| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance | L1 | Accepted-Finance Rate quoted is lowest | |
| 2 | L2₹2.0 L+₹1,830 (0.92%)Accepted-Finance | L2 | Accepted-Finance Rate quoted is second lowest | |
| 3 | L3₹2.1 L+₹7,782 (3.90%)Accepted-Finance UNKNOWN | L3 | Accepted-Finance Rate quoted is Highest | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
18 Feb 2020, 4:00 pmClosed
Superintending Engineer
SE ETC Sultanpur 400KV S/S Campus Payagipur Sultanpur
INTEGRATION OF 220KV BUS TRANSFER SYSTEM IN EXISTING 220KV BUS COUPLER BAY AT 220KV S/S SULTANPUR UNDER ELECTY. 400KV S/S DIVISION, SULTANPUR
2020_UPTCL_431972_1
S.T. T.No. 190/ETCS/2019-20
Open Tender
Electrical Works
Item Wise
30 days
Sultanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹236
SE ETC Sultanpur
₹2,000
7 Mar 2020
6 Feb 2020
19 Feb 2020
6 Feb 2020
18 Feb 2020
6 Feb 2020
6 Feb 2020 - 18 Feb 2020
Amount
PART-A (Supply)
PG Clamp (Moose to Panther)
PG Clamp (Moose to Moose)
Single tension fitting suitable for moose conductor.
PART-B (Work)
Erection of Main & Auxiliary Structure for 220 KV transfer bay extension/new equipment for new 220KV transfer Bay including shifting of material Store to site, erection as per drawing using necessary nut-bolts & washers and fabricating/ modifying holes etc if required. (a). CBT - 02 No. (b). ALP - 02 No.
Erection of 220KV equipment in switchyard including shifting, laoding/unloading of equipment from store to site along with complete accessories.
245KV Line Isolator
145KV Post Insulator for support.
Stringing of 220KV single moose transfer bus of 36mtr. Span complete along with all fitting and accessories.
Jumpering of various equipments in 220KV TBC Bay single/twin moose conductor with specified Clamps by making and jointing of proper size V-Jumpers.
2 Core x 2.5 mm2
4 Core x 2.5 mm2
10 Core x 2.5 mm2
Termination of Control Cable including cost of cable glands, lugs and ferrules complete and both end as per site and panel requirement for 220 KV Bays.
Fixing of one no. CT junction box at 160MVA T/F-III bay for bus tramsfer bay. The work including providing and fixing of steel frame and fixing of CT junction box on it. (CT junction box will be provided by the department)
Earthing of equipments and structure by MS flat including cutting, bending and welding etc. of flat and connecting it with the existing earth mat and back filling of earth as per site requirement. (M.S. Flat Provided by the contractor own his cost)
75mmX10mm
50mmX6mm
jagdish enterprises
Verma Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .