Tender Value
₹27.1 L
EMD Value
₹2.7 L
Closing Date
30 May 2026, 5:00 pmClosed
EE MI SBR
EE MI SBR
Construction of check dam at Belan Nadi , village - Sarayee , Block- Chatara , Distt.-Sonbhadra
2026_UPMID_1147655_4
134DATE-06-05-2026
Open Tender
Civil Works
Fixed-rate
45 days
sonbhadra
Please refer Tender documents.
2 documents required · 2 mandatory
₹860
EE MI SBR
₹2.7 L
28 Sept 2026
23 May 2026
1 Jun 2026
23 May 2026
30 May 2026
23 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dewatering work by 5 HP Diesel pump set with operator & P.O.L. | 408 | Hrs. | 175 | ₹71,400 |
| 2 | Site Clearence before work | 5,000 | sqm. | 3.4 | ₹17,000 |
| 3 | Making approach road With o/soil up to 1.50 m. lift & 30m.lead i/all complet. | 80 | MD | 330 | ₹26,400 |
| 4 | Earth work excavation in ordinary soil / kanker mixed hard soil I/c incl all ID SOR Chap. V Sl.No. 6(a) + 18 | 4,014.37 | cum. | 94 | ₹3,77,350.78 |
| 5 | Excavation of foundation in ordinary soil/sandy loam, clay or sand including all. as directed by Engineer-in-charge . As per ID SOR Chap. V Sl.No. 1(a) + 17 | 67.55 | cum. | 101.7 | ₹6,869.84 |
| 6 | Removal of slush from nala bed before excavation s.soil . incl all ID SOR Chap. V Sl.No. 1(iii) With 5 Lift | 35.32 | cum. | 120 | ₹4,238.4 |
| 7 | Excavation of foundation in ordinary soil/sandy loam, clay or sand including all. as directed by Engineer-in-charge . ID SOR Chap. V Sl.No. 1(i) + 17 with 5 lift | 247.25 | cum. | 117.7 | ₹29,101.33 |
| 8 | P.C.C. Work with 1:3:6 (cement,c/sand & 20-40 mm s/ballast i/all cost of material, labour etc. Required for proper completion of work. | 150.41 | cum. | 5,048.22 | ₹7,59,302.77 |
| 9 | R.C.R. Stone masonary work in 1:4 (cement :c/sand) morter i/all the cost of material, labour etc. required for proper complition of the work in foundation. | 35.69 | cum. | 4,733.55 | ₹1,68,940.4 |
| 10 | R.C.R. Stone masonary work in 1:4 (cement :c/sand) morter i/all the cost of material, labour etc. required for proper complition of the work in superstructure. | 71.4 | cum. | 4,733.55 | ₹3,37,975.47 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_2150982.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .