth up to 3 m [Through Rate] | 2,923.1 | cum | 59 ₹1.7 L | 50 ₹1.5 L | 58 ₹1.7 L | 79 ₹2.3 L | 38 ₹1.1 L | 50 ₹1.5 L | 61 ₹1.8 L | 73 ₹2.1 L | 65 ₹1.9 L | 80 ₹2.3 L | 52 ₹1.5 L | 50 ₹1.5 L |
| 10.00 | [15.26.1]Sand Filling and Water Filling of Wells 1. Sand Filling in Wells complete as per Drawing and Technical Specifications MORT&H clause 1207 [Through Rate] | 11.13 | cum | 721 ₹8,024.73 | 400 ₹4,452 | 704 ₹7,835.52 | 900 ₹10,017 | 550 ₹6,121.50 | 550 ₹6,121.50 | 741 ₹8,247.33 | 888 ₹9,883.44 | 796 ₹8,859.48 | 800 ₹8,904 | 600 ₹6,678 | 880 ₹9,794.40 |
Tender Value
₹40.3 Cr
EMD Value
₹80.5 L
Closing Date
3 Feb 2025, 5:00 pmClosed
KRISHAN KUMAR
PD Charkhi Dadri
Widening and Strengthening of Dadri -Chirya road (Road ID 2440) (MDR -124) from km 30.55 to 48.57 under Provincial Division PWD BandR Br, Ch. Dadri in Dadri Distt
2025_HRY_423369_1
2025CCDABFC7 00C1 49C6 A74F 08F5E621AF3D613BAR
Open Tender
Civil Works
400 days
BALKARA CHARKHI KAPOORI MAKRANA MAKRANI MORI
As per CBD
2 documents required · 2 mandatory
₹50,000
₹80.5 L
Yes
30 Oct 2025
13 Jan 2025
4 Feb 2025
13 Jan 2025
3 Feb 2025
13 Jan 2025
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB