The Project Director
The Project Director DRDA,Vellore
Renovation of 3 no of Ponds Ooranies,Kulam Kuttai in Alangayam Block of Vellore District under Renovation of Rural Water Bodies SFC Grant 2019-20 Package no-38
2020_RDTN_158362_1
A9/3844/2020
Open Tender
Civil Works - Others
Item Rate
180 days
DRDA
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹43,000
6 Jun 2020
19 Feb 2020
2 Jun 2020
19 Feb 2020
2 Jun 2020
19 Feb 2020
Amount
ALANGAYAM BLOCK P-38 3Nos. Works
1. Improvements to Kanathukullai pond l Survey no:95/4B2 in Girisamuthiram Panchayat
Clearing Juliflora Jungle without alignment of wild vegetation , bushes ,shrubs, saplings and trees of girth up to 300m for the stregthening of the fund and the Ground shall be left in perpectly clean condition etc .complete
Earth work in all soils except Hard rock requiring blastering and conveying for formation of bund with lead of 0 to100m deploying earth moving machinery and tippers including benching foemation of bunds breaking clods and sectioning etc., complete
Earth work depoying earth moving machenery for desilting channel and forming bund on either side and depositing the earth on banks including cost and conveyance etc
Construction of bathing ghats
Earth work excavation in all clases of soils as stiff clay,hard gravelly soil as per ss20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits to concrete works including cost and conveyance of all materials to work site and all labour charges etc complete
Plain Cement Concrete 1:3:6 mix using 40 mm ISS sine HBG metal including cost and conveyance of all materials and all labour charges etc complete.
Brick work in cm 1:5 mix using country bricks including cost and conveyance etc, complete.
Plastering with cm 1:5 mix using including cost and conveyance etc
Construction of Baby pond
Earth work excavation in all clases of soils as stiff clay,hard gravelly soil as per ss20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits to concrete works including cost and conveyance of all materials to work site and all labour charges etc complete
Plain Cement Concrete 1:3:6 mix using 40 mm ISS sine HBG metal including cost and conveyance of all materials and all labour charges etc complete.
construction of silt trap
Earth work excavation in all clases of soils as stiff clay,hard gravelly soil as per ss20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits to concrete works including cost and conveyance of all materials to work site and all labour charges etc complete
Plain Cement Concrete 1:2:4 mix using 20 mm ISS sine HBG metal including cost and conveyance of all materials and all labour charges etc complete.
Provision for Name Board
Provision for Photographic charges
2.Improvements to Thamathambal kuttai survey no 208 in Madhanacheri panhayat
Clearing Juliflora Jungle without alignment of wild vegetation , bushes ,shrubs, saplings and trees of girth up to 300m for the stregthening of the fund and the Ground shall be left in perpectly clean condition etc .complete
Earth work in all soils except Hard rock requiring blastering and conveying for formation of bund with lead of 0 to100m deploying earth moving machinery and tippers including benching foemation of bunds breaking clods and sectioning etc., complete
Earth work depoying earth moving machenery for desilting channel and forming bund on either side and depositing the earth on banks including cost and conveyance etc
Construction of bathing ghats
Earth work excavation in all clases of soils as stiff clay,hard gravelly soil as per ss20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits to concrete works including cost and conveyance of all materials to work site and all labour charges etc complete
Plain Cement Concrete 1:3:6 mix using 40 mm ISS sine HBG metal including cost and conveyance of all materials and all labour charges etc complete.
Brick work in cm 1:5 mix using country bricks including cost and conveyance etc, complete.
Plastering with cm 1:5 mix using including cost and conveyance etc
Construction of Baby pond
Earth work excavation in all clases of soils as stiff clay,hard gravelly soil as per ss20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits to concrete works including cost and conveyance of all materials to work site and all labour charges etc complete
Plain Cement Concrete 1:3:6 mix using 40 mm ISS sine HBG metal including cost and conveyance of all materials and all labour charges etc complete.
construction of silt trap
Earth work excavation in all clases of soils as stiff clay,hard gravelly soil as per ss20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits to concrete works including cost and conveyance of all materials to work site and all labour charges etc complete
Plain Cement Concrete 1:2:4 mix using 20 mm ISS sine HBG metal including cost and conveyance of all materials and all labour charges etc complete.
Provision for Name Board
Provision for Photographic charges
3.Improvements to Murugan kuttai survey no:174/10 in Madhanacheri panchayat.
Clearing Juliflora Jungle without alignment of wild vegetation , bushes ,shrubs, saplings and trees of girth up to 300m for the stregthening of the fund and the Ground shall be left in perpectly clean condition etc .complete
Earth work in all soils except Hard rock requiring blastering and conveying for formation of bund with lead of 0 to100m deploying earth moving machinery and tippers including benching foemation of bunds breaking clods and sectioning etc., complete
Earth work depoying earth moving machenery for desilting channel and forming bund on either side and depositing the earth on banks including cost and conveyance etc
Construction of bathing ghats
Earth work excavation in all clases of soils as stiff clay,hard gravelly soil as per ss20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits to concrete works including cost and conveyance of all materials to work site and all labour charges etc complete
Plain Cement Concrete 1:3:6 mix using 40 mm ISS sine HBG metal including cost and conveyance of all materials and all labour charges etc complete.
Brick work in cm 1:5 mix using country bricks including cost and conveyance etc, complete.
Plastering with cm 1:5 mix using including cost and conveyance etc
Construction of Baby pond
Earth work excavation in all clases of soils as stiff clay,hard gravelly soil as per ss20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits to concrete works including cost and conveyance of all materials to work site and all labour charges etc complete
Plain Cement Concrete 1:3:6 mix using 40 mm ISS sine HBG metal including cost and conveyance of all materials and all labour charges etc complete.
construction of silt trap
Earth work excavation in all clases of soils as stiff clay,hard gravelly soil as per ss20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits to concrete works including cost and conveyance of all materials to work site and all labour charges etc complete
Plain Cement Concrete 1:2:4 mix using 20 mm ISS sine HBG metal including cost and conveyance of all materials and all labour charges etc complete.
Provision for Name Board
Provision for Photographic charges
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
M.CHENNAPPAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .