Loading…
Loading…
Tender Value
₹6.7 Cr
EMD Value
₹13.4 L
Closing Date
4 Sept 2026, 5:00 pm
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Internal development work of pocket-9A, sector -18 (road drain and sewer) yeida WC -01.
2026_YEIDA_1178363_16
YEA/GM(PROJECT)/2026/566 DT-18/08/2026
Open Tender
Civil Works
Fixed-rate
365 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹6,670
₹13.4 L
21 Aug 2026
21 Aug 2026
7 Sept 2026
21 Aug 2026
4 Sept 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | ROAD WORK:
Clearing grass and removal of the rubbish up to a distance of 50m Outside the periphery of the area cleared. Based on UPPWD SOR-2020/2.32 DAR | 38,142 | Sqm | 3.1 | ₹1,18,240.2 |
| 2 | Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirement of lines , grades and cross sections and transporting to the embankment location within all lifts and lead upto 1000 meter. Morth 301 (Morth/UPPWD/SOR-BSR) | 23,627.4 | Cum | 352.4 | ₹83,26,295.76 |
| 3 | Extra for compaction of earth work in embankment under optimum moisture conditions to give at least 95% of the maximum dry density(proctor density) Based on UPPWD SOR-2020/1 6.2 | 7,812.64 | Cum | 9.6 | ₹75,001.34 |
| 4 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth lead upto 50 metres. Based on UPPWD SOR-2020/1 6.1 | 15,625.28 | Sqm | 1.9 | ₹29,688.03 |
| 5 | Supplying and stacking stone aggregate at site 90mm to 45 mm size stone aggregate Based on UP PWD SOR-2020/ 1 6.3.1 | 1,951.21 | Cum | 2,518.13 | ₹49,13,400.44 |
| 6 | 63 mm to 45 mm size stone aggregate Based on UP PWD SOR-2020/ 1 6.3.2 | 2,039.38 | Cum | 2,571.56 | ₹52,44,388.03 |
| 7 | 53 mm to 22.4 mm size stone aggregate Based on UPPWD SOR-2020/ 1 6.3.3 | 1,390.81 | Cum | 2,635.44 | ₹36,65,396.31 |
| 8 | Laying spreading and compacting stone aggregate of specified sizes to WBM specifications including spreading in uniform thickness, hand picking, rolling with 3 wheeled road! vibratory roller 8-10 tonne in stages to proper grade and camber, applying and brooming requisite type of screening! binding material to fill up interstices of coarse aggregate watering and compacting to the required density. Based on UPPWD SOR-2020/16.4 | 5,381.41 | Cum | 381.05 | ₹20,50,586.28 |
| 9 | Supplying and stacking of Morrum at site. Based on UPPWD SOR-2020/16.3.10 | 1,242.44 | Cum | 2,602.92 | ₹32,33,971.92 |
| 10 | Brick edging in full brick width and half brick depth including excavation, refilling and disposal of surplus earth lead upto 50 metres. With F.P.S. bricks of class designation 150 Based on UP PWD SOR-2020/16.7.1 | 4,858 | Rmt. | 139.95 | ₹6,79,877.1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.71 MB
16.pdf
Tender Documents • 1.41 MB
BOQ_2215517.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].