| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 LAccepted-AOC | ₹8.9 L | L1 | Accepted-AOC less |
| 2 | L2₹8.9 LRejected-AOC | ₹8.9 L | L2 | Rejected-AOC more value |
| Sl No | Description | Qty | Unit | Ramar Selvakumar L1 | T.Thennavan L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with in initial lead of 10 mand initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 19.22 | cum | 263.5 ₹5,064.47 | 264 ₹5,074.08 |
| 2.00 | Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete | 5.4 | SQM | 6,280 ₹33,912 | 6,281 ₹33,917.40 |
| 3.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 5.49 | NO | 362.5 ₹1,990.13 | 363 ₹1,992.87 |
| 4.00 | Brick work in cement Mortor 1:5 (One cement and five sand) using second class Bricks of size 23 x 11.5 x 7.5 cms for the following including mixing mortar and all other labour charges etc complete. | 13.24 | NO | 6,269 ₹83,001.56 | 6,270.1 ₹83,016.12 |
| 5.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | 21.74 | NO | 547 ₹11,891.78 | 548 ₹11,913.52 |
| 6.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) ABOVE GL | 75.34 | SQM | 1,094.5 ₹82,459.63 | 1,096 ₹82,572.64 |
| 7.00 | R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete | 12.98 | CUM | 10,028.5 ₹1.3 L | 10,029.2 ₹1.3 L |
| 8.00 | Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor. | 1.4 | CUM | 91,957 ₹1.3 L | 91,957.9 ₹1.3 L |
| 9.00 | Providing granolithic floor finish of the 50mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 32.25 | SQM | 362.5 ₹11,690.63 | 363 ₹11,706.75 |
| 10.00 | Providing and Applying CFTRI approved two component flexible polymer modified acrylic cementitious waterproofing coating with a mix ratio of (1 Liquid: 2 Powder), to the RCC surface like bathroom, toilet, balcony & utility area applied @ 1.7kg/m2 in 2 coats to achieve 1mm DFT, having Elongation at break >50% as per ASTM D 412, Tensile strength >1N/ mm2 as per ASTM D 412, Adhesion strength: 0.80 N/mm2 as per ASTM D 4541, crack bridging upto 1mm as per ASTM C 836, Water penetration (5 bar pressure) as per BS EN 12390. The finished cost to include surface preparation, making coving of 50 mm X 50mm at all right angles of wall Junction with Polymer Repair Mortar and lay 45 gsm glass fibre mesh over the angle fillet when the first coat in still wet, treatment of cracks completely as per | 32.25 | SQM | 375.5 ₹12,109.88 | 377 ₹12,158.25 |
Updated dates
Tender Value
₹9 L
EMD Value
₹9,000
Closing Date
27 Nov 2025, 4:00 pmClosed
BDO BP SRIMUSHNAM
BDO Srimushnam
Construction of PD Shop at Pudaiyur Pt in Srimushnam Block
2025_RDTN_624011_1
A3/1048/2025 MLACDS 2025-26
Open Tender
Civil Works
180 days
Srimushnam
as per tender
3 documents required · 3 mandatory
₹0
₹9,000
7 Jan 2026
17 Nov 2025
27 Nov 2025
17 Nov 2025
27 Nov 2025
17 Nov 2025
17 Nov 2025 - 17 Nov 2025
Amount
Earth work excavation and depositing on bank with in initial lead of 10 mand initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Brick work in cement Mortor 1:5 (One cement and five sand) using second class Bricks of size 23 x 11.5 x 7.5 cms for the following including mixing mortar and all other labour charges etc complete.
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) ABOVE GL
R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Providing granolithic floor finish of the 50mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Providing and Applying CFTRI approved two component flexible polymer modified acrylic cementitious waterproofing coating with a mix ratio of (1 Liquid: 2 Powder), to the RCC surface like bathroom, toilet, balcony & utility area applied @ 1.7kg/m2 in 2 coats to achieve 1mm DFT, having Elongation at break >50% as per ASTM D 412, Tensile strength >1N/ mm2 as per ASTM D 412, Adhesion strength: 0.80 N/mm2 as per ASTM D 4541, crack bridging upto 1mm as per ASTM C 836, Water penetration (5 bar pressure) as per BS EN 12390. The finished cost to include surface preparation, making coving of 50 mm X 50mm at all right angles of wall Junction with Polymer Repair Mortar and lay 45 gsm glass fibre mesh over the angle fillet when the first coat in still wet, treatment of cracks completely as per
Plastering with Cement Mortar 1:5 (One Cement and Three Plastering M.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty should be got approved by the Executive Engineer before use on work. (Based on SoR 2023-24)
Plastering with C. M 1:5 mix, 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing of walls with colour glazed tiles of size 300x200x6 mm of best quality including cost and conveyance of all materials to site and all labour charges etc complete.
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats using ready mixed Plastic Emulsion paint inlcuding priming coat and cost and conveyance of paint and all labour charges etc complete
Painting two coats over new iron work using synthetic enamal paint including cost and conveyance of all materials to site etc complete
Towards the supply of steel Doors and Windows including all labour charges Door 1.00x2.10m
Doorf 2 -0.90x2.10m
Window 0.90x1.30m
Ventilater 1.20x0.60m
Ventilater 0.90x0.60m
Towards the labour charges for fixing steel Doors in position etc complete
Towards the labour charges for fixing steel Windows and Ventilators in position etc complete
Supplying and errecting pull and push type rolling shutter with ISI make of approved size and section using 18GI sheet. The shutter shall be painted with one coat of red oxide primer and the rate is inclusive of hood covers , transportation charges etc., Gear operatied type (from 8sqm to 12sqm area)
Towards labour charges for Fixing of Rolling shutters including all charges etc., all complete
Labour wrought and put up in position Frames, shutters for swing ventilators and fixed in position in accordance with standard drawings and standard specification
Towards cost and supply of IWCincluding cost and conveyance of all materials to site and all labour charges etc complete.
supplying and fixing of cuddapah slab 50mm thick including all charges etc., all complete
supplying and fixing of Rain water harvesting pipe including all charges etc., all complete
Provision for electrification items including all cost and conveyance etc., all complete Light point SD no18
Fan point SD no 18
S & F of fan SD 110
Plug point SD 36
Tube light fiitings SD 88
CFL SD no 80
DPIC switch 500V SD 142
Service pipe SD no 70
Service connection SD no 65
BHF with CFL SD no 83
RCC Rings
RCC Cover Slab
Provision for Water supply arrangements 500ltr HDPE Tank
32mm PVC Pipe
32mm PVC Bend
25mm PVC Pipe
25mm PVC Elbow
25mm PVC Tee
Pvc Tap
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
T.Thennavan (BID ID -1521539)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
1.pdf
Tender Documents • 0.44 MB
BOQ_746153.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid