Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC VIRALIKATTUVILAI MEKKAMANDAPAM P O K K DISTRICT | K K DISTRICT | TAMIL NADU | L1 | Accepted-AOC L1 |
Tender Value
Refer Docs
EMD Value
₹2,930
Closing Date
12 Feb 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE/TKY
TNEB TKY
Imp Estimate for newly proposed 63 KVA DT due to low voltage in mohideenpilai theru and reduce the existing kalimar ss 1 under colachel section in various works and various section under C I Eraniel section in Thuckalay division
2024_EB_414425_1
EE/D/TKY/ETW11/Dt.29.01.2024
Open Tender
Electrical Works
Works
90 days
o/o EE/D/TKY
As Specified Tender
3 documents required · 3 mandatory
₹0
₹2,930
25 Sept 2024
29 Jan 2024
13 Feb 2024
30 Jan 2024
12 Feb 2024
30 Jan 2024
30 Jan 2024 - 12 Feb 2024
Electrical works
Loading&unloading of all REC, RCC pole above 8 m length
Excavation of pole pits for pole above 8 m length by using JCB/Manual
Erection of RCC,REC,PSC poles above 8 m length by using crane or manual
Transportation of all types and sizes of poles and other associated materials from road side to pole pit and vice versa upto 0.50KM
Loading & Unloading of PSC pole upto 8.00 m length
Excavation of pole pit For pole upto 8.00 m length by using JCB
Erection of PSC poles upto 8.00m length by using crane
Erection of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer. (Data as per Annexure II)
Dismantling of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer. (Data as per Annexure II)
Dismantling of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa.(iii) Above 100 KVA to 250 KVA(100kva)
Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa.(iii) Above 100 KVA to 250 KVA (250Kva)
Drilling of Slotted Holes
Loading / Unloading of line materials
Erection of V X arm 3.5 feet
Erection of tapping channel cross arm
Fixing of HT/LT TI fittings
Fixing of HT pin insulator with pin 11 KV
Fixing of one Tapping cross arm per cut point upto 33 KV line including fixing of Discs,insulators and Jumpering etc..
Fixing of LTsingle phase cross arm
Dismantling and Fixing of LTsingle phase cross arm
Fixing of LT three phase cross arm
Dismantling and Fixing of LT three phase cross arm
Fixing of LT pin insulator
Dismantling and Fixing of LT pin insulator
Fixing of shackle
Dismantling and Fixing of shackle
Erection of stay set complete with fixing up stay wire Eye, Bow, Guy shackle, Binding etc
Dismantling and Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or equivalent conductor
Paving and stringing of conductors of above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35 mm ACSR or other equivalent conductor.
Paving and stringing of conductors of above 7/3.35 mm ACSR or other equivalent conductor upto 7/4.09 mm ACSR or other equivalent conductor.
Erection of 11KV single pole structure including erection of DT complete without center support
Erection of 11KV single pole structure including erection of DT complete with center support
Erection of 25KVA Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa
Erection of 63KVA Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa
Loading&unloading of Distribution Transformer upto 100KVA
For ordinary tree clearance and Throng bushes & trees.
For cocount tree clearance and Throng bushes & trees.
Erection of Street light Switching point arrangement
Dismantling and Erection of Street light Switching point arrangement
Dismantling and Erection of Single phase Service connection
Dismantling and Erection of Three phase Service connection
Dismantling and erection of 1*40W tube light in complete set
Dismantling of 8mtr RCC,REC, PSC &metal pole including the closing of the pit
Congreting with 1:4:8 mix using 40mm jelly including curing (material +labour) sleeve congreting
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .