Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.5 LAdmitted-Finance | -5.50% | ₹9.5 L | L1 | Admitted-Finance |
| 2 | L2₹9.9 LAdmitted-Finance | -1.20% | ₹9.9 L | L2 | Admitted-Finance |
| 3 | L3₹10.2 LAdmitted-Finance | +2.00% | ₹10.2 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical insufficient docs |
Tender Value
₹10.3 L
EMD Value
₹20,600
Closing Date
3 Feb 2026, 6:00 pmClosed
Block Development Officer
Rangli Rangliot Dev.Block Takdah
Construction of C.C. Road from Krishna Sharma House to S.S.K. Bhajane under Rongchong G.P
2026_DMD_991332_1
01/RR/BDO/APAS/2025-26, Date- 20/01/2026
Open Tender
CIVIL WORKS
60 days
Rongchong
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹20,600
10 Mar 2026
20 Jan 2026
6 Feb 2026
21 Jan 2026
3 Feb 2026
21 Jan 2026
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding, laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1.5 m
Laying soling to proper camber, hand packing, spreading powdered earth in the interstices with boulder carrying from Rambi river bed
Cost of Boulder
(I) Cement concrete with graded stone ballast (40 mm size) excluding shuttering.In ground floor. N.B. Variety Stone metal (a) 1:3:6 proportion
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course,scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:4 cement mortar (b) 15 mm thick plaster
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In- Charge.
Add GST 18%
Add Cess 1%
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
technical_2423825.pdf
techsummary_2423825.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.61 MB
SBD.pdf
Tender Documents • 0.47 MB
BOQ_2423825.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid