| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | L1 | Accepted-AOC Lowest rate quoted by the tenderer hence the tender is accepted. | |
| 2 | L2₹3.5 L+₹76,534.80 (27.6%)Rejected-AOC | L2 | Rejected-AOC Higher rate quoted compare to lowest tenderer quoted rate. |
Tender Value
Refer Docs
EMD Value
₹2,780
Closing Date
15 Mar 2024, 3:00 pmClosed
Executive Engineer
Office of Executive Engineer PWD South Presidency Division chepauk chennai 05
Annual Maintenance of Sewage Treatment Plant for the Engineers Quarters at Todhunter Nagar, Saidapet, Chennai-15. For the period from April 2024 to March 2025.
2024_PWD_448020_1
TNPWD/42-11/36 M/2023-2024
Open Tender
Civil Works
Lump-sum
365 days
Saidapet
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹2,780
9 Jul 2024
13 Mar 2024
15 Mar 2024
13 Mar 2024
15 Mar 2024
13 Mar 2024
Amount
Operation and maintenance of the STP for the engineers quarters at Todhunter Nagar, Saidapet with single operator (10hrs)from 8.00am to 6.00 pet as follows. The operation starts at 8.00am on every day by starting the air blower in pump room, Verifying uniform air distribution in collection and aeration tanks, by maintaining lubricating oil in the blower properly, cleaning the filter regularly. Starting the sewage feed pump to transfer the sewage water from collection tank to aeration tank, and maintaining the bacteria growth at the rate of 150ml/litre and maintaining the ph valve of 6.5 to 7.5ppm. Then maintaining clarisettler in which the sledge and water is separated and drain the sledge deposited at the bottom of tank one in 2 - 3 hrs with the help of pump for 2 minutes. The drained sledge will be deposited and dried in the drying bed. The remaining sewage water in the clarisettler will flow in to the filter feed tank with chlorine at 7ppm with the help of dosing pump, and maintaining the ph valve at the rate of 6.5 to 7.5ppm, Now the treated water in the filter feed tank will be pumped to the activated carbon filter in which to colour and odder will be -emoved and the total suspended solids will be Effluent from the filter is drained out of the STP after checking the BOD & COD levels (BOD>30pm, COD>20ppm). The carbon filter will be maintained by ackwashing with the fresh water once in 5 hours for 5 minutes to maintain the filter media in proper vel. The cost is inclusive of all miner works such as ump air lock, blower oil change, blower filter eaning, addition of necessary chlorine, and emical for maintaining the bacteria level,minor Pumping work like small leakage and miner electrical works like fusing and maintaining the pumps etc. But exclusive spare parts required while maintaining the STP.
GST at 18%
P RAJENDRAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .