Tender Value
₹3 Cr
EMD Value
₹6 L
Closing Date
26 Aug 2026, 6:00 pmClosed
SUPERINTENDING ENGINEER PHED CIRCLE DAUSA
SUPERINTENDING ENGINEER PHED CIRCLE DAUSA
RATE CONTRACT FOR CONSTRUCTION AND COMMISSIONING OF THREE PHASE TUBEWELL UNDER CIRCLE DAUSA WITH 5 YEAR O and M INCLUDING 2 YEARS DEFECT LIABILITY PERIOD
2026_PHCJA_589236_1
NIT NO 04-07/2026-27 SE DAUSA
Open Tender
Civil Works - Water Works
Percentage
365 days
Se dausa
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
EXECUTIVE ENGINEER DAUSA
₹6 L
Yes
1 Oct 2026
17 Aug 2026
27 Aug 2026
17 Aug 2026
26 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction & Comm. Of 200 MM TW | - | - | - | - |
| 2 | Construction of tube well from ground level & up to 100 mtr depth to accommodate housing and assembly pipe of following sizes in all type of alluvium strata unconsolidated formation such as pebbles, boulders etc. by percussion/rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications, with gravel as per IS:4097-1967 and it's packing as per IS: 2800 (Part I & II) 1979 as amended up to date (the work includes the cost of gravel & it's primary packing and packing during development, lowering of housing & strainer assembly pipes with supply and wrapping of coir-rope, wherever necessary for arresting fine sand particles and development work, but excluding the cost of housing and strainer pipe assembly). The work would be completed after obtaining sand
free water.
Nominal bore 200 mm dia. | 1 | Mtr | 1,290.68 | ₹1,290.68 |
| 3 | Add 15% extra on above item (Item no 2.1.1 to 2.1.3) for drilling depth beyond 100 mtr and up to 200 mtr, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr.
Nominal bore 200 mm dia. | 1 | Mtr | 193.6 | ₹193.6 |
| 4 | Construction of Tube Well from ground level and up to 100 mtr. depth to accommodate housing and assembly pipe in all type of alluvium strata, unconsolidated formation such as pebbles, boulders etc. by percussion/ rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications for removal of overburden. The work includes the cost of lowering of casing pipe, but excludes the cost of casing pipe.
Nominal bore 200 mm dia. | 1 | Mtr | 1,039.83 | ₹1,039.83 |
| 5 | Add 15% extra on above item (Item No 2.2.1 to 2.2.2) for drilling depth beyond 100 mtr, rate shall be applicable for only extra depth beyond 100 mtr .
Nominal bore 200 mm dia. | 1 | Mtr | 155.97 | ₹155.97 |
| 6 | Construction of tube well from ground level and up to 100 mtr depth and above to accommodate housing assembly pipe in all type of unconsolidated formation such as pebbles, boulders, collapsible formation etc. by Odex drilling method as per IS: IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work will include lowering of housing and strainer pipe assembly and casing shoe including cost of casing shoe, but excluding cost of the casing pipe. The work would be completed after
obtaining sand free water.
Nominal bore 200 mm dia. | 1 | Mtr | 1,415.25 | ₹1,415.25 |
| 7 | Add 15% extra on above item (Item No 2.2.1 to 2.2.2) for drilling depth beyond 100 mtr, rate shall be applicable for only extra depth beyond 100 mtr .
Nominal bore 200 mm dia. | 1 | Mtr | 212.29 | ₹212.29 |
| 8 | Construction of tube well after completion of drilling by rotary /percussion method & up to 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe.
Nominal bore 200 mm dia. | 1 | Mtr | 1,070.34 | ₹1,070.34 |
| 9 | Add 15% extra on above item (Item No 2.3.1 to 2.3.3) for drilling depth beyond 100 mtr and up to 200 mtr from ground level, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr.
Nominal bore 200 mm dia. | 1 | Mtr | 160.55 | ₹160.55 |
| 10 | Add 30% extra on above item (Item No 2.3.1 to 2.3.3) for drilling depth beyond 200 mtr and from ground level, rate shall be applicable for only extra depth beyond 200 mtr.
Nominal bore 200 mm dia. | 1 | Mtr | 321.1 | ₹321.1 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
TD04.pdf
Tender Documents • 1.94 MB
BOQ_1046346.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .