| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹76.5 LAccepted-Finance | ₹76.5 L | 1 | Accepted-Finance Lowest |
| 2 | Rejected-Technical NO 205 KAMMAN DHARWAJA STREET BHARATHI SALAI TRIPLICANE CHENNAI 600 005 | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | Kanniappa Electricals L2 | SAMPATH L1 |
|---|---|---|---|---|---|
| 1.00Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls | |||||
| 1.01 | Dismantling Brick work | 13 | M3 | 250 ₹3,835 | 240 ₹3,681.6 Lowest |
| 1.02 | Wall plastering chipping | 290 | M2 | 350 ₹1,19,770 | 6 ₹2,053.2 Lowest |
| 1.03 | Dismantling Floor tiles | 390 | M2 | 150 ₹69,030 | 72 ₹33,134.4 Lowest |
| 1.04 | Dismantling Existing False ceiling & Partition | 140 | M2 | 110 ₹18,172 Lowest | 173 ₹28,579.6 |
| 1.05 | Dismantling RCC | 2.25 | M3 | 380 ₹1,008.9 Lowest | 4,485 ₹11,907.68 |
| 1.06 | Dismantling Pressed tiles and Weathering Course | 255 | M2 | 250 ₹75,225 | 53 ₹15,947.7 Lowest |
| 2.00 | Removing all the corroded dust particles in the reinforcement carefully & check the reinforcement (i.e) the Dia of rod should not be corroded more than 20% of orginal dia using vernier caliper, if the dia of corroded rod exceeds more than 20%, additional strengthing will be provided equvalent to the orginal dia of rod. After strengthing Anti corrosive Fosrec Nitrobond coating will be applied over all the exposed surface. The rate inclusive of both labour and material. | 35 | M2 | 200 ₹8,260 | 160 ₹6,608 Lowest |
| 3.00 | Supply and providing Fosrec Rendro chemical micro concrete over the anti corrosion coating of required thickness to match the orginal surface level. The rate inclusive of scoffolding, labour and material etc., | 35 | M2 | 750 ₹30,975 | 229 ₹9,457.7 Lowest |
| 4.00 | Anchoring of steel reinforcement bars into concrete, including drilling holes to a depth typically 10–15 times the rebar diameter using a rotary hammer drill with carbide-tipped bits; thorough cleaning of the drilled holes using compressed air and brushes to remove all dust and debris; preparation and injection of approved chemical adhesive or grout into the holes; insertion of reinforcement bars with a twisting motion to ensure proper bonding; ensuring correct alignment and specified embedment length; and allowing the anchors to cure undisturbed for the period recommended by the manufacturer, all complete as per specifications | 20 | Nos | 450 ₹10,620 | 350 ₹8,260 Lowest |
Tender Value
Refer Docs
EMD Value
₹55,000
Closing Date
17 Jul 2026, 3:00 pmClosed
General Manager (Services)
417, Pantheon Road, Egmore, Chennai 600 008
Renovation of ground-floor for CT Stimulator Room and construction of first floor at RT Building, Government Stanley Medical College and Hospital, Chennai
2026_TNMSC_683609_1
2/TNMSC/CIVIL/BUNKER/26Stanley
Open Tender
Civil Works - Buildings
Lump-sum
Chennai
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹55,000
Yes
17 Jul 2026
2 Jul 2026
17 Jul 2026
2 Jul 2026
17 Jul 2026
10 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls | |||||
| 1.01 | Dismantling Brick work | 13 | M3 | - | - |
| 1.02 | Wall plastering chipping | 290 | M2 | - | - |
| 1.03 | Dismantling Floor tiles | 390 | M2 | - | - |
| 1.04 | Dismantling Existing False ceiling & Partition | 140 | M2 | - | - |
| 1.05 | Dismantling RCC | 2.25 | M3 | - | - |
| 1.06 | Dismantling Pressed tiles and Weathering Course | 255 | M2 | 30 | ₹7,650 |
| 2 | Removing all the corroded dust particles in the reinforcement carefully & check the reinforcement (i.e) the Dia of rod should not be corroded more than 20% of orginal dia using vernier caliper, if the dia of corroded rod exceeds more than 20%, additional strengthing will be provided equvalent to the orginal dia of rod. After strengthing Anti corrosive Fosrec Nitrobond coating will be applied over all the exposed surface. The rate inclusive of both labour and material. | 35 | M2 | - | - |
| 3 | Supply and providing Fosrec Rendro chemical micro concrete over the anti corrosion coating of required thickness to match the orginal surface level. The rate inclusive of scoffolding, labour and material etc., | 35 | M2 | 28 | ₹980 |
| 4 | Anchoring of steel reinforcement bars into concrete, including drilling holes to a depth typically 10–15 times the rebar diameter using a rotary hammer drill with carbide-tipped bits; thorough cleaning of the drilled holes using compressed air and brushes to remove all dust and debris; preparation and injection of approved chemical adhesive or grout into the holes; insertion of reinforcement bars with a twisting motion to ensure proper bonding; ensuring correct alignment and specified embedment length; and allowing the anchors to cure undisturbed for the period recommended by the manufacturer, all complete as per specifications | 20 | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_821733.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_821733.xls
BOQ • 0.39 MB
TenderdocumentStanley.pdf
Tender Documents • 1.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].