Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.2 L+₹44.85 (0.02%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.2 L+₹67.27 (0.03%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹2.2 L
EMD Value
₹4,480
Closing Date
12 Aug 2026, 6:00 pmClosed
xen rew udhampur
xen rew udhampur
boq
2026_RDPR_316695_20
e-NIT No. 60 REW UDHAMPUR of 2026-27 Dated 18-07-2026
Open Tender
Civil Works
Percentage
30 days
udhampur
nit
2 documents required · 2 mandatory
₹600
xen rew udhampur
₹4,480
Yes
29 Aug 2026
20 Jul 2026
13 Aug 2026
20 Jul 2026
12 Aug 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART 1 Earh Work in Excavation by manual means in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.100% in All kinds of soil. | 29.31 | cum | 479.3 | ₹14,048.28 |
| 2 | Providing and lying in position 1:5:10 mix of crushed stone aggregates 40mm size. | 2.34 | cum | 4,826.5 | ₹11,294.01 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 MIX. | 12.21 | cum | 5,733.6 | ₹70,007.26 |
| 4 | Cetring and shuttering including strutting, propping etc and removal of the formwork. | 53.44 | cum | 286.35 | ₹15,302.54 |
| 5 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 32.06 | sqm | 416.5 | ₹13,352.99 |
| 6 | Carriage of construction material sand | 7.19 | cum | 520.34 | ₹3,741.24 |
| 7 | Carriage of construction material aggregate | 14.38 | cum | 520.34 | ₹7,482.49 |
| 8 | PART 2 Reinforced cement concrete work in beams, suspended floors, roofs excluding cost of centring, shuttering, finishing and reinforcement.1 cement: 1.5 coarse sand :3 graded stone aggregates 20mm nominal size. | 2.21 | cum | 8,953.95 | ₹19,788.23 |
| 9 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . | 188.07 | KG | 123.2 | ₹23,170.22 |
| 10 | Cetring and shuttering including strutting, propping etc and removal of the formwork. | 11.25 | sqm | 718.2 | ₹8,079.75 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_1034397.xls
BOQ • 0.30 MB
ExtensionN.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .