| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 CrAccepted-AOC 56 LAKSHMANPUR COLONY ALLAHABAD ROAD SULTANPUR | SULTANPUR | SULTANPUR | UTTAR PRADESH | ₹8.8 Cr Quoted ₹9.0 Cr | L1 | Accepted-AOC Accept |
| 2 | L2₹9.2 Cr+₹13.7 L (1.52%)Rejected-Finance | ₹9.2 Cr+₹13.7 L (1.52%) | L2 | Rejected-Finance above |
| 3 | L3₹9.2 Cr+₹23.0 L (2.56%)Rejected-Finance | ₹9.2 Cr+₹23.0 L (2.56%) | L3 | Rejected-Finance above |
| 4 | L4₹9.3 Cr+₹29.7 L (3.30%)Rejected-Finance | ₹9.3 Cr+₹29.7 L (3.30%) | L4 | Rejected-Finance above |
| 5 | Not Admitted-Fee/PreQual/Technical 0 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹22 L
Closing Date
3 Feb 2021, 12:00 pmClosed
SE, Ayo/Ambd Circle, PWD, Ayodhya
SE, Ayo/Ambd Circle, PWD, Ayodhya
Widening and Strenthening of Mawai chaurahe to Umapur Baba Bazar via Maa Kamakhya Bhawani Mandir dhaam Marg Ch 18.800 to 28.200
2021_CEUFZ_544692_1
6232/54(I)Com-Ayo/Ambd Circle/20 Date 15.12.2020
Open Tender
Civil Works
Item Rate
270 days
SE, Ayo/Ambd Circle, PWD
Widening and Strenthening of Mawai chaurahe to Umapur Baba Bazar via Maa Kamakhya Bhawani Mandir dhaam Marg Ch 18.800 to 28.200
2 documents required · 2 mandatory
₹2,354
₹22 L
Yes
SE, Ayo/Ambd Circle, PWD, Ayodhya
7 Apr 2021
9 Jan 2021
3 Feb 2021
9 Jan 2021
3 Feb 2021
9 Jan 2021
9 Jan 2021
Amount
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, within all lifts and lead upto 30m.
Earthwork in cutting or in embankment in ordinary / moorum soil, excavation to be in the from of regular pits not exceeding 1/2 metre C 20") in depth and earthwork in embankment to be in 20cm(8) Layers including ramming and dressing the surface to required levels and slopes and also including 1.5metre (5ft) lift and 30m.(100ft) lead. The earth from cutting to be used in making embankment or to be desposited as spoil banks within 30m.(100ft) distance as directed by the Engineer-in-Charge.
Scarifying existing bituminous road surface to a depth of 50 mm and disposal of scraified material within all lifts and lead upto 1000 metres.
Construction of Granular Sub-Base by providing Close graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller to achieve the desired density, complete as per technical clause 401 For Widening
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers in uniform layer to achieve the desired density.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with 1% OPC cement+3.5 % emulsion in uniform layer to achieve the desired density.
Providing and applying tack coat with bitumen (VG-10) using Bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Over Wmm
Providing and laying bituminous concrete with hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.4% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5m. (5fts.) and lead upto 30m. (100fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-incharges upto a distance of 30m. (100 fts.) from the foundation trenches. as per MO clause 301
Plain cement concrete. 1:3:6 mix with crushed stone aggregate 40mm nominal size mechanically mixed placed in foundation and compacted vibration i/c curing 14 days.
RCC Grade M20 Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & over lapping & hooks.
Class-150 brick work in 1:3 Cement and Coarse sand of mortar in foundation and plinth including supply of all materials, labour and tools and plants,etc ,required for proper completion of the work.
Class-150 brick work in 1:3 Cement and Coarse sand of mortar in Sub Structure including supply of all materials, labour and tools and plants,etc ,required for proper completion of the work.
R.C.C. work with M-25 grade cement approved coarse sand and 2cm (3/4'') gauge approved Stone grit 20 mm size excluding supply of reinforcement and its bending but including its fixing and binding the same necessary with 24BWG binding wire and including necessary centering and shuttering etc. and also including supply of materials labour and tools and plants etc. required for proper completion of the work,
Supply & laying of 900mm dia NP3 hume pipe including fixing of collar with 1:2 cement mortar.
Supply & laying of 600mm dia NP3 hume pipe including fixing of collar with 1:2 cement mortar.
Supply & laying of 350 mm dia NP3 hume pipe including fixing of collar with 1:2 cement mortar.
Supplying and laying one layer of tar felt or any other equivalent approved material at the junction of wall and roof of any place an roof as per direction of E/I including necessaryoverlap, giving a coat of approved mastic paint belowthe Tar felt and including supply of all materials , labour and tools and plants etc.Required for propercompletion of work fix as per standard.
Supply and fixing of 10cm internal Dia Ac Down pipes required for proper completion of work in weep holes.
Pointing with cement mortor (1:3) on brick work in sub structure as per Technical Sperifications.
M/S LUCKY TRADERS
Ajay Builders
R N Contractor and Supplier
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .