Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.7 LAccepted-AOC 221 3 SALT LAKE SECTOR II KOLKATA 700091 | KOLKATA | KOLKATA | WEST BENGAL | 700091 | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹27.4 L+₹71,950 (2.70%)Rejected-Finance 149 5 A PILKHANA ROAD BERHAMPORE DIST MURSHIDABAD | BERHAMPORE | MURSHIDABAD | WEST BENGAL | L2 | Rejected-Finance Bid is not L1 | |
| 3 | L3₹28.5 L+₹1.8 L (6.82%)Rejected-Finance 63 PILKHANA ROAD BERHAMPORE MURSHIDABAD 742101 | BERHAMPORE | MURSHIDABAD | WEST BENGAL | 742101 | L3 | Rejected-Finance Bid is not L1 | |
| 4 | L4₹28.9 L+₹2.2 L (8.20%)Rejected-Finance 14 RAJA RAMMOHAN ROY SARANI KOLKATA 700009 | KOLKATA | KOLKATA | WEST BENGAL | 700009 | L4 | Rejected-Finance Bid is not L1 |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
12 Jul 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer PWD Howrah Electrical Division
Office of the Executive Engineer PWD Howrah Electrical Division Onkarmal Jetia Road Howrah 711103
Construction of 4 storied building for upgradation of Amta Rural Hospital to 240 bedded hospital Electrical ---SITC of UPS.
2024_WBPWD_695143_1
WBPWD/EE/HED/NIQ-01 of 2024-2025
Open Tender
MISC ELECTRICAL WORKS
Item Rate
15 days
Amta Rural Hospital to 240 bedded hospital
Please refer Tender documents.
12 documents required · 12 mandatory
₹60,000
Office of the Executive Engineer PWD Howrah Electr
6 Nov 2024
18 Jun 2024
15 Jul 2024
19 Jun 2024
12 Jul 2024
25 Jun 2024
24 Jun 2024
Amount
SITC of 30 KVA UPS including Battery Bank of (20160 ~ 24960) VAH or higher (SMF Battery 12 Volt, 42AH ~ 65AH) 3ph Input /3ph Output, Static by-pass arrangement, compitable with D.G.Set, DSP controlled IGBT based rectifier with minimum 90% efficiency on 100% Load. The UPS shall be provided with active input P.F. Correction system to obtain 0.9 lag at 100% resistive Load, Wave form - Pure sine wave, Crest Factor- 3:1 it should be capable of operating in 50°c above ambient temperature, Built in Solid State float cum boost charger with automatic boost / trickle charge mode with current Limiting features. The charger should be designed for at least 15% of the total battery current. The UPS should have current limiting protection, built in over load/ Short circuit protection with snubber circuits for current limit. Soft start arrangement, Over voltage / under voltage protection, mains ON, Inverter ON/ OFF/ FAULTY/ TRIP (Reason), Charger ON/ FAULTY or TRIP, Battery Low, Static by-pass ON, Over ON, Over temperature. Inbuilt Isolation Transformer of 1:1 ratio connected in Delta- Star Mode. Battery set Complete with self-standing cubicle or cabinet. The UPS should have external automatic load transfer switch for parallel operation.
Regulated Sealed Lead Acid Battery, Construction type : AGM or VRSLAB in ABS Flame Retardant Rating (12V SMF Battery - 42AH ~ 65AH) (Battery Make- Amararaja /Quntra/Exide Power Safe. Back-up time: 30 Min at full load. Warranty: One Year on UPS and One Year on SMF Battery on-site against any manufacturing defects. Certificate ISO 9001:2015, ISO 14001:2015, ISO 18001,OHSAS 18001. CE Certification: IC/ EN 62040-1-1, IEC/EN 50091- 1, IEC/EN 60950(Safety), IEC/ EN 5009I-2, IEC/ EN 62040-2 (EMC Emmission). IEC/EN 62040-3 (Performance & Design), IEC/EN 61000-4(EMC Emmunity) & IEC/EN 60146 (Design & Manufacture) (Make: APC-Schneider Electric / NUMERIC/ Power One/ VERTIV/ Switching AVO/ Powersafe/ Delta/Better Power/Prostarm)
SITC of 20 KVA UPS including Battery Bank of (15600 ~ 16128) VAH or higher (SMF Battery 12 Volt, 42AH ~ 65AH) 3ph Input /3ph Output, Static by-pass arrangement, compitable with D.G.Set, DSP controlled IGBT based rectifier with minimum 90% efficiency on 100% Load. The UPS shall be provided with active input P.F. Correction system to obtain 0.9 lag at 100% resistive Load, Wave form - Pure sine wave, Crest Factor- 3:1 it should be capable of operating in 50°c above ambient temperature, Built in Solid State float cum boost charger with automatic boost / trickle charge mode with current Limiting features. The charger should be designed for at least 15% of the total battery current. The UPS should have current limiting protection, built in over load/ Short circuit protection with snubber circuits for current limit. Soft start arrangement, Over voltage / under voltage protection, mains ON, Inverter ON/ OFF/ FAULTY/ TRIP (Reason), Charger ON/ FAULTY or TRIP, Battery Low, Static by-pass ON, Over ON, Over temperature. Inbuilt Isolation Transformer of 1:1 ratio connected in Delta- Star Mode. Battery set Complete with self-standing cubicle or cabinet. The UPS should have external automatic load transfer switch for parallel operation.
Regulated Sealed Lead Acid Battery, Construction type : AGM or VRSLAB in ABS Flame Retardant Rating (12V SMF Battery - 42AH ~ 65AH) (Battery Make- Amararaja /Quntra/Exide Power Safe. Back-up time: 30 Min at full load. Warranty: One Year on UPS and One Year on SMF Battery on-site against any manufacturing defects. Certificate ISO 9001:2015, ISO 14001:2015, ISO 18001,OHSAS 18001. CE Certification: IC/ EN 62040-1-1, IEC/EN 50091- 1, IEC/EN 60950(Safety), IEC/ EN 5009I-2, IEC/ EN 62040-2 (EMC Emmission). IEC/EN 62040-3 (Performance & Design), IEC/EN 61000-4(EMC Emmunity) & IEC/EN 60146 (Design & Manufacture) (Make: APC-Schneider Electric / NUMERIC/ Power One/ VERTIV/ Switching AVO/ Powersafe/ Delta/Better Power/Prostarm)
SITC of 10 KVA UPS including Battery Bank of (6720 ~ 8064) VAH or higher (SMF Battery 12 Volt, 28AH ~ 42AH) 3ph Input /3ph Output, Static by-pass arrangement, compitable with D.G.Set, DSP controlled IGBT based rectifier with minimum 90% efficiency on 100% Load. The UPS shall be provided with active input P.F. Correction system to obtain 0.9 lag at 100% resistive Load, Wave form - Pure sine wave, Crest Factor- 3:1 it should be capable of operating in 50°c above ambient temperature, Built in Solid State float cum boost charger with automatic boost / trickle charge mode with current Limiting features. The charger should be designed for at least 15% of the total battery current. The UPS should have current limiting protection, built in over load/ Short circuit protection with snubber circuits for current limit. Soft start arrangement, Over voltage / under voltage protection, mains ON, Inverter ON/ OFF/ FAULTY/ TRIP (Reason), Charger ON/ FAULTY or TRIP, Battery Low, Static by-pass ON, Over ON, Over temperature. Inbuilt Isolation Transformer of 1:1 ratio connected in Delta- Star Mode. Battery set Complete with self-standing cubicle or cabinet. The UPS should have external automatic load transfer switch for parallel operation.
Regulated Sealed Lead Acid Battery, Construction type : AGM or VRSLAB in ABS Flame Retardant Rating (12V SMF Battery - 28AH ~ 42AH) (Battery Make- Amararaja /Quntra/Exide Power Safe. Back-up time: 30 Min at full load. Warranty: One Year on UPS and One Year on SMF Battery on-site against any manufacturing defects. Certificate ISO 9001:2015, ISO 14001:2015, ISO 18001,OHSAS 18001. CE Certification: IC/ EN 62040-1-1, IEC/EN 50091- 1, IEC/EN 60950(Safety), IEC/ EN 5009I-2, IEC/ EN 62040-2 (EMC Emmission). IEC/EN 62040-3 (Performance & Design), IEC/EN 61000-4(EMC Emmunity) & IEC/EN 60146 (Design & Manufacture) (Make: APC-Schneider Electric / NUMERIC/ Power One/ VERTIV/ Switching AVO/ Powersafe/ Delta/Better Power/Prostarm)
Rate should include all taxes, other charges & L.W.C (if any). Work should be completed as and when required and as per the direction of the administration
ASIM KRISHNA MODAK
MITRA ELECTRONICS
technical_1513712.pdf
PDF • 0.09 MB
techsummary_1513712.pdf
PDF • 0.10 MB
finance_1513712.pdf
PDF • 0.05 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_1513712.pdf
PDF • 0.10 MB
AOC.pdf
PDF • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .