| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.6 CrAdmitted-Finance | ₹67.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹77.4 Cr+₹9.8 Cr (14.4%)Admitted-Finance | ₹77.4 Cr+₹9.8 Cr (14.4%) | L2 | Admitted-Finance |
| 3 | L3₹89.2 Cr+₹21.6 Cr (31.9%)Admitted-Finance | ₹89.2 Cr+₹21.6 Cr (31.9%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | NANJING KANGNI MECHANICAL & ELECTRICAL COMPANY LIMITED L3 | ST Engineering Electronics Ltd L1 | KTK GROUP CO., LTD L2 |
|---|---|---|---|---|---|---|
| 1.00C4-ASA-10A | ||||||
| 1.01 | Indian Rupees | 1 | Nos | 21,60,60,643.2 ₹21,60,60,643.2 Lowest | 40,06,15,410 ₹40,06,15,410 | 32,60,17,601 ₹32,60,17,601 |
| 1.02 | Foreign Currency 1 | 1 | Nos | 57,68,16,397.93 ₹57,68,16,397.93 | 24,79,58,202.13 ₹24,79,58,202.13 Lowest | 40,22,56,000.76 ₹40,22,56,000.76 |
| 1.03 | Foreign Currency 2 | 1 | Nos | - | - | - |
Tender Value
Refer Docs
EMD Value
₹1.2 Cr
Closing Date
2 Sept 2024, 1:00 pmClosed
Director Systems and Operations CMRL
CMRL
Design, Manufacture, Supply, Installation, Testing Commissioning of Platform Screen Doors for CMRL Phase II Light House Metro to Alapakkam Metro of Corridor 4
2024_CMRL_816865_1
CMRL-PHASEII-SYS-C4ASA10A-2024
Global Tenders
Miscellaneous Works
Lump-sum
730 days
Chennai
Please refer bid documents
7 documents required · 7 mandatory
₹40,000
CMRL Bank Account
₹1.2 Cr
5 Nov 2024
17 Jul 2024
3 Sept 2024
17 Jul 2024
2 Sept 2024
14 Aug 2024
17 Jul 2024 - 31 Jul 2024
C4-ASA-10A
Indian Rupees
Foreign Currency 1
Foreign Currency 2
Description of Work / Item(s)
Training, Operation & Maintenance Manual and Maintenance Assistance
Cost for instructor week for imparting training to Employer’s Technical Personnel, in Chennai
Cost for instructor week for imparting training to Employer’s Technical Personnel, in Chennai
Cost for instructor week for imparting training to Employer’s Technical Personnel, in Chennai
Cost for instructor week for imparting training to Employer’s Technical Personnel, in off-shore locations
Cost for instructor week for imparting training to Employer’s Technical Personnel, in off-shore locations
Cost for instructor week for imparting training to Employer’s Technical Personnel, in off-shore locations
Cost for instructor week for Imparting training to Employer’s operating personnel, in Chennai
Cost for instructor week for Imparting training to Employer’s operating personnel, in Chennai
Cost for instructor week for Imparting training to Employer’s operating personnel, in Chennai
Delivery & commissioning of Computer based training systems at Chennai, as stipulated in Part 2 Employer’s requirement.
Delivery & commissioning of Computer based training systems at Chennai, as stipulated in Part 2 – Employer’s requirement.
Delivery & commissioning of Computer based training systems at Chennai, as stipulated in Part 2 – Employer’s requirement.
Operating & Maintenance Manuals (Draft as well as Final, in required copies)
Operating & Maintenance Manuals (Draft as well as Final, in required copies)
Operating & Maintenance Manuals (Draft as well as Final, in required copies)
Cost for deputing Supervisory experts in various sub-systems of Signaling for on-the-job training, supervise maintenance & trouble-shooting, as per Employer’s requirements
Cost for deputing Supervisory experts in various sub-systems of Signaling for on-the-job training, supervise maintenance & trouble-shooting, as per Employer’s requirements
Cost for deputing Supervisory experts in various sub-systems of Signaling for on-the-job training, supervise maintenance & trouble-shooting, as per Employer’s requirements
Description of Work / Item(s)
Contract Spares, Special tools, Testing Equipments, Measuring Instruments and Furniture
Contract Spares as per final list of Spares on completion of detailed design (with Notice of No objection from the Engineer)
Contract Spares as per final list of Spares on completion of detailed design (with Notice of No objection from the Engineer)
Contract Spares as per final list of Spares on completion of detailed design (with Notice of No objection from the Engineer)
Contract Tools, Testing Equipments & Measuring instruments as per final list of Tools, Testing Equipments and measuring instruments, on completion of detailed design (with Notice of No objection from the Engineer)
Contract Tools, Testing Equipments & Measuring instruments as per final list of Tools, Testing Equipments and measuring instruments, on completion of detailed design (with Notice of No objection from the Engineer)
Contract Tools, Testing Equipments & Measuring instruments as per final list of Tools, Testing Equipments and measuring instruments, on completion of detailed design (with Notice of No objection from the Engineer)
Furniture for various Control & Equipment Rooms, as per Employer’s requirements
Furniture for various Control & Equipment Rooms, as per Employer’s requirements
Furniture for various Control & Equipment Rooms, as per Employer’s requirements
KTK GROUP CO., LTD
NANJING KANGNI MECHANICAL & ELECTRICAL COMPANY LIMITED
KTK GROUP CO., LTD
NANJING KANGNI MECHANICAL & ELECTRICAL COMPANY LIMITED
KTK GROUP CO., LTD
NANJING KANGNI MECHANICAL & ELECTRICAL COMPANY LIMITED
US Dollar
European Euro
Portion of Quoted Rate in Currency
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
European Euro
Portion of Quoted Rate in Currency
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
148397976.pdf
Tender Document • 0.36 MB
148397977.html
Tender Document • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .