| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 0 BAANGAD WALTERGANJ BASTI BASTI UTTAR PRADESH 272182 | BASTI | UTTAR PRADESH | 272182 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance 0 DHANA TEJA BARARI DHANA TEJA MATHURA MATHURA UTTAR PRADESH 281005 | MATHURA | UTTAR PRADESH | 281005 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical 02 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹66 L
EMD Value
₹33,000
Closing Date
15 May 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER EDC MALVIYA ROAD BASTI
Electrification of Atal Awasiya School Village Basewarai Block Parshurampur under EDD Harraiya
2023_PVVNV_798412_1
01/EDC(B)/2023-24
Open Tender
Electrical Works
Turn-key
BASTI
AS PER TENDER
2 documents required · 2 mandatory
₹3,540
S.E.EDC Basti
₹33,000
25 May 2023
21 Apr 2023
15 May 2023
21 Apr 2023
15 May 2023
21 Apr 2023
11 ds0oh0 ykÃu
,e0,l0 11 ds0oh0 ØkWLk vkeZ oh0 VkÃi
11 ds0oh0 ikfyej fiu baLkqysVj
,e0,l0 vfFkZax jkM ¼20x2540 mm½
,e0,l0 11 ds0oh0 dzkWl czsflax
,e0,l0 11 ds0oh0 ,e0,l0 Vki pSuy
11 ds0oh0 ikfyej fMLd baLkqysVj
ds0oh0 ikfyej fMLd fQfVax
th0vkbZ0 LVs lsV 16x1800 ,e0 ,e0
LVs ok;j GSS Wire
th0vkbZ0ok;j 6 SWG
11 KV tee off channel
11 kv ,e0,l0 xkfMZax ,afxy
cj kit OD 11 kv 3*120mmsq
cj kit ID 11 kv 3*120mmsq
cj kit OD 11 kv 3*300mmsq
cj kit ID 11 kv 3*300mmsq
33 kv top channel
dropper angle
33 kv fuse set
Structure for 33 KV Bus-Isolator
33 KV Lightening Arrestor (3Nos. in a set)
Structure for 33 KV Lightening Arrestor
,e0,l0 dzkl vkeZ gksfYMax DySEi
th0vkb0 ckjcsM ok;j
MsUtj cksMZ DySEi lfgr
uV ,oa cksYV
ih0th0 DySEi
,e0,l0 LVs DySEi
,e0,l0 ^bZ&czSdsV^ ¼,e0,l0 fLVªi½
pSuy czsfdV
,ywfefu;e iSUV
jSM vkfDlkbM iSUV
,e0,l0 gksfYMax DySEi Vki pSuy gsrq
,e0,l0 gksfYMax DySEi xkfMZax ,afxy gsrq
,e0,l0 czsflax DySEi
Vh0 vkQ DySEi
Mªkij ,afxy DySEi
dsfcy gksYMhxa DySEi
PG Clamp for Dog
Cu. Control Cable 2x2.5 mm2
Cu. Control cable 4x2.5 mm2
Rubber mat
ih0lh0lh0 iksy 8-5 eh0 yEck
,l0 Vh0 iksy 11 ehVj yEck
,0 lh0 ,l0 vkj0 weasel dUMDVj
3*120 mmsq 11 ds0oh0 dsfcy
3*300 mmsq 11 ds0oh0 dsfcy
11 KV Outgoing VCB 200/100/5A 350 MVA
11 kv CT/PT unit 50/5 A
11 kv PPMC 50/5 A
11 kv TVM
11KV line Work Part
Shifting, Loading and carriage of Pole, accessories,etc.(centralised /decentralised items) from store to site.
Erection of poles with fitting of all acesories
Laying / spreading/stringing of 3 phases of ACSR dog cond.
Pole number painting with paint.
Concreting (grouting) of poles inratio 1:4:8(cement:sand:40mm brick ballast:)
Plinthing (muffing) of pole.
Concreting of stay set complete.
Cutting of tree branches and disposal of same.
HT connection/ disconnection of 33 kv line.
Carriage of 11 kv XLPE Cable 3*120 mm2 with loading unloading & stacking
Laying 11 KV, (3*120) mm2 XLPE double ckt, Cable from power in the cable trench 0.45 m wide, 0.90m depth. Providing 150 mm local sand for cushion beneath and 150 mm above the cable (quantity of local sand required 0.375 cubm/m in length). The cable shall be duly protected by brick. On both side of cable by laying brick vertically and bricks would also be laid horizontally on top of vertically laid bricks along the cable (minimum 18 Nos. of bricks per mtr. length are to be laid top and outer side along the cable. (double circuit)
Laying 11 KV, (3*120) mm2 XLPE overhead on 11 mtr ST poles with proper fixing and clamping (double circuit)
Jointing charges with 11 kv CJ kit
Digging of kaccha /pakka road and restorration with inserting 6 inch Gipipe Double ckt 5 mtr
Laying of 11 v xlpe cable in air after provind 6 inch dia GI pipe 2.5 mtr long
Other small items and works rreq. Complete the work.
Carriage of CT/PT metering unit 50/1 A, 11 kv PPMC ,11 kv TVM, other small items with loading unloading & stacking
Errection and mounting of 11 kv CT/PT and 11 KV PPMC complete work
Errectionand mounting of 11 kv TVM
Installation of 11 kv pifer proof metering cubicle.
Earthing of CT/PT and PPMC with earth strip
Shifting, Loading, carriage of following structures.
(a) 33 KV L.A. with structure
(b) 33 KV fuse with set structure
(c) 11 kv xlpe cables
(d) 11 kv outgoing panel
(e) All other small items
Erection,Grouting of following fabricated structures as per RESSPO Drawing.
(a) 33 KV L.A. structure
(b) 33 KV fuse set structure
(c) 11 kv outgoing VCB in control room.
Erection,mounting and fitting of equipment on erected structures as per RESSPO Drawing.
(a) 33 KV L.A.
(b) 33 KV fuse set
Rrepairing of old Plinth for 10 MVA Transformer and provind temporary base for 5 MVA TF
Shifting of old 5 MVA TF about 50 mtr distance from Tfplinth including opening of jumpers ,earthing,conservator tank,radiator,emptying of oil with complete work.
Installation of 33/11 KV, 10 MVA Transformer as per following
Shifting of 10 MVA 33/11 KV, Transformer to transformer plinth in Switch Yard.
Erection of shifted Transformer at plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage, complete job in all respect.
Carriage old 5 MVA TF from site to store center.
Fabrication and erection of neutral earthing L Type support made of M.S. Channel size 100 x 50 mm. Structure shall be 4 Mtr. long with 1 Mtr. Arms. Structure shall be grouted in ratio 1:3:6 in block size 300 x 300 x 700 mm and painted with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint work includes connecting neutral bushing rod of power Transformer and M.S. Earthing strip with the help of flexible copper bond, M.S. Bolt and washer.
Fabrication and erection of cable support made of two pieces of M.S. Angle (50 x 50 x 6) / 65 x 65 x 6) mm, 2.75 meter long, joined to each other by means of 5 Nos. M.S. Flat (50×6)mm pieces of size 150 mm long each by welding at equal intervals and grouting in a block of size (300 x 300 x 700) mm in CC 1 : 3 : 6 complete with one coat of ready mixed primer and two coats of Al. paint. Work includes providing of three Nos. M.S. clamps made of (50 x 6) mm M.S. Flat for holding the cable including nuts and bolts.
Dismentalling of old switchyard structures and equipments for setting of new equipments and again reseeting complete work.
Boring and lowering of DELTA earthing with 3 no.G.I. Pipe size 2.25 inch dia… into the ground up to water level 30mtr., with the lower end of solid copper cone Approx 225mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the M.S. earth Strip for Transformer neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support and two number power TF body earthinf with GI pipe of 3 inch 30 mtr. as per req compete work with ms earth strip and welding jointing.
Proper fixing and making bus bar connection in between two switch gears after proper cleaning. Work also include proper insulation, taping by empire, PVC and H.T. tape etc.
H.T. Power Cable Laying :
Laying 11 KV, (3 x 300) and (3*120) mm2 XLPE, Cable from power transformer to 11 KV Incoming switch gear ,outgoing switchgear in the cable trench 0.45 m wide, 0.90m depth. Providing 150 mm local sand for cushion beneath and 150 mm above the cable (quantity of local sand required 0.375 cubm/m in length). The cable shall be duly protected by brick. On both side of cable by laying brick vertically and bricks would also be laid horizontally on top of vertically laid bricks along the cable (minimum 18 Nos. of bricks per mtr. length are to be laid top and outer side along the cable. (double circuit)
Jointing of following 11 KV Power Cable ends :
Making of 11 KV XLPE Heat shrinkable out door jointing kits after duly plumbing and taping of cable, providing, fixing and crimping of proper size good quality lugs.
Copper Control Cable Laying as per following.
Laying of different size of (2 x 2.5)mm2 / (4 x 2.5) mm2 control cables i.e. from Buchholz realy to Marshalling box Marshalling box to indication protection board in switch gear room, 33 KV CT's to CT's Junction Box, CT 33 KV, V.C.B. Control Panel , and 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box and indication board as per required for installed equipment as per requirement.
Earthing of all indoor equipments by laying and providing M.S. earth strip (40 x 6) mm including cutting, bending and welding etc.
painting of all substation structures including old .
Earthing of Outdoor equipment with G.I. Strip with Earth Mat work.
Testing of all 33 /11 KV Switchgears and S/S Pannels etc.
All other carriage,erection and small works/materials associated to successfully complete the work in all respect.
dismantalling and restting of security for completion of works
M/S MISHRA CONSTRUCTION CO
M/S CHAUDHARY CONSTRUCTION COMPANY
M/S BABA ENTERPRISES
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .