| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 990600.68₹9.9 LAccepted-AOC NO 57 BAJANAI KOVIL STREET ARUTHIRAPATTU VILLAGE TIRUVANNAMALAI 606806 | ARUTHIRAPATTU | TIRUVANNAMALAI | TAMIL NADU | 606806 | ₹9.9 L | 990600.68 | Accepted-AOC lowest amount |
| 2 | 993574.68₹9.9 LRejected-Finance NO 38 BAJANAI KOVIL STREET ARUTHIRAPATTU VILLAGE AND POST TIRUVANNAMALAI TALUK TIRUVANNAMALAI DISTRICT | TIRUVANNAMALAI | TIRUVANNAMALAI | TAMIL NADU | ₹9.9 L | 993574.68 | Rejected-Finance Highest Amount Quoted |
| Sl No | Description | Qty | Unit | Elumalai R L2 | SAI RAM ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00Strengthening of the road in Su.Pappambadi ADC Burial Ground Road in ADC Colony @ Su.Pappambadi Panchayat | |||||
| 1.01 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 252 | Cum | 6.36 ₹1,602.72 | 6.36 ₹1,602.72 |
| 1.02 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 94.5 | Cum | 131.89 ₹12,463.61 | 131.89 ₹12,463.61 |
| 1.03 | Collection and supply of Grity gravel for side berms and labour charges for filling etc complete | 47.25 | Cum | 509.89 ₹24,092.30 | 509.89 ₹24,092.30 |
| 1.04 | Picking up existing BT surface upto 5 to 10 cm of old metalled surface , cambering, sectioning of carriage way etc., complete | 350 | Sqm | 23.36 ₹8,176 | 23.36 ₹8,176 |
| 1.05 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 157.5 | Cum | 2,413.72 ₹3.8 L | 2,413.72 ₹3.8 L |
| 1.06 | Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 1,050 | Sqm | 87.23 ₹91,591.50 | 87.23 ₹91,591.50 |
| 1.07 | Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 1,050 | Sqm | 22.5 ₹23,625 | 20.1 ₹21,105 |
| 1.08 | Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 26.25 | Cum | 11,407.72 ₹3.0 L | 11,407.72 ₹3.0 L |
| 1.09 | Provision for Name Board | 1 | Nos | 1,000 ₹1,000 | 1,000 ₹1,000 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
9 Mar 2026, 3:00 pmClosed
Block Development Officer(BP),Tiruvannamalai
Block Development Office, Tiruvannamalai
Strenthening of the Road in Su.Pappambadi ADC Burial Ground Road in ADC Colony Su.Pappambadi Panchayat
2026_RDTN_670265_1
BA3/928/2025
Open Tender
Civil Works
90 days
Tiruvannamalai
Refer to Tender Documents
2 documents required · 2 mandatory
₹0
₹10,000
10 Apr 2026
5 Mar 2026
9 Mar 2026
5 Mar 2026
9 Mar 2026
5 Mar 2026
Strengthening of the road in Su.Pappambadi ADC Burial Ground Road in ADC Colony @ Su.Pappambadi Panchayat
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Collection and supply of Grity gravel for side berms and labour charges for filling etc complete
Picking up existing BT surface upto 5 to 10 cm of old metalled surface , cambering, sectioning of carriage way etc., complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
technical_805508.pdf
techsummary_805508.pdf
finance_805508.pdf
BOQ Comparative Chart
xlsx
finsummary_805508.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html